| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr Quoted ₹1.9 Cr | L1 | Accepted-AOC agreement executed by L1 |
| 2 | L2₹1.9 CrRejected-AOC | ₹1.9 Cr | L2 | Rejected-AOC agreement executed by L1 |
| 3 | L3₹2.0 CrRejected-Finance | ₹2.0 Cr | L3 | Rejected-Finance L1,L2 admitted |
| Sl No | Description | Qty | Unit | Binoy P T L1 | GM Engineers and Contractors L3 | MOHAMMED ARSHAD P A L2 |
|---|---|---|---|---|---|---|
| 1.00Appendix A - Box Culvert | ||||||
| 1.00 | OD189753/2025-2026: RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023) | 53 | metre | 385 ₹20,405 | 6,000 ₹3.2 L | 387.22 ₹20,522.66 |
| 1.00 | OD149076/2025-2026:
Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete (as per approved observed data of Building 50.2.3.1) | 300 | hour | 390 ₹1.2 L | 480 ₹1.4 L | 392.38 ₹1.2 L |
| 1.00 | OD148492/2025-2026:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete.(As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023) | 1,620 | metre | 180 ₹2.9 L | 252 ₹4.1 L | 181.65 ₹2.9 L |
| 1.00 | OD148490/2025-2026:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length. (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023) | 1,620 | metre | 278 ₹4.5 L | 300 ₹4.9 L | 279.68 ₹4.5 L |
| 1.00 | OD148491/2025-2026:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023) | 27 | each | 259 ₹6,993 | 235 ₹6,345 | 260.54 ₹7,034.58 |
| 1.01 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br> | 400.15 | cum | 68 ₹27,209.93 | 300 ₹1.2 L | 68.82 ₹27,538.05 |
| 1.01 | 13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material | 35.61 | cum | 3,127 ₹1.1 L | 2,835 ₹1.0 L | 3,146.82 ₹1.1 L |
| 1.01 | OD148528/2025-2026:Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023) | 53.41 | cum | 3,991 ₹2.1 L | 4,072 ₹2.2 L | 4,016.56 ₹2.1 L |
| 1.01 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 17.8 | cum | 9,194 ₹1.6 L | 7,784 ₹1.4 L | 9,252.92 ₹1.6 L |
Tender Value
₹1.7 Cr
EMD Value
₹50,000
Closing Date
5 Feb 2026, 11:00 amClosed
Superintending Engineer,PWD Bridges,NC KKD
Office of the Superintending Engineer, PWD Bridges, North Circle, Thondayad, Kozhikode 673017
GENERAL-Arattuvazhy Tripple box culvert-Construction of Tripple boxculvert across Arappa blangachal thodu( Arattuvazhy ) at Eriyad GP in kaippamangalam LAC in Thrissur district-General Civil Work
2025_PWD_812190_4
PWD/BR/10850/2025-2026
Open Tender
Civil Works - Bridges
540 days
Eriyad GP, Kaipamangalam LAC
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,515
Yes
₹50,000
Yes
28 Feb 2026
29 Jan 2026
7 Feb 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
Appendix A - Box Culvert
OD189753/2025-2026: RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023)
OD149076/2025-2026: Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete (as per approved observed data of Building 50.2.3.1)
OD148492/2025-2026:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete.(As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023)
OD148490/2025-2026:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length. (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023)
OD148491/2025-2026:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023)
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
OD148528/2025-2026:Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023)
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.H.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M35 - Using Batching Plant, Transit Mixer and Concrete Pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.5.H.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - Using concrete Mixer - Height upto 5m
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.1D.1.1.A:"Furnishing and Placing RCC/PSC Grade M35 Using Concrete Mixer as per drawing and Technical Specification. For solid slab super-structure - Height upto 5m
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
OD189859/2025-2026:Drainage Spouts complete as per drawing and Technical specification
OD148755/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023)
14.7:Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, center to center spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Appendix B - Approach road
2.3.2.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle - By Mechanical Means
OD148845/2025-2026:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete.(As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023)
OD148846/2025-2026:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length. (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023)
OD148847/2025-2026:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m (As per approved data - CEPWD/1614/2021/Admn/PLA dt 29.04.2023)
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
OD148896/2025-2026:Dry Rubble Masonry for Retaining wall of river side including cost and conveyance of all materials, labour charges etc. complete.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.2.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.5.E.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
OD190277/2025-2026:providing Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site(refer from irrigation od 60.7.4)
OD190197/2025-2026:Non skid precast chequerred cement concrete tiles 22 mm thick in footpath jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand). Dark shade pigment using ordinary cement ( As per DAR 11.20.3.)
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
14.10:PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.
14.11:Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.
14.1D.2:Furnishing and Placing RCC/PSC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump in super-structure as per drawing and Technical Specification
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
15.9:Construction of dry rubble flooring at cross drainage works for relatively less important works.
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD189567/2025-2026:Providing , laying and rolling ofclose-graded premixsurfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using penetration grade bitumen to the required line,grade,and level to serve as wearing course on a previously prepared base,including mixing in asuitable plant,laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per technical clause 509 of MORTH
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
55.14:Providing and fixing retro-reflectorised ceramic tilesProviding and fixing retro-reflectorised ceramic tiles of size 10cmX20cm using High Intensity Micro Prismatic (Type IV) grade sheeting with 7 years warranty fixed over Ist quality ceramic glazed tiles including cost of glue, cutting charges, fixing with suitable adhisive on concrete or other surface etc complete.
8.4.2:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 60 cm equilateral triangle
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
55.10.1:Providing and erecting retro-reflectorised Object Hazard Marker 300mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801.300 mm x 900 mm
OD149071/2025-2026: Supplying and fixing Granite inauguration stone of size 900x600 mm including cost of granite, Lettering and fixing charge etc complete
OD149072/2025-2026:Engraving letters in hard stone (16.21 DAR)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1397586.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1397586.xls
BOQ • 0.34 MB
tgd.pdf
Other Document • 2.32 MB
viewnit.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid