Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.5 LRejected-Finance | ₹2.5 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | AJMAL P A L2 | MUSTHAFA K L1 |
|---|---|---|---|---|---|
| 1.00BUILDING WORK | |||||
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 0.36 | cum | 588.4 ₹210.06 | 582.51 ₹207.96 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.59 | cum | 2,965.13 ₹1,761.29 | 2,935.47 ₹1,743.67 |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 42.32 | sqm | 64.17 ₹2,715.61 | 63.52 ₹2,688.10 |
| 1.00 | 15.52:Dismantling of flushing cistern of all types (C.I. / PVC/ Vitrous China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead | 3 | each | 781.59 ₹2,344.77 | 773.77 ₹2,321.31 |
| 1.00 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metes and below | 2 | each | 124.63 ₹249.26 | 123.38 ₹246.76 |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.37 | cum | 295.14 ₹108.61 | 292.18 ₹107.52 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.56 | cum | 6,772.66 ₹3,779.14 | 6,704.93 ₹3,741.35 |
| 1.01 | OD493921/2024-2025:DRY RUBBLE MASONRY -Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials ,labour charges etc. complete as per direction of Deptl. officers at site. | 0.6 | cum | 3,469.84 ₹2,095.78 | 3,435.14 ₹2,074.82 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 0.19 | cum | 11,421.71 ₹2,124.44 | 11,307.49 ₹2,103.19 |
Tender Value
Refer Docs
EMD Value
₹6,353
Closing Date
9 Apr 2025, 6:00 pmClosed
ASSISTANT ENGINEER
Assistant Engineer Lid and Ew Section kulukkallur gp
RE - Annual Plan-KULUKKALLUR GP-2024-25 PANCHAYAT TOILET MAINTENANCE-PROJ NO - 13-2025
2025_LSGD_757278_15
05/AE/KLR/LSGD/2024-25
Open Tender
Civil Works - Buildings
KULUKKALLUR GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹565
Yes
₹6,353
Yes
KULUKKALLUR GP
13 Apr 2026
2 Apr 2025
10 Apr 2025
2 Apr 2025
9 Apr 2025
2 Apr 2025
3 Apr 2025
stage.html
html • 0.04 MB
techsummary_1230519.pdf
finsummary_1230519.pdf
aoc.pdf
finance_1230519.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1230519.xls
BOQ • 0.28 MB
viewsbdmerged.pdf
Tender Documents • 2.07 MB
Download all tender documents and submit your bid