Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC BUDOOBAGH NOWPORA 0 KHANYAR SRINAGAR JAMMU KASHMIR 190003 | SRINAGAR | JAMMU AND KASHMIR | 190003 | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.2 L+₹4.1 L (36.3%)Rejected-Finance 361 BEHIND DAV SCHOOL JAWAHAR NAGAR SRINAGAR 190008 | SRINAGAR | JAMMU AND KASHMIR | 190008 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Docs not found in Order |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
24 Mar 2024, 6:00 pmClosed
GE Khumbathang
GE Khumbathang
COMPREHENSIVE MAINT OF ELECTRIC FIRED CHS AND SOLAR WATER HEATING DEVICES AT GE KHUMBATHANG
2024_MES_644190_1
8001/GE/KHU-77
Open Tender
Support/Maintenance Service
Item Rate
270 days
Khumbathang
As per NIT Documents
8 documents required · 8 mandatory
₹500
GE Khumbathang
₹30,000
Yes
18 Jun 2024
27 Feb 2024
26 Mar 2024
27 Feb 2024
24 Mar 2024
11 Mar 2024
Amount
M&L for removing / opening of electric boiler control panel for checking serviceable state of control wiring and switches which includes replacement of minor parts (control wiring and other necessary items for making the panel serviceable) complete all as specifed and directed by Engr-In-Charge
Dismantling of mono block electric motor set of capacity 3 HP and taken it to civil workshop for rewinding the motor with existing size of super enamelled copper wire including all necessary insulating material and refixing the moter set at the original position and testing it on full load upto the entire satisfactrion of EIC complete all as specifed and directed by Engr-In-Charge (Note : Transpotation charge of motor from site to workshop and back is deemed to be included in the item rate) .
Dismantling of mono block electric motor set of capacity 5 HP and taken it to civil workshop for rewinding the motor with existing size of super enamelled copper wire including all necessary insulating material and refixing the moter set at the original position and testing it on full load upto the entire satisfactrion of EIC complete all as specifed and directed by Engr-In-Charge (Note : Transpotation charge of motor from site to workshop and back is deemed to be included in the item rate) .
Supply only glycol / coolant alongwith the necessary additives and inhibitor in cognition and supplied in barells complete all as specifed and directed by Engr-In-Charge
S&F heater bank of capicity 25 KW for electric based central heating system including thermostat as per the existing/suitable capacity all as specified and directed incl taking down old one complete all as specifed and directed by Engr-In-Charge
S&F heater bank of capicity 7 KW for electric based central heating system all as specified and directed incl taking down old one complete all as specifed and directed by Engr-In-Charge
S&F in repair heater bank of capicity 5 KW for electric based central heating incl thermostat of suitable capacity and other connected accessories incl taking down old one complete all as specifed and directed by Engr-In-Charge
Material & labour for complete decarbonising of boilers including replacement of damaged refractory complete all as specifed and directed by Engr-In-Charge
S&F pressure switch incl taking down old one complete all as specifed and directed by Engr-In-Charge
M&L for replacement of damaged nitrile insulation of 19 mm thick over pipes of CHS of any size as required at site complete all as specifed and directed by Engr-In-Charge
M&L for replacement of damaged aluminium cladding of any pipe size complete as required at site complete all as specifed and directed by Engr-In-Charge
S&F contactor A-26-30-10, 13 NO in repair AC 3 phase complete all as specifed and directed by Engr-In-Charge
S&F contactor MNX 9, in repair AC 3 phase complete all as specified and directed.
M&L for descaling of radiator panel associated with CHS installed at UGSC & FSH complete all as specifed and directed by Engr-In-Charge
Labour for servicing of fan coil unit of indoor units, removing dust / other remains with suitable liquid complete all as specifed and directed by Engr-In-Charge
S&F in replacement of wall mounted fan coil unit of capacity 1.5 TR (4500 K Cal/Hrs 600 Cfm) complete all as specifed and directed by Engr-In-Charge
S&F in replacement of wall mounted fan coil unit of capacity 1.0 TR (3000 K Cal/Hrs 600 Cfm) complete all as specifed and directed by Engr-In-Charge
Supply, installation, testing and commissioning of wall mounted type hecco panel of size 600mm x 300mm x 18mm or rating of 100W each, complete, all as specifed and directed by Engr-In-Charge
S&F in replacement PVC insulated stranded copper conductor size 2.5 Sqmm 2 core for connection anti freezing tracer complete all as specifed and directed by Engr-In-Charge
S&F in repair step up control system for 6 step including metre,control board and control wiring suitable for 63 KW electric boiler complete all as specifed and directed by Engr-In-Charge
S&F in repair step up control system for 6 step including metre,control board and control wiring suitable for 45 KW electric boiler complete all as specifed and directed by Engr-In-Charge
S&F in repair step up control system for 6 step including metre,control board and control wiring suitable for 75 KW electric boiler complete all as specifed and directed by Engr-In-Charge
Supply and fixing in repair Relay 8 pin (MY2N) 240 Volt AC, for central heating system complete all as specifed and directed by Engr-In-Charge
Supply and fixing in repair Relay 14 pin (MY4N) 240 Volt AC, for central heating system complete all as specifed and directed by Engr-In-Charge
Supply and fixing in repair Relay 8 pin (LY2N) 240 Volt AC, for central heating system complete all as specifed and directed by Engr-In-Charge
Supply and fixing in repair Control module card, for central heating system complete all as specifed and directed by Engr-In-Charge
Supply and fixing in repair step switch set, for central heating system complete all as specifed and directed by Engr-In-Charge
Supply and fixing in repair push button switch, for central heating system complete all as specifed and directed by Engr-In-Charge
M&L for welding of copper pipes using butane gas cylinders complete all as specified and directed by Engr-in-charge.
Supply and fixing in repair copper tubing dia as required at site suitable for hot and cool Air conditioning connection complete all as specifed and directed by Engr-in-charge
Supply and fixing Level switch for central heating system complete all as specifed and directed by Engr-In-Charge
Deduct Credit for Demolished/Dismantled material Rs (-) 99000.00 (Minus) as listed in Schedule 'A' Sec-II (Credit Schedule) Note : Tenderers will not quote against this item being a tentative amount, to be considered to arrive at the 'Contract Sum'.
M/S TRADE LINK
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .