| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.4 LAccepted-AOC J P AGARWALLA ROAD BHARALUMUKH GUWAHATI PIN 781009 | KAMRUP METRO | ASSAM | 781009 | ₹68.4 L Quoted ₹1.3 Cr | L1 | Accepted-AOC WORK ALLOTTED |
| 2 | L1₹68.4 LAccepted-AOC ASSAM AS | ₹68.4 L Quoted ₹1.3 Cr | L1 | Accepted-AOC WORK ALLOTTED |
| 3 | L1₹1.3 CrRejected-Finance BELGURI CITY TOWN KOKRAJHAR P O ATHIABARI P S SERFANGGURI DISTRICT KOKRAJHAR PIN 783346 | KOKRAJHAR | ASSAM | 783346 | ₹1.3 Cr | L1 | Rejected-Finance WORK NOT ALLOTTED |
| 4 | L1₹1.3 CrRejected-Finance | ₹1.3 Cr | L1 | Rejected-Finance WORK NOT ALLOTTED |
| 5 | Rejected-Technical | - | - | Rejected-Technical Documents not found proper |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
21 Feb 2023, 12:00 pmClosed
CHD, Irrigation, BTC
CHD, Irrigation, BTC, Kokrajhar
Babubil ELIS (Part-I) under PMKSY (HKKP) for the year 2021-22
2023_BoTC_29046_1
CHDI/ET/2022-23/8
Open Tender
Civil Works
Works
365 days
Kokrajhar West
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,900
₹2.9 L
Yes
16 Mar 2024
28 Jan 2023
21 Feb 2023
28 Jan 2023
21 Feb 2023
1 Feb 2023
Amount
Construction of Pump House
Earth work in excavation in foundation trenches in all types of soil removing the surplus water where necessary and refilling the site after completion of work including ramming, dressing, watering with local carriage etc. complete as directed.Foundation
R.C.C. work in proportion 1: 2: 4 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out water where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site. (Payment of reinforcement will be made separately)
Brick work in cement mortar 6mm thick with 1st class brick including racking out joint and curing etc. complete as directed . Prop 1:4 (A) up to plinth:-
125 mm thick 1st Class brick nogged wall in cement mortar including racking out joints and curing complete as directed. Prop 1:4
25 mm thick artificial stone damp proof coats as specified in Prop. 1:2:4 with stone aggregate 6mm to 20 mm size with CICO or other similar dam proofing compound. Complete as directed.
Sand/Earth filling in & plinth in layers not more than 15 cm thick , including carriage , watering ramming etc complete as directed & specified.
63 mm thick flooring with cement concrete in prop 1 : 3 : 6 with stone aggregate of size 13 mm to 38 mm free from dust , dirt and other foreign material over one flat brick soling including 12 mm thick cement plastering in prop. 1:3 and neat cement polishing on top watering curing etc. Complete as directed.
12mm thick cement plastering including clearing the surface and curing etc. Complete as directed. (Prop. 1:4).
Providing dressed 1st class Sal wood works in posts, walls, battens, post plates, trusses, chowkaths, brackets etc. including supplying and fixing spikes, nails, screws, bolts and nuts up to 16mm dia etc. complete as directed with kiricide oiling 2 coats etc complete as directed ( Sal wood )
Providing, fitting and fixing 1st class local doors and windows including supplying, fitting and fixing with hinges, hooks, rings, handle, tower bolts etc. complete as directed 38 mm thick full paneled
Providing, fitting and fixing 1st class local doors and windows including supplying, fitting and fixing with hinges, hooks, rings, handle, tower bolts etc. complete as directed Full Glassed Ventilator
Clearing and white washing including earth oiling in wood works in battens, post plates etc. complete as directed. Two coats
Clearing and white washing two coats complete as directed.
Supplying , fitting , fixing and laying In position M.S.Rod /T.S. Rod of all sizes in position as per design and drawing as required including cutting cranking and making hooks with necessary lappages and tying with wire (black) complete as directed including cost of all materials
Construction of Collecting Tank
Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary).All types of soil except soil mixed with gravel and boulders for normal lead of 30 m and lift of 1.50m
Cement concrete work in prop 1: 3:6 with aggregate of size 13mm to 38mm free from dust, dirt and other foreign material including rodding / vibrating bailing out of water where necessary and curing with supply of all materials complete as directed. (Temporary arrangement for obtaining clean water should be made at site). I) Without Shuttering
Cement concrete work in prop 1: 3:6 with aggregate of size 13mm to 38mm free from dust, dirt and other foreign material including rodding / vibrating bailing out of water where necessary and curing with supply of all materials complete as directed. (Temporary arrangement for obtaining clean water should be made at site). II) With Shuttering
12mm thick cement plastering including clearing the surface and curing etc. Complete as directed. (Prop. 1:3).
Supplying, fitting, fixing and laying in position M.S/ T.S. Rod of all sizes in position as per design and drawing as required including cutting cranking and making hooks with necessary lappages and tying with wire (black) complete as directed including cost of all materials i) 10 mm dia 25 c/c both way
R.C.C. work in prop 1:2:4 of aggregate of size 13mm to 38 mm free from dust dirt and other foreign materials with proper reinforcement as per design and drawing, including rodding / vibrating curing etc with bailing out water where necessary complete as directed. (Payment of reinforcement will be made separately) i)Without Shuttering
Construction of Wooden Kappier
Supplying and driving of sal wood piles 25 cm to30 cm dia dress to hard wood ( to support the pipe at suction,) including making length every 30 cm in interval & coaltaring two coats with best quality tar applied hot ,complete as directed. (Rate is inclusive of required quantity of the tar)
Providing undressed sal wood work in roof frame, struts purlin etc. including supplying & fixing necessary spikes, nails screws ,nuts and bolts of 16 mm dia etc complete with kiricide oiling 2 coats as directed
Bank Protection of at Intake Point
Earth work in all soils in canal embankment & bed filling as per designed section and grade by truck carriage from a minium distance of 4 K.M. including paying compensation of earth obtained from private land if any, loading, unloading & making stacks not more than 1 M height & then spreading the same in embankment in layers not exceeding 15 cm. thick including clearing light jungles removing trees upto 15 cm. dia. & uprooting roots & stumps etc. from the seat of embankment breaking clods to not more than 10 mm cubem ramming, dressing, roughening the seat of embankment, profilling etc. with all lift complete as directed (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity)
Collection & supply of one man size hard river buolder of size 23 cm. to 30 cm. including loading, unloading, stacking in measurable stacks at site not more than 1 m. height including paying forest royalty sales tax. etc. including local carriage to work site (Distance from quarry to work site = 50.00 km.)
Labour charge for pitching with one man size Boulder including dressing and ramming the seat to prpper size and slope pitching etc. with local carriage of Boulder from a distance of 50 M with lift up to 3 M complete as directed.
Construction of boulder sausage work of size 1.00 m x 1.00 m, including suppying of all materials with 23 cm to 30 cm size river boulder collected from a lead of 50.00 KM encaged in 15cmx15cm mesh in 8G/10G hexagonal wire netting of filling th voids between boulder tied with 10G/18G galvd tying wire at 30 cm apart laid in position as per direction including necessary local carriage of materials paying necessary forest royalty including providing 1.00 no. of whole Jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.50 m apart driven at least 0.60 m below ground and tying with sausage etc. all complete as directed.
Construction of Village Road Crossing Culvert
Earth work in excavation in foundation of canal structures in all type soil as per design and drawing including dressing the foundation shoring etc. removing the surplus spoils by head lead to safe distance from the working place and depositing the required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation, complete as directed at site.(Including bailing out stagnant rain water where necessary). All types of soil (except soils mixed with gravel & boulder) (For normal lead of 30 m & lift of 1.50 m.)
Cement concrete work in prop.1:3:6 with aggregate of size 13mm to 38mm free from dust, dirt & other foreign materials, including rodding/ vibrating bailing out of water where necessary & curing with supplying of materials complete as directed (Temporary arragement for obtaining clean water should be made at site) a) River shingles. i) Without Shuttering without dewatering
R.C.C. work in prop. 1:2:4 with aggreagte of size 13 mm to 38 mm free from dust, dirt and other foreign materials with proper reinforcement as design and drawing including rodding/vibrating, curing etc. with bailing out water necessary complete as directed. (Payment of reinforcement will be made separately)
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Centering and shuttering including proping etc. Where necessary and removal of forms after completion of C.C and R.C.C works complete as directed. (Measurement to be taken on the face area timbered). (a) Shuttering column, pier etc (fitting and dismantling)
12mm thick cement Plastering including clearing the surface &curing etc. Complete as directed.
Collection & supply of one man size 23 cm. to 30 cm. Hard river boulder including loading, unloading and stacking at mesurable stacks at site not more than 1 m height including paying forest royalty, sales tax etc. including local carriage to work site. (Distance from Quarry to work site = 25 K.m.)
Labour charge for pitching with one man size Boulder including dressing and ramming the seat to proper size and slope pitching etc. with local carriageof Boulders from a distance of 50 M with lift upto 3 M complete as directed.
Earth work in back filling og structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Earthwork in all soils in canal embankment & bed filling as per designed section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private, if any loading, unloading and stacking at not more than 1.00 M height and spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia & uprooting roots & stumps etc. from the seat of embankment, breaking clods to not more than 10 mm cube, ramming, dressing, roughening the seat of embankment, profiling etc. with all lead and lift complete as directed.
Collection and supply of gravel free from dust, dirt and other foreign materials, paying forest royalty, sales tax etc. at work site including stacking in measurable stacks complete as directed. (Considering average distance of 25 Km )
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
Construction of Cattle Crossing Culvert ( For 2 Nos)
Earth work in excavation in foundation of canal structures in all type soil as per design and drawing including dressing the foundation shoring etc. removing the surplus spoils by head lead to safe distance from the working place and depositing the required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation, complete as directed at site.(Including bailing out stagnant rain water where necessary). All types of soil (except soils mixed with gravel & boulder)
Cement concrete work in prop.1:3:6 with aggregate of size 13mm to 38mm free from dust, dirt & other foreign materials, including rodding/ vibrating bailing out of water where necessary & curing with supplying of materials complete as directed (Temporary arragement for obtaining clean water should be made at site) a) River shingles.
R.C.C. work in prop. 1:2:4 with aggreagte of size 6 mm to 20 mm free from dust, dirt and other foreign materials with proper reinforcement as design and drawing including rodding/vibrating, curing etc. with bailing out water necessary complete as directed. (Payment of reinforcement will be made separately)
Supplying fitting fixing including laying reinforcment bar in position in R.C.C work including cutting bending cracking with two piles 90mm ennealed wire hooking tying complete as directed.
Centering and shuttering including proping etc. Where necessary and removal of forms after completion of C.C and R.C.C works complete as directed. (Measurement to be taken on the face area timbered).
12mm thick cement Plastering including clearing the surface &curing etc. Complete as directed.
Collection & supply of one man size hard Boulder of size 23 cm. to 30 cm. including loading, unloading and stacking at mesurable stacks at site not more than 1 m height including paying forest royalty, sales tax etc. including local carriage to work site. (Distance from Quarry to work site = 25 K.m.)
Labour charge for pitching with one man size Boulder including dressing and ramming the seat to proper size and slope pitching etc. eith local carriageof Boulders from a distance of 50 M with lift upto 3 M complete as directed.
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Earthwork in all soils in canal embankment & bed filling as per designed section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private, if any loading, unloading and stacking at not more than 1.00 M height and spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia & uprooting roots & stumps etc. from the seat of embankment, breaking clods to not more than 10 mm cube, ramming, dressing, roughening the seat of embankment, profiling etc. with all lead and lift complete as directed.
Construction of H.P.Outlet (For 7 Nos)
Earth work in excavation in foundation of canal structures in all types of soil as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoil by head lead to a safe distance from the working place and depositing required spoil in uniform layer, dressing, watering, breaking clods to not more than 10mm cube with compaction as directed at site (Including bailing out stagnant water where necessary) A) All types of soil except soil mixed with gravel and boulder (For normal lead of 30 m and lift of 1.50 m) Without de-watering.
Supplying of R.C.C spun pipes of diameter 0.15 m with collar complete as directed.
Carriage of spun pipes with collars to the work site from departmental go-down in-cluding loading, unloading etc. complete as directed. Diameter = 0.15 m and distance to be carried= 55 KM
C.C work in prop. 1:3:6 with aggregate of size 13 mm to 38 mm free from dust, dirt & other foreign materials including rodding / vibrating, bailing out of water where necessary and curing with supplying of all materials complete as directed (Temporary arrangement for obtaining clean water should be made at site. (Machine mixed) i) River shingles without shuttering and without de-watering:-
C.C work in prop. 1:3:6 with aggregate of size 13 mm to 38 mm free from dust, dirt & other foreign materials including rodding / vibrating, bailing out of water where necessary and curing with supplying of all materials complete as directed (Temporary arrangement for obtaining clean water should be made at site. (Machine mixed) ii) River shingles with shuttering and without de-watering:-
Laying in position the R.C.C spun pipes with necessary collars including local carriage etc. complete as directed.
12 mm thick cement plastering including clearing the surface and curing etc. complte as directed. (Prop. 1:3)
Collection and supply of sand free from dust dirt & other foreign materials from approved quarry including screening,stacking and payment necessary forest royalty including carrying to the work site etc .complete as directed
Earth work in back filling of structure with earth obtaining from outside borrow pit filling with 15cm layer, ramming, dressing, watering and compaction including paying compensation of land, if any with lead up to 3.00 m and lift 1.50 m.
KAMAL MEDHI
Binay Basumatary
Sudhang Kumar Brahma
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .