Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹50.7 LAccepted-AOC | ₹50.7 L | 1 | Accepted-AOC L-1 quoted 6700041 however after negotiation agreed for 5074000 including GST. |
| 2 | 2₹80.2 L+₹29.5 L (58.1%)Rejected-Finance S 18 ADITYA CITY CENTRE VAIBHAV KHAND INDIRAPURAM GHAZIABAD UTTAR PRADESH 201012 | GHAZIABAD | UTTAR PRADESH | 201012 | ₹80.2 L+₹29.5 L (58.1%) | 2 | Rejected-Finance L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| Sl No | Description | Qty | Unit | LEPTON PROJECTS PRIVATE LIMITED L2 | ELITECH EARTH SCIENCE PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00Description | |||||
| 1.01 | The detailed scope of work for preparation of the ‘Detailed Project Report’ shall cover dismantling of the existing lignite handling system (including conveyors, hoppers, belts, MCC & control rooms, etc.), along with the design, engineering, and integration of electrical, mechanical, and civil systems, covering timelines and costing. The study shall also comprise methodology, transportation, and cost analysis for dismantling, relocation, and reinstallation of the entire lignite handling setup at the new designated locations. | 1 | Lumpsum | 68,00,000 ₹80,24,000 | 56,78,000 ₹67,00,040 Lowest |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
13 Apr 2026, 3:30 pmClosed
Associate Vice President (Operations)
Office No 2 and 3 7th Floor Man Upasana Plaza C 44 Sardar Patel Marg C Scheme Jaipur 302001
Tender for Preparation of Detailed Project Report DPR for Shifting and Relocation of Lignite Handling System of Kapurdi Lignite Mine of BLMCL District Barmer Rajasthan
2026_BLMCL_547308_1
BLMCL/MD/JPR/ 2025-26/094
Open Tender
Consultancy
Fixed-rate
90 days
Barmer
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Yes
Barmer Lignite Mining Company Limited
₹70,000
Yes
11 Aug 2026
20 Mar 2026
14 Apr 2026
20 Mar 2026
13 Apr 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description | |||||
| 1.01 | The detailed scope of work for preparation of the ‘Detailed Project Report’ shall cover dismantling of the existing lignite handling system (including conveyors, hoppers, belts, MCC & control rooms, etc.), along with the design, engineering, and integration of electrical, mechanical, and civil systems, covering timelines and costing. The study shall also comprise methodology, transportation, and cost analysis for dismantling, relocation, and reinstallation of the entire lignite handling setup at the new designated locations. | - | Lumpsum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TenderDocumentPreparationofDPR.pdf
Tender Documents • 0.30 MB
BOQ_975932.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .