Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | Rejected-Technical D NO 9 947 66 DOCTORS COLONY SHIVAJI PLEM VISAKHAPATNAM 530017 | VISAKHAPATANAM | ANDHRA PRADESH | 530017 | - | Rejected-Technical Not meeting the eligibility criteria |
Tender Value
₹9 L
EMD Value
₹18,000
Closing Date
27 Jan 2022, 6:00 pmClosed
CWE No 2 Visakhapatnam
Commander Works Engineer 2 ,Chief Engineer Navy Visakhapatnam Complex, Station Road, Visakhapatnam, 530004
REPAIRS MAINTENANCE TO VARIOUS CAPACITY OF CENTRAL TYPE AC PLANTS AND CONNECTED MOTORS PUMPS AND MISC WORKS AT INS KALINGA AND NAD BHEEMUNIPATNAM
2021_MES_497876_1
82552
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Bheemunipatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE Kalinga
₹18,000
Yes
25 Mar 2022
28 Dec 2021
29 Jan 2022
28 Dec 2021
27 Jan 2022
6 Jan 2022
28 Dec 2021 - 5 Jan 2022
Amount
Material & Labour for carrying out the descaling of the shell & Tube condensers by isolation of each condenser by providing of dummy plate for inlet & outlet connection and separation of condenser from water circulation without disturbing the operation of the AC plant, carrying out the descaling by circulation of the diluted scale removing agent organic compound type chemical of RA III / chemtex Brand at the appropriate ratio depend upon the scale deposit inside copper tube by forced circulation and opening the end covers, manually brushing the copper tubes with nylon brushes of various size to remove complete scale, de-greasing with caustic soda solution and flushing out with fresh water, refixing all disconnected pipes lines, end covers with new rubber gasket and opening water line valves and checking of water leakages, apply grease to all M.S. Bolts & Nuts and put the condensers of the following capacities in operational complete all as directed.
20/25 TR Capacity
30TR/35 TR Capacity
50 TR/60TR Capacity
80/90 TR Capacity
135 TR Capacity
180 TR Capacity
Material & Labour for carrying out the chemical servicing of the Air Handling units & cooling coils by applying the non-aciditic scale removing agent to the fins area of the cooling coil, copper tubes, remove the complete scale deposit across the coil, flushing through and complete blowing out the dirt, cleaning the fan impellers, filter section, fan section and complete cleaning of filters, tightening of all bolts & nuts, renew the rusted bolts & nuts checking the alignment of the drive set and testing & commissioning the Air Handling units of AC Plant complete all as directed by Eng-in-charge.
60 TR/ 80 TR Capacity
90/100TR Capacity
120TR Capacity
180 TR Capacity
240 TR Capacity
M&L for Dismantling electrical connections , taking down existing cooling tower motor from cooling tower of the following capacity and carrying out the repairs by filling metal on the worn out portion of shaft,machining to the standard size of hub,removing the bend, checking the balancing and S&F new cooling tower hub and fan including fixing,testind and commissioning of various capacity of AC plants,complete all as directed by Eng-in-charge.
70 TR capacity hub with 4 blades
100 TR capacity hub with 4 blades
150 TR capacity hub with 6 blades
200 TR capacity hub with 6 blades
240 TR capacity hub with 6 blades
270 TR capacity hub with 6 blades
Taking down the defective water sprinkler assembly consisting of water distribution pipe set of 4 Nos,sprinkler unit,balancing tie rod set,etc and S&F new sprinkler unit made out of die cast aluminium,1 No. water distribution pipe of HDPE 4 Nos including necessary dripping holes end dummy and 4 Nos tie rod with necessary clamps including testing and commissioning the sprinkler assembly for the following capacities of FRP cooling tower of induced draught type complete all as directed by Eng-in-charge.
60 TR capacity
100 TR capacity
200 TR capacity
Material & Labour for carrying out the chemical servicing of the Air cooled condensers & cooling coils by applying the non-aciditic scale removing agent to the fins area of the cooling coil, copper tubes, remove the complete scale deposit across the coil, flushing through and complete blowing out the dirt, cleaning the fan impellers, filter section, fan section, and complete cleaning filters, tightening of all bolts & nuts, renew the rusted bolts & nuts checking the alignment of the drive set and testing & commissioning the Air cooled condenser of AC Plant up to 120 TR complete all as directed.
M&L for disconnecting electical/ mechanical connections and de-coupling Motor from pump/compressor, taking down the defective Induction Motor of any make / model shifted to work shop for dismantling motor , remove burnt out winding from stator and rewinding the stator with same gauge super enamelled copper conductor with necessary insulation materials , varnishing backing re-assembling motor including replacement of both end bearings complete after complete the job motor shifted to site and reinstalled at its original position including allignment with pump/compressor with electrical connections and testing for best performance complete all as directed of the following capacities :-
Motor 7.5 HP TO 10 HP
Motor 12.5 HP to 15 HP
Material & Labour for taking down the defective worn out AHU shaft by dismantling the drive set, dismantling the AHU fan section, filter section, impellers etc and taking out the shaft, transporting to work shop and carrying out the repair by filling the metal on the worn out portion, both end, machining to the standard size of the bearing, removing the bend and checking the balancing fixing back to position, assembling dismantled sheet metal parts and testing commissioning the AHU of various capacity AC plants including necessary alignment of drive set complete all as directed.
Taking down unserviceable single phase preventer and S&F new single phase preventer,6 wires,230 V complete all as directed. Make :- L&T/Seimen/GE
Material and Labour for taking down the chocked liquid line drier core by pump down the gas to the condenser, isolation of valves taking out the defective 2 Nos core assembly complete cleaning the core shell with CTC, flushing with Nitrogen and renewal the 2 Nos activated Alumina core with necessary gasket fixing the cover , leak testing and commissioning complete all as directed.
M&L for vacummising the complete system of various capacity of central type AC plants with vaccum pump as per the standard practice and charging refrigerant R-22 gas including checking of leaks and testing & commissioning of the system complete all as directed. Make :- Mafron/Freon
M&L for vacummising the complete system of various capacity of central type AC plants with vaccum pump as per the standard practice and charging refrigerant HFC 134 a gas including checking of leaks and testing & commissioning of the system complete all as directed. Make :- Mafron/Freon
M&L for vacummising the complete system of various capacity of central type AC plants with vaccum pump as per the standard practice and charging refrigerant HFC R-407 a gas including checking of leaks and testing & commissioning of the system complete all as directed. Make :- Mafron/Freon
Supply and filling compressor oil SW-220 complete all as directed by Eng-in-charge.Make:As approved by GE.
Supply and filling compressor oil complete all as directed by Eng-in-charge.Make: Capila-D/Sheetal-80
Material & Labour for taking down the defective unserviceable solenoid valve coil and supply & fixing of new coil suitable to work in single phase, AC 220 V,50 Hz complete all as directed. Make :- Sporlaon / Sanlon
Material & Labour for taking down the defective/ unserviceable High Pressure & Low Pressure combination cut out switch and supply & fixing HP & LP combined switch including connecting the circuit wiring, pressure line connections and setting of the cut in & cut out pressure limits and testing complete all as directed. Make : Indfoss /Dunfoss
Material & Labour for taking down the defective/ unserviceable High Pressure cutout switch and supply & fixing of new high pressure cutout switch including connecting up the Electrical & pressure line connections and setting the cutin & Cutout pressure limits and testing the cutout switch for AC plant compressor complete all as directed. Make : Indfoss /Dunfoss
Material & Labour for taking down the defective unserviceable oil Pressure cutout switch and supply & fixing of new oil pressure cut out switch including connecting up the Electrical & Pressure line connection and setting the cutin & cutout pressure limits and testing the cutout switch for AC plant Compressor coplete all as directed. Make : Indfoss / Dunfoss
Material & Labour for taking down the defective unserviceable timer and S&F of new on delay timer HSDT2 CON-230, 0 to 30 Sec connecting the wiring & testing complete all as directed. Make :- Siemens/L&T/GE
Material & Labour for taking down the defective shaft seal assembly by disconnecting the drive set of direct / belt driven type, isolation & pumping down the gas to the condenser, opening the shaft seal, cleaning the shaft seal port, with CTC, and S&F new shaft seal and checking the leaks fixing the drive set, and testing the compressor of 05040 / 05046 Voltas 30TR all as directed by Engr-in-charge.Make :- Voltas
Material & Labour for taking down the defective unserviceable power contactor of 3TF46 & burned out copper wire, lugs, and S&F of new power contactor 3 pole, 220-240 coil volt, including the copper wire & copper lugs and testing complete all as directed. Make :- Siemens/L&T/GE
S&F MPD Power supplier of capacity 5-30 Amps auxilary supply,15 V,AC 230V,50Hz,AC supply as fixed in repairs complete all as directed. Make :- Soft hard/L&T
S&F Digital Ammeter,3 phase,5 Amps,class 1,AC supply as fixed in repairs complete all as directed. Make :- AE/IMP/L&T
S&F Digital Voltmeter,3 phase,5 Amps,class 1,AC supply as fixed in repairs complete all as directed. Make :- AE/IMP/L&T
Material & Labour for carrying out the complete leak rectification of the direct expansion system of following capacity central AC plants consisting of compressors, condensers, liquid & suction and discharge lines, and evaporator coil/ chiller and pressure control valves & lines and gauge board with Nitrogen gas, locating the leaks and rectifying the leaks and flushing the complete system and pressure testing & holding the pressure for 24 Hours complete all as directed by Eng-in-charge.
180 TR capacity Chiller system
135 TR capacity Chiller system
90 TR capacity Chiller system
80 TR capacity Chiller system
60 TR capacity Chiller system
50 TR capacity Chiller system
M&L for removing induction motor at site and replacing the ball bearing with new ball bearing of the following sizes complete all as directed. Make :-NBC/SKF
Ball bearing 6204
Ball bearing 6205
Ball bearing 6206
Ball bearing 6207
Ball bearing 6208
Ball bearing 6209
Ball bearing 6210
Ball bearing 6211
Ball bearing 6310
Ball bearing 6311
Ball bearing 6312
Ball bearing 6313
Taking down old unserviceable 100 mm dia CI butterfly valve and S&F 100 mm dia CI butterfly valve,PN 1.0,pneumatic double acting actuator with both sides flanges and gaskets complete all as specified and directed. Make :- Hudco/Advance/Leader
Taking down old unserviceable 80 mm dia CI butterfly valve and S&F 80 mm dia CI butterfly valve,PN 1.0,pneumatic double acting actuator with both sides flanges and gaskets complete all as specified and directed. Make :- Hudco/Advance/Leader
Removing unserviceable,corroded MS ERW pipe of 100 mm dia and S&F 150 mm dia MS Pipe (heavy grade) with necessary fittings like Elbow, flanges, bolts, nut and valve strainers, including supports complete as in water pipe lines including testing and commissioning complete all as directed. Make :- Jindal/Tata/Prakash
Notes: (i) Repairs work shall be carried out through authorised person of OEM and guarantee shall be produced from the OEM as authorised dealer of OEM. (ii) The tenderer dhall arrange inspection of OEM for all AC plants and submit the defects with estimate from OEM before completion of work. (iii) The contractor shall generally be liable for 24 hours call back services but strictly ensure availability of his responsible representative during the entire period of the contract for attending all types of complaints. He shall promptly be attend and the call back shall not be kept pending for more than 12 hours of intimation to contractor via e-mail/electronic media. The contractor shall obtain the signature of the Eng-in-charge in token of satisfactory completion of defects. (iv) In case of delay in the rectification of any defects is more than 24 hours for minor defects and more than 48 hours for major defects,the GE may at his absolute discretion to impose on the contractor to pay to the department a penalty of Rs 5,000/- for minor defects and Rs 10,000/- for major defects towards inconvenience caused to the users. The decision of the GE as to whether a particular defect occured is minor or major will be the final and binding. The above penalty shall be in addition to the provision made in condition 50 of IAFW-2249.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .