| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹5.3 L+₹838.48 (0.16%)Rejected-AOC | L2 | Rejected-AOC Second lowet bidder |
Tender Value
₹4.8 L
EMD Value
₹12,074
Closing Date
5 Feb 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Asst.Engineer
O/o the Asst.Engineer LSGD LIDAND EW Vadakkencherry G.P
Annual Plan-LID AND EW vadakkenchery GP 2023-chozhiyamkad drainage nirmanam Second stage So 265/24
2024_LSGD_650135_6
53/2023-24/AE/LSGD/VDY/PKD
Open Tender
Civil Works - Roads
Item Rate
Vadakkencherry g.p
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,065
Yes
₹12,074
Yes
17 Apr 2024
29 Jan 2024
7 Feb 2024
29 Jan 2024
5 Feb 2024
29 Jan 2024
Amount
side drainage and irish
3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
OD328897/2023-2024::Filling with quarry muck Filling up low lying and water logged areas with local materials/ quarry muck spreading in layers, levelling the top at site and consolidation by ramming etc complete for improving the CBR value of sub grade
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
R.Manojkumar
Bidder Name
R.Manojkumar
R.Rajamani
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_998998.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .