Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹9,997
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Dy.City Engineer
P/L Paver Block at diff.poles, Khadki and Choktha Kalupur area under Muni.Counsilor, M.P., M.L.A. and 70:20:10 Budget in Khadia Ward
347575
Central Zone E-Tender Notice No.07/2026-2027 Tender No.249
Open
Civil Works - Others
Works
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹9,997
23 Sept 2026
23 Sept 2026
23 Sept 2026
28 Sept 2026
23 Sept 2026
Name of work :- FtrzgtJtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht
mwaJJtbtk ytJlth ftbtu <ubs 70:20:10 le Mfeb nuX¤ltk ftbtu <&t yLg csux vife ftjwvwh
rJM<thbtk swœe swœe vtu¤tubtk, Fzfeytubtk, atufXtbtk yth.me.me. htuz <&t ELxhjturfkk k d vuJh
çjtuf fhJtlt ftb ctc<.
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Signature of Bidder Page 2 of
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate sealed tenders from
interested contractors for the following work at different locations within the limit of A.M.C.
1 Name of work FtrzgtJtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je
<uytu îtht mwaJJtbtk ytJlth ftbtu <ubs 70:20:10 le Mfeb nuX¤ltk ftbtu
<&t yLg csux vife ftjwvwh rJM<thbtk swœe swœe vtu¤tubtk, Fzfeytubtk, atufXtbtk
yth.me.me. htuz <&t ELxhjturfkk k d vuJh çjtuf fhJtlt ftb ctc<.
2 Estimated Tender Amount Rs. 999697.41 (excluding of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
3 Tender fee Rs.900.00
(Non refundable) (Demand Draft in favour of Municipal Commissioner, Ahmedabad)
4 Time Limit 12 Months
5 Download of Tender Tenders from the website www.nprocure.com or shall be down
Documents loaded mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “E-2” class having in Road Works in PWD in Govt. R&B /
CPWD / AMC or equivalent register with any other state Govt. or
7 Earnest Money Deposit Rs.9997.00 (Demand Draft / pay order / Bank Guarantee in favour of
(Bid security) Municipal Commissioner, Ahmedabad is to be submitted as prescribed
(1 % of Estimate put to as below. Demand Draft/Bank Guarantee shall be from approved list of
AMC of banks and the issuing branch of bank guarantee shall be of
Ahmedabad city only and it should be valid for for 180 days. ( As
Per AMC finance Dept . Circular No. 5 Dt. 5/5/2007 & F.D.
Circular No. 29 Dt. 7/8/2010 & attched ANNEXURE - 1 finance
dept.circular No-40 Dt.05/11/2020. E.M.D. shall be submitted
physically along with the Physical Submission when applicable.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with tender
Tender Fees documents as described in the invitation of tender should be
submitted to Assistant Manager- Central Zone, 3rd Floor, B – Wing,
Sardar Patel Bhavan, Danapith, Ahmedabad-380001.
Bid submitted without bid security & tender fee shall be treated as
non responsive and shall be summarily rejected.
9 Mode of sending the The whole tender shall be submitted by two modes.
Tender Documents • Whole tender shall be submitted only on www.nprocure.com
website as per Schedule mentioned in Notice inviting
• Tender Fee, EMD, technical bid and other relevant PQ Documents
as per check list given in tender shall be submitted physically in
two copies (Original & duplicate) in sealed envelope as per
Schedule mentioned in Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.
Tenders. The tenders received after latest schedule date and time will not
be entertained under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall fill
percentage rate on amount of BOQ online only until specified.
Price Bid shall be submitted physically duly signed & seal without
Signature of Bidder Page 3 of
mentioning quoted rated, else it shall be considered as rejected.
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft /
pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad. Bank Guarantee shall be from approved list of AMC of
banks as per attched ANNEXURE - 1 finance dept. latest circular.
and the issuing branch of bank guarantee shall be of Ahmedabad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LOI failing which interest @ 4% per annum will be
charged by AMC.
15 Deductions from Running
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Defect & Liability Period Not applicable in this case. If applicable than refer condition of
contract attached over rule as per form B-1 published by Government.
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
• All the circulars which were published by Authorities of AMC time by time will be applicable on said
Tender and bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights to reject
any or all the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case authorized
signatory holding Power of Attorney and Digital Signatory are not the same, the bid shall be considered
non-responsive.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 4 of
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Additional City Engineer
Ahmedabad Municipal Corporation,
Name of Work :- :- FtrzgtJtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht mwaJJtbtk
ytJlth ftbtu <ubs 70:20:10 le Mfeb nuX¤ltk ftbtu <&t yLg csux vife ftjwvwh rJM<thbtk swœe swœe
vtu¤tubtk, Fzfeytubtk, atufXtbtk yth.me.me. htuz <&t ELxhjturfkk k d vuJh çjtuf fhJtlt ftb ctc<.
I/We the undersigned have carefully gone through and clearly understood the Tender documents of above
mentioned project comprising of Notice Inviting tenders, Articles of Agreement, Scope of work, Definition of terms, notes
Instructions/Information to Bidder, Condition of Contract, special condition of contract, Appendices, Specifications, Bill of
Quantities, furnished by AHMEDABAD MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in accordance with
the specification, designs, drawing and instruction in writing referred to in the said document and with such materials as
mentioned for, at the respective rates which I/we have quoted in the Price Bid or at such other rates as may be fixed under
the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required, execute the
contract, according to your form 1 of agreement as or in default where of I/we bound myself/ourselves to forfeit the "Earnest
Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by AMC from the date of
receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for the sum as mentioned in
NIT, the full value of which is to be absolutely forfeited to the Employer If I/We fail to commence the work specified.
Otherwise the Employer shall retain the said sum, as on account of such Security Deposit as provided for in the aforesaid
I/We agree not to employ sub-contractors other than those that may be approved in accordance with conditions in
the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any tender, which are received. I
/ We also understand & agree that Municipal Commissioner Reserves the right to allot number of tenders to successful
bidders at his sole discretion in case if I / We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of opening of the
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned in the tender terms and
conditions. I am also bound to submit all supporting Genuine Original documents as and when asked and if any discrepancy
found in such documents as well as in the executed Work with respect to Quality/Quantity at any stage of work or even after
completion of work, it will be solely my Responsibility. I am bound to prove originality of all documents submitted by me and
if any Documents found false/fake then Municipal Commissioner/AMC has right to take any action/penalty/punishment
I am also bound that if I/we, indulged into any malpractice and/or used any inferior quality and/or the construction
of road is found to be of an inferior quality under this contract than in such case Municipal Commissioner/AMC has right to
debar/ blacklist permanently.
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi duties, Royalty on material
(i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to time on such items on which the same are leviable
and the rates quoted by me/us are inclusive of the same.
Yours faithfully
Date: Seal and Sign of Contractor
Signature of Bidder Page 5 of
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad Municipal Corporation
(referred to as Employer in these documents) invites sealed bids for the construction of works (as defined
in these documents and referred to as “the work”) detailed in the table given in the Invitation for Bid
(hereinafter called as IFB.) from competent bidder. The bidders may submit bids for the works detailed in
the table given in IFB.
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as defined in this tender.
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in the Clause-14. An agency
that has been engaged by the Employer to provide consulting services for the preparation or supervision
of the works, and any of its affiliates, shall not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or the firms those are
blacklisted/ debarred for specified period by AMC, Governement of Gujarat, Government of India or any
other entity controlled by it, would not be eligible to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:-
Register as per Notice Inviting Tender having in Road Works in PWD in Govt. R&B / CPWD / AMC or
equivalent register with any other state Govt. or institutions.
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are subject to be disqualified
• Made misleading or false representations in the forms, statements, affidavits and attachments
submitted in proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly completing the contract,
inordinate delays in completion, litigation history, or financial failures etc. or debarring from AMC work
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for the purpose of
restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer and other advisors in
any manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes his commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
• The envelope does not show on the outside the reference of bid and thus gets opened before the due
date of opening.
• The E.M.D. is not deposited in full and in the manner as specified in the clause of Earnest Money
Signature of Bidder Page 6 of
• The tender is in a language other than English or dose not contains its English Translation in case of
other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment/Black listing
Not withstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading
or false representations in the forms statements etc. for the period to be decided by the Employer.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his Bid. Employer will in
no case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and familiarize himself
with the site of Works and its surroundings including source of earth, water, road aggregates etc. and
obtain all information that may be necessary for preparing the Bid and entering into a contract for
construction of the Works. The costs of visiting the Site shall be at the Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes and thereby total
amount of work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision whatsoever.
• If the items stipulated in the tender shall not be executed as per site condition/ requirements. No claim
shall be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain idle and no claim shall
be entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and addendum (if any) issued.
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract, contract data, forms,
terms, technical specifications, forms, Annexes in the bid document. Failure to comply with the
requirements of bid documents shall be at the bidder’s own risk. Bids which are not substantially
responsive to the requirements of the bid documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding documents by issuing
Signature of Bidder Page 7 of
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed on website
www.tender.nprocure.com The prospective bidder shall refer to website to check any addendum before
24 hours of opening of bids. AMC will not give any advertisement for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum into account in preparing their
bids, the Employer may, at his desecration, extend as necessary the deadline for submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails to do so than also the
changes made through such addendum shall be applicable & bound to the bidder.
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following documents along with bid:
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with these Instructions
to Bidders (ITB)
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original” and other marked as
“Duplicate”, shall be submitted in a sealed envelope by 18:00 Hrs on the date of physical submission of bid
and addressed to the addressee given in the NIT duly super scribed “Name of Work, Bid due date and
time, Name and address of the bidder”
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on the percentage rate in
the Bill of Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or for any other cause
shall be included in the rates, prices and total Bid Price submitted by the Bidder, except otherwise stated
in the Bid document. Employer will not compensate the bidder (contractor) for any change in duties,
taxes and other levies payable by the contractor under the contract and any other reasons.
• The percentage rate and bid price quoted by the bidder shall be fixed up to the completion of Work and
shall not be subject to adjustment on any account, except where expressly specified, otherwise, in the
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be made in Indian Rupees.
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid valid for a shorter period
shall be rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the Employer may request that
the bidders may extend the period of validity for a specified additional period. The request and the
Signature of Bidder Page 8 of
bidders' responses shall be made in writing or by cable. A bidder may refuse the request without forfeiting
his bid security. A bidder agreeing to the request will not be required or permitted to modify his bid, but
will be required to extend the validity of his bid security for a period of the extension.
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB as part of his bid, in the
form of Demand Draft / pay order / Bank Guarantee in favour of Municipal Commissioner, Ahmedabad
valid for 120 days.
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad City only
Signature of Bidder Page 9 of
Signature of Bidder Page 10 of
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the Employer as non-
16.4 Any bid having bid security for lesser value and shorter validity period shall be treated as non-responsive.
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be returned as
promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest tenders, will be returned
when the successful bidder has furnished the required security deposit and signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has signed the Agreement
and furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit to
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch of the bank guarantee
shall be of Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp papers of requisite
value in accordance with the stamp Act applicable to that particular state of Indian Union, where
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall clearly indicate in (block
letters) his name, designation, Power of Attorney No. / Signing Power No. etc.
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly signed/initialed by the executing
officers and the last page shall be signed in full, indicating the particulars as aforesaid under the seal of the
Signature of Bidder Page 11 of
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate envelopes and the three
sealed envelopes shall be sealed in an outer envelope. The Bid envelopes shall be marked as follows:-
• Complete Tender Document with all necessary qualification related documents (in two copy)
Above two envelopes shall be kept in one envelope and it should be marked as “Technical Bid” and sealed.
This Outer envelope should mention the name of firm of bidder, his address, contact details & name of the
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager - Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c) Bear the following identification:
Indicate the name and address of the bidder.
• If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility
for the misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be received by the Employer at the
address specified in bid information not later than the date indicated on the face sheet of the document.
In the event of the specified date for the submission of bids declared a holiday for the Employer, the Bids
will be received up to the appointed time on the next working day. The Bidder is further required to
submit Documents in Physical Form on or before the Bid Due Date and before the time of submission as
specified in NIT, at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n) procure e-tendering
portal on account of delay in submission at bidder's end. Bidder shall ensure that they submit the bid well
before the "Due Date & Time of Bid- Submission". AMC shall not be responsible if bidder is not able to
submit the bid on account of failure in network/internet connection or any other technical reason.
18.3 The Employer may extend the deadline for submission of bids by issuing an amendment in accordance
with respective Clause, in which case all rights and obligations of the Employer and the bidders previously
subject to the original deadline will then be subject to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment / corrigendum if any.
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be rejected and returned
unopened to the bidder.
Any Bid received by the Employer after the deadline prescribed in NIT will be returned unopened to the
Signature of Bidder Page 12 of
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to expiration
of the Bid validity period by writing, facsimile or e-mail confirmed by registered letter. This letter
(hereinafter and in the Conditions of Contract called the “Letter of Acceptance” will state the sum that the
Employer will pay the Contractor in consideration of the execution, completion, and maintenance of the
Works by the Contractor as prescribed by the Contract (hereinafter and in the Contract called the
“Contract Price”).
The notification of award will constitute the formation of the Contract, subject only to the furnishing of a
Security Deposit in accordance with the provisions of Clause.
The agreement will incorporate all correspondences between the Employer and the Successful Bidder. It
will be signed by the Employer and the Successful Bidder.
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement within 28 days after the
successful bidder (hereinafter called the Contractor) receives the Letter of Acceptance, unless they agree
otherwise, subject to furnishing the security deposit before signing the Agreement with the Employer.
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will promptly notify the other
Bidders that their Bids have been unsuccessful and release their Earnest Money Deposit / Bid Security.
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall deliver to the Employer a
security deposit in the form of Bank Guarantee for an amount equivalent to 5% of the Contract Price valid
for the period of valid till 45 days beyond Date of completion of work. The Security Deposit shall be
payable in 10 days (for tenders upto Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LoA failing which interest @ 4% per annum will be charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the Employer, from
Ahmedabad branch of any Banks mentioned in the clause no. 16.2 of these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill including pre & post Audit.
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late submission of security deposit
or late renewal of bank guarantee for the number of days delayed for submission or discontinuity of the
bank guarantee.
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be same verbatim as per the
format. Bank Guarantee shall be submitted on right value of stamp paper and for correct value of contract.
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause 22.1 shall constitute
sufficient grounds for cancellation of the award and forfeiture of the Bid Security.
22.6 In case of any contract amendment during execution of the contract enhancing value of the contract the
Bank Guarantee value shall be enhanced accordingly. Validity of Bank Guarantee shall be commercial
terms and conditions of the tender.
22.7 All compensation or other sums of money payable by the Contractor to the Employer under the terms of
this Contract or any other contract or on any other account whatsoever may be deducted from Security
Deposit. Also in the event of the Contractor's Security Deposit being reduced by reasons of such
deductions, as aforesaid, the Contractor shall, within 14 days of receipt of notice of demand from the
Engineer-in-Charge, make good the deficit in Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of validities of Bank
Guarantees as may have been furnished by the Contractor from time to time, are required to be
extended/renewed, the Contractor shall get the validity periods of such guarantees extended/renewed,
and furnish these to the Engineer-in Charge one month before the expiry date of the aforesaid Guarantees
originally furnished failing which the existing Bank Guarantees shall be invoked by the Engineer – in –
Signature of Bidder Page 13 of
charge. Also in case of any deficit in securities on any account as might occur or is noticed, the Contractor
shall forthwith recoup/replace the same with acceptable Security Deposit.
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities as per contract are not
completed in all respects.
22.10 The Security Deposit less any amount due shall, on demand, be returned to the contractor after 45 days of
completion date / Final Bill paid date which ever is later. No interest on the amount of Security Deposit
shall be paid to the Contractor at the time of release of Security Deposit as stated above.
22.11 The successful bidder to whom ‘LoA’ has been issued shall enter into an agreement at Employer’s office
within 15 days of LoA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad shall be final and binding
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration resulting from
Contractors completed or under execution by him over last five years. If the details of Litigation History are
hidden by the Bidder and later on it comes to the knowledge of the Employer, the Bidder shall be
disqualified for the proposed work and other appropriate actions shall be taken against the bidder.
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Employer Value of the Reasons/Details for Remarks showing
Year Name of Project (Rs.) litigation/arbitration Present Status
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise the same shall be treat as
A consistent history of arbitration awards? Judgments against the applicants or any partner of a joint
venture may result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it comes to knowledge of the
employer the bidder shall be disqualified for the proposed work and other appropriate actions shall be
taken against the bidder.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 14 of
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended time limit, the Contractor shall
pay penalty of 10% of amount of actual remaining work. The amount of work for which the scope of
contractor is reduced shall not be considered for the calculation of Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no. 18 Date: 23/05/2017 and all
latest Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such retention money shall be
released in the final bill of the said work. AMC reserves right to deduct any amount to compensate the
poor performance of the contractor i.e. poor quality or abandoned / incomplete work.
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not subcontract any portion of Work
without the approval of the Employer’s Representative. Any subcontracting shall not relieve the
Contractor from any contractual obligations or responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for which the name of the
subcontractor and scope of works activities to be performed by him is already stated in the contract or
supply of material or engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as referred to in
the Bid document to carry out the functions stated in the Schedule or other personnel approved by the
Engineer. The Engineer will approve any proposed replacement of key personnel only if their
qualifications, abilities, and relevant experience are substantially equal to or better than those of the
personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning reasons thereof, for his
misconduct or inadequacy of technical skills and experience, who is a member of the Contractor’s staff or
his work force, the Contractor shall ensure that the person leaves the Site within seven days and has no
further connection with the work in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts shall not be erected on the
site of work and contractor shall make his own arrangements to provide such accommodations as per the
rules of the local bodies. He shall make his own arrangements for housing, stores, field office etc. He shall
submit a site layout plan indicating the location of various site facilities to be created by him at his cost for
the execution of work. The Owner shall in no way be responsible for any delay on this account and no
claim on this account whatsoever shall be entertained. All Basic amenities shall be provided by the
Contractor to Labours as per the prevailing labour Laws.
5.1 The Contractor shall have full regard throughout execution, completion and defects liability period to
following safety aspects and shall take all necessary steps to ensure that danger to safety is avoided all the
time in respect of,
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or indirectly engaged by him for
Signature of Bidder Page 15 of
• Safety of all the employees including persons working on other contracts of Employer at the same
site of the Employer and Engineers employees engaged at work site.
• Any authorized third party persons on the site.
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing, warning signs, barricading,
and cones; when and where necessary, or required by Engineer in Charge or by any duly constituted
authority for the protection of the works or for the safety and convenience of the public or other.
5.3 The Contractor shall take all reasonable steps to protect the environment on and off the site and avoid
damage or nuisance to persons or property of the public and others arising as a consequence of his
method of operation.
5.4 The Contractor shall maintain in good condition all work throughout execution, completion, and defects
liability period. The contractor shall be responsible for and to make good all injuries, damages and repairs,
rendered necessary by fire, rain, traffic, floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be provided by the contractor.
Nothing extra shall be payable on this account. It shall be provided strictly with double scaffolding system
with all the accessories etc. with adjustable suitable working platforms to access the areas, with ease for
working and inspection. It shall be designed to take all incidental loads. It should cater to the safety
features for workmen. It shall be ensured that no damage is caused to any structure due to scaffolding.
5.6 All temporary warning/ caution boards display shall be provided and displayed during day as well as night
time by the contractor, wherever required and as directed by the Engineer.
5.7 Arrangement of temporary water and electricity and telephone connection required, by him, shall be
made by the Contractor at his own cost and also necessary permissions directly from relevant Owners
shall be obtained by him under intimation to the Owner. Also all initial and running charges and security
deposit, if any in this regard shall be borne by him. The Contractor shall abide by all the rules/ bye laws
applicable in this regard and he shall be solely responsible for any penalty on account of violation of any of
the rules and byelaws in this regard.
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety precautions, the same shall be
completely contractor’s responsibility. All the losses due to such accidents and expenses of legal matters
shall be borne by contractor.
5.9 The Contractor shall be responsible for maintenance and watch and ward of the complete installation and
shall also be responsible for any pilferage, theft, damage, penalty etc. in this regard. The Contractor shall
indemnify the Owner against any claim arising out of pilferage / theft, damage, penalty etc. whatsoever on
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the work. Necessary protective
and safety equipments shall be provided to them by the Contractor at his own cost and used at site.
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All wreckage rubbish, excess
materials, temporary works no longer required will be removed from site immediately.
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus materials, rubbish,
temporary works of every kind.
A. COST CONTROL
8.0 Bill of Quantities
Signature of Bidder Page 16 of
a. The schedule-B shall contain Memorandum showing items for the construction, installation, testing,
and commissioning work to be done by the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The Contractor shall be paid only
quantities calculated after taking measurements of executed work. The rate stated in the schedule B
for each item of work shall apply. The works shall be measured by the Contractor jointly with the
authorized representative of the Engineer and all particulars required by the representative of the
Engineer shall be supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom, working space etc. is to be
9.1 The Engineer in Charge shall have power to make any variation of form, quality or quantity of the works or
any part thereof that may, in his opinion, be necessary and for that purpose, or if for any other reason it
shall, in his opinion, be appropriate, he shall have the authority to instruct the Contractor to do and the
Contractor shall do any of the following:
Increase or decrease the quantity of any work up to any extent included in the contract,
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the effects, if any, of all such
variations shall be valued in accordance with the following sub clauses. Provided that where the issue of
an instruction to vary the Works is necessitated by some default or breach of contract by contractor or for
which he is responsible, any additional cost attributable to such default shall be borne by the Contractor.
9.3 The Contractor shall not make any such variation without an instruction of the Engineer. No instruction is
required for quantities varying from those provided for the items in the contract schedule B.
10.0 Extra Items
10.1 The basis for the valuation of variations for addition to the Contract Price shall be as follows in the same
order of priority.
a) Variations in the quantities of work in schedule of quantities shall not vitiate the contract.
b) The contractor shall be bound to execute extra items of work as directed by the Engineer-in-charge.
c) Contract unit rates for individual items shall apply to varied quantities where there is a quantity
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried out by the Contractor and
he shall be paid at the rate fixed by Employer which shall be fixed as lowest of the rates derived by rate
analysis based on the following three methods. , the priority of the documents forming the Contract shall
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year 2013-14, the rate of
extra item shall be that rate and premium (above or below) quoted by contractor.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and equipment, the
cost of all temporary and incidental works, the overheads and the Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour costs, the cost of use
of all plant, machinery, and equipment, the cost of all temporary and incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors profit shall be taken at 10%
of the final rate derived.
Signature of Bidder Page 17 of
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and prices as are, in his opinion
appropriate and shall notify the Contractor accordingly with a copy to the Employer.
10.5 The Engineer shall determine provisional rates and prices to enable on account payments to be included in
the Interim Payment Certificates, until rates and prices are agreed as final by the Employer, the
Contractor, and the Engineer.
10.6 The Contractor shall not be entitled to additional payment for costs, which could have been avoided by
giving early warning.
11.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries in terms of
the contract and taxes at source, as applicable under the law. The Employer shall pay the Contractor the
amounts certified by the Engineer.
11.2 If an amount certified is increased in a later date certificate due to corrections in previous certificates or as
a result of an award from disputes review experts, Contractor shall be paid such amount only. The
Contractor shall not be paid any interest upon such delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be paid for by the Employer and
shall be deemed covered by other rates and prices in the Contract.
11.4 All payments shall be made in Ahmedabad.
12.0 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State and Local Governing
bodies prevailing on the date of award of the contract. The Contractor will have to pay all such taxes and
duties for the performance of this Contract. The Employer will deduct from the Contractor’s monthly and
other payments all taxes and duties, which he is bound to recover in accordance with the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the Central & State and local
Governing bodies, all orders, decrees of bodies, tribunals having any jurisdiction or authority which in any
manner affect those engaged or employed, and anything related to carrying out the work. All the bye-laws
lay down by AMC/AUDA and any other local bodies while executing the work shall be adhered to. All taxes
of local bodies shall be borne by the contractor. The Contractor shall arrange to give all notices required by
any authority and to pay to such authority all the fees that may have to be paid for the material, plants,
equipments etc. The Contractor shall also adhere to all traffic restrictions notified by the local authorities.
He shall protect and indemnify the Owner and its officials & employees against any claim or liability arising
out of violations of any such laws, ordinances, orders, decree, whether by himself or by his employees or
his authorized representatives. Nothing extra shall be payable on these accounts.
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No. CWA/2004-1831-M(3) dt.
9/12/05 issued by G.O.G. (non-refundable) shall be deducted from every bills which shall be deposited to
Govt. Labour Department for Labour welfare fund.
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
16.0 Cost of Repairs
Signature of Bidder Page 18 of
Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the
end of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the
loss or damage arises from the Contractor's acts or omissions.
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of the Works and the
Engineer will do so upon deciding that the Work is completed.
18.0 Termination
18.1 The Employer shall be entitled to terminate the contract if the contractor:
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to Bid after receipt by
him of a Notice to this effect from the Engineer/Employer after signing the agreement or
2. To proceed with the works, or any section thereof, within 28 days after received notice
3. Has failed to comply with a notice issued or an instruction issued within 28 days after having
4. Abandons the works or otherwise plainly demonstrates the intention not to continue performance
of his obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior written permission of
6. Has failed to furnish the required securities or extension thereof in terms of the contract.
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order
made against him, compounds with his creditors, or carries on business under receive, trustee or
manager for the benefit of his creditors, or if any act is done or event occurs which (under
applicable Laws) has a similar effect to any of these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days notice to the contractor,
terminate the contract and expel the contractor from the site. However, in the case of sub-paragraphs (h),
the Employer may be notice terminate the contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any other rights of the Employer,
under the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for any other entities to do so.
The Employer and these entities may then use any goods, contractor’s documents and other design
documents made by or on behalf of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other party causes a fundamental
breach of the Contract.
18.6 Fundamental breaches of Contract include, but shall not be limited to the following:
(a) the Contractor stops work for 14 days when no stoppage of work is shown on the current Program and
the stoppage has not been authorized by the Engineer;
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other than for a
reconstruction or amalgamation;
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a fundamental breach of
Contract and the Contractor fails to correct it within a reasonable period of time determined by the
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for which the maximum
amount of liquidated damages becomes payable as defined in the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent practices in
competing for or in the executing the Contract.
Signature of Bidder Page 19 of
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or soliciting
of anything of value to influence the action of a public official in the procurement process or in
contract execution. “Fraudulent practice” means a misrepresentation of facts in order to influence a
procurement process or the execution of a contract to the detriment of the Borrower, and includes
collusive practice among Bidders (prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the Borrower of the benefits of free and open
18.7 When either party to the Contract gives notice of a breach of contract to the Engineer for a cause other
than those listed above, the Engineer shall decide whether the breach is fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for convenience.
18.9 If the Contract is terminated the Contractor shall stop work immediately, make the Site safe and secure
and leave the Site as soon as reasonably possible and handover the site to the Employer including all
materials and plant and equipment existing there upon.
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the accuracy of the same. He
shall also be responsible for the correctness of the positions, levels, dimensions, and alignment of all parts
of the structures as per instructions given to him. If at any time any error shall appear during the progress
of any part of the work, the contractor shall at his own expense rectify such error if called upon to the
satisfaction of the Engineer in charge.
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation arises out of or under this
Contract against the contractor the same may be deducted by the Municipal Corporation from any sum
then due or which at any time thereafter may become due to the contractor under this contract and failing
that under any other contract with the Municipal Corporation or from any sum due to the contractor with
the Municipal Corporation (which may be available with Municipal Corporation), or from his retention
money, or he shall pay the claim on demand. The Municipal Corporation reserves the right to carry out post
payment audit and technical examination of the final bill including all supporting vouchers, abstracts, etc.
20.2 The Municipal Corporation further reserves the right to enforce recovery of any over payment when
detected notwithstanding the fact that the amount of the final bill may be included by the Contractor.
20.3 If as a result of such audit and technical examination any over payment is discovered in respect of any
work done by the Contractor or alleged to have been done by him under the contract, it shall be recovered
by the Municipal Corporation from the contractor by way of all the means prescribed above or if any
under payment is discovered by the Municipal Corporation, any amount due to the contractor under this
contract or under payment may be adjusted against any amount then due or which may at any time
thereafter become due before payment is made to the contractor from him to the Municipal Corporation
on any other contract account whatsoever.
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to dismantle any part for reasons other
than on account of bad or imperfect work, the materials obtained from dismantling will be the property of
the A.M.C. and will be disposed of as per instruction of Engineer-in-charge in the best interest of the A.M.C.
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the following matters, whether such
disputes arise during the progress of the work or after the completion or abandonment thereof, shall be
referred an independent Arbitrator appointed by AMC as far possible in consultation with the agency if it
is necessary and such disputes shall be settled in accordance with the arbitration and conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or upon the works of
the site thereof or belonging to the contractor or procured by him and intended to be used for
Signature of Bidder Page 20 of
execution of the work or any part thereof possession of which may have been taken by the
Engineer-in-charge under the said clause –5.
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the items of works not
accepted as completed fully in accordance with the sanctioned specifications.
(iii) The rate of part of payment for any class of work which is included in the additional or altered
work carried out by the contractor in accordance with the instructions of the Engineer-in-charge
under clause 14 and the rates for which is to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased by the contractor
before receipt of notice given by the Engineer-in-charge under clause 15 and/or amount of
compensation payable to the contractor under the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause 17 in the
event of this failure to rectify, remove or reconstruct the work within the period specified in the
written intimation or the amount of expenses incurred by the Engineer-in-charge under the said
clause17 in rectifying, removing or re-executing the work or in removing and replacing the
materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause 17 for the inferior
work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimates and assessed
(viii) The amount payable to the contractor for the work carried out under clause 33 in accordance with
the instructions and the requirement of the Engineer-in-charge in case where there are no
specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving reasons and calculations to
every item of claims. The decision will have to be implemented by all the concerned.
(x) In case of dispute leading to the contractor or Ahmedabad Municipal Corporation approaching on
Court of Law. It shall be within the jurisdiction where the site of work is situated.
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under clause 5 to take
possession of all or any tools, plants, materials and stores in or upon the works of site thereof belonging
to the contractor or procured by him and intended to be used for the execution of the work or any part
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the contractor in any work or
from removing such materials to other places, during the period the work is stopped or suspended in
pursuance, of notice given to the contractor under clause
iii) Progress of the work or the carrying out the additional or altered work in accordance with the provisions
of clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when asked by AMC. No separate
payment will be made to the contractor for this. . The contractor shall have to submit the same in hard
copy as well as soft copy as and when demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon, except those permitted under
clause 59.1, shall be taken, or permitted to be taken by the Contractor or by any of his employees or any
employees of his sub-Contractors without the prior approval of the Engineer in writing. No photographs/
videography shall be published or otherwise circulated without the approval of the Engineer in writing.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 21 of
ybœtJtœ BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe œhJt¤wk xuLzh ylu ftuLx[t¾x
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt ybœtJtœ BGþrl. ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt
ftuLx[t¾xhtu Che NfNu. dJobuLxlt btLg ftuLx[t¾xhu ybœtJtœ BGþrl. ftuvtuohuNlbtk btLg ftuLx[t¾xhtule
gtœebtk hSMxuNl fhtJJtlwk hnuNu.
c:- btLg ©uKelt ftuLx[t¾xh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb fhJt mûtb ntug
<ublu s ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb mk<tu»tfthf <ubs xtRb jebexbtk ÃþY fhJt
sYhe mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
z:- ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836, <t.25/11/2011 &e b¤uj bkswhe ylwmth <&t
mexe.Rsluh mh¾gwjh, lk. - 17, <t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk
ftuLx[t¾xh hSMxuNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve ylu btvœkztu ægtlbtk htFe <u bwsc ybj
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkath
ylu JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekd (fu su
ftb fhJt, ftb ÃþY fhJt <&t ftblt buRxulLm btxu cltJuj ntug) <ubs xuLzhhu yt mtRxlt ftb btxu,
rcÕzekd btxu, gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt
<&t ftblt buRxulLm btxule søgt)
(h) yt ftble mbg bgtoœt bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh<
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk
bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
Signature of Bidder Page 22 of
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VuhVth fhJtbtk ytJNu
lrn ylu ytJe ftuR AufAtf fu VuhVth ægtlu juJtNu lrn, <ultk jFtKbtk ftuR Cwj ntug <tu <ult vh l
Dwkx<t Ftuxt jFtK fu ytkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkfzt MvÐ Wfju <u he<u jFJt. «ðguf
mw^tht vh xwkfe mne fhJe.
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtk ytÔgw lrn ntug <tu xuLzh
ybtLg dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[t¾xhtult btdoœNol
btxu mtbtLg rlgbtu ylu mwaltytu vK ft¤SvwJof JtkaJt rJlk<e Au.
(1) ftuE vK fthK œNtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^< hnu Au.
(h) xuLzhhu ctuj vtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþhk< s ybtLg dKJtbtk ytJNu.
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt
rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t ntug.
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu cœÕGþ / cœÕgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk œhuf Ctdeœth y&Jt <u ykdulwk bwFðgthltbwk ^htJlth Ôgrf< mne
l fhu y&Jt xuLzhbtk <u btxu htFJtbtk ytJuje søgtbtk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
z:- xuLzh MJefthJw, hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe
hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu
J¤<hltu n¬ œtJtuu fhe NfNu lrn fu ftgœtfeg ftgoJtne yt ykdu &R NfNu lrn. xuLzh bkswh >ltu
y&o ftb ytve œuJtLþk Au <uJtu &R NfNu lrn.Nh<e xuLzh MJefthJtbtk ytJNu lne.
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble ftuRvK Cwjawf leault
rlgbtu ylwmth mhCh fhJtbtk ytJNu.
(1) xuLzh Chlthu œhuf Ftltbtk sKtJuj Nçœtu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk Nçœtuubtk sKtJuj
hfb btLg htFJtbtk ytJNu.
(2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtflt Ftltbtk&e hfbbtk
Cwj sKtg <tu yufb œh btLg htFJtbkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkt ytJNu.
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt ytJNu.
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk ytJNu lrn.
Signature of Bidder Page 23 of
(10) y:- ftbltu «tud{um mbgbgtoœt bwsc fhJtltu hnuNu. yt mbgbgotœt 10 jtF mw^elt ftb btxu
yuj.ytu.ytR. ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃg
<theF&e 15 rœJm&e NY &guj dKJtbt ytJNu. <&t <u œhBgtl ftble 3% juFu zevtuÍex Che
fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ
dKJtbtk ytJNu. ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
c:- mûtb m•tt îtht Yt.10,00,000.00 (œm jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ctœ (LoI)
ytvJtbtk ytJNu. ðgth ctœ rœl - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe
zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «J<obtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk
sKtJuj «btKu bkswh &guj mbgbgtoœt ctœlt FhuFh ctfe ftble hfblt bn•tb 10% juFu
(je¾Jezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe,
vtjF, ÃjtLx, œuFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykNu <btb Faoltu <&t
sYh sKtg <tu ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkfujt CtJ fu
œh fh<t J^thtle ftuR awfJKe ykdult <ublt ftuR œtJt ægtlbtk juJtNu lnek ylu xuLzh Chlth Ftuxe
hswyt<lu fthKu y&Jt ftuR Ôgrf<yu (vAe<u ctk^ftb rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje
btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnek. <ublw xuLzh ChJt <&t <ubtk swœt swœt
CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw
fhJtlu je^u y&Jt <ubtk&e WCt &<t ftuR stuFb fu sJtcœthebtk&e Axfe NfNu lnek. mœh ftbbtk ftuR
vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu. <&t
Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt rcl Nh<e
ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx +
yu¾x[t ytRxb) 2 % juFu hexuLNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc
ftuLx[tfxhlt cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw
ce:- xuLzhbtk œNtoJuj ftb mkck^e œM<tJusbtk œNtoJuj rJd<btk rJmkd<<tlt rfMmtbtk leau œNotJuj ¢btlwmth
œM<tJusbtk œNtoJuj rJd< d{tng htFJtbkt ytJNu.fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu
ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
(yu) yufb ylu fœ:-
Signature of Bidder Page 24 of
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
z[tu#dbtk fœ, ytfth, ytkfzt fœta Ftuxt ntug <tu btvujt fœ, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t ykdule ltuk^ bwfe
yuze.mexe yuLSlegh / zu. BGþrl. frbNlh©ele bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj
rlKog ykr<b dKJtbkt ytJNu.
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh
Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
(14) yt Wvhtk< y.Bgw.ftu. lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw
(16) atjw ftbu mrJom jtRllu lw¾mtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lw¾mtl &Nu
<tu <ule mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu
sl<tlt ftuR btKmlt òlbtj lu lw¾mtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vrhgtœ &tg
<tu <ule sJtc>the vK ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule sJtc>the vK vtujem Vrhgtœbt
ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e bswh Ftztbtk
W<thJt, Ntuhekd ylu Mxu[xekd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem
Vrhgtœbt sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn. ytxjwk
mbSlu s xuLzh ChJwk. œhuf ftb fh<t bswhtultu rJbtu vK W<thujtu ntuJtu stuRyu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu.
bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu <&t atjw ftb œhBgtl
yuLSlegh RLatso îtht ybœtJtœ Bgwrlmevj ftuvtuohuNlle buxjzuvtu jucbtk xuMxekd fhtJJt sKtJJtbtk
ytJu <tu ftuLx[t¾xh îtht <ulw vtjl fhJtlw hnuNu.
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb
ylwmth <u ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1 btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch yufx
<&t bswhtu <&t MxtVle Jebt vtujeme jElu <ult ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu
Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu. bu.BGþrl.frbNlh©elt mh¾âwjh
Bþsc sYhe ctknu^he vºtf ytvJtLþk hnuNu.
Signature of Bidder Page 25 of
(21) ftuRvK ftgœtfeg jexeduNl ybœJtœ Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs
dtuXJJtltu hnuNu.
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt
hnuNu.<&t xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe
J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle
ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
(26) atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[tfxhle hnuNu. subtk vevzt, œtuhzt Cgmwaf ctuzo,
ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkvwKo
sJtc>the ftuLx[tfxhle hnuNu.
(27) M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt
yfMbt<lt rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtc>the
ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk œhhtus fhuj ftbdehe <&t
yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe
ltku^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe
yuLSlegh©elu hnuNu.
(29) œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj
MvuNeVefuNl Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze.mexe.
yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxhekd fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk
lrn ytJu <tu ftuLx[tfxhlt Fauo ylu stuFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk
ytJNu ylu cejbtk&e hfb ftve juJtbtk ytJNu.
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e ftve juJtbtk ytJNu.
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh
îtht ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex J^the ytvJtbtk ytJNu.
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu ftuLx[t¾xhu VhSgt<
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu jd<tk ftb btk
ftuRvK mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs buLgwyj M¾{uJSkd ykdule
btdoœrNoft lwk vtjl fhJwk.
yufhthlwk Vtubo
Signature of Bidder Page 26 of
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au ylu ftblu
jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t >M<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu rmfft
Signature of Bidder Page 27 of
TECHNICAL SPECIFICATIONS:
Name of Work :- :- FtrzgtJtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht mwaJJtbtk
ytJlth ftbtu <ubs 70:20:10 le Mfeb nuX¤ltk ftbtu <&t yLg csux vife ftjwvwh rJM<thbtk swœe swœe
vtu¤tubtk, Fzfeytubtk, atufXtbtk yth.me.me. htuz <&t ELxhjturfkk k d vuJh çjtuf fhJtlt ftb ctc<.
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing
off the excavated stuff upto 50 Meter lead. (A) Loose or soft soil
0 to 1.5 meter depth.
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any such ordinary
excavating implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls under this category. For
materials and workmanship for earthwork and excavation, relevant specification IS: 3764 & IS 1200 (Part I) shall be
The depth of the excavation shall be as per the item description.
Clearing the Site:
The site where the Development has to be carried out shall be cleared and all obstructions, loose stones,
materials and rubbish of all kind, bush; wood and all type trees shall be removed, as directed.
The materials so obtained shall be the property of the Client and shall be conveyed and stacked as
directed, within 50-m. lead. The roots of the trees coming in the sides of the trenches shall be cut and
coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority / Municipal
Commissioner, before cutting shall be cut after obtaining such permission from them. It shall be the
Client's responsibility to obtain such permission from the respective authorities.
The rate of site clearance is deemed to be included in the rate of earthwork, for which no extra will be
After cleaning the site, the centerline of the central verge & other constructions will be given by the
Engineer-in-charge. The Contractor shall assume full responsibility for alignment, elevation and
dimension of each and all parts of the work. Contractor shall supply labours, materials, etc. required for
setting out the reference marks and bench marks made of MS angle iron and embedded in 1:2:4 CC.
They shall maintain the same as long as required and directed.
The excavation shall be carried out in true line and level and shall have the width and depth, as shown in
the drawings or as directed. The Contractor shall do the necessary shoring and strutting or shall provide
necessary slopes to a safe angle or steps, as required or directed, at his own cost. No extra payment shall
be made for such precautionary measures, taken. The bottom of the excavated area shall be leveled
both longitudinally and transversely, as directed, by removing excess soil and watering, as required. No
earth filling will be allowed for bringing it to level, if by mistake or any other reason, excavation is made
deeper or wider than shown on the drawings or as directed. The extra depth or width shall be made up
Signature of Bidder Page 28 of
with sand filling, as specified for the bottom level of the subsequent finishing at the cost of the
Contractor or as directed by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of supporting all utility
services, lighting the excavated areas, separating and stacking serviceable materials neatly,shoring,
timbering, strutting, bailing out water either sub-soil or rainwater, including pumping at any stage of the
work. Excavated areas shall be kept free of water while masonry or concrete or relevant base works are
in progress and till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in filling the excavated areas wherever required
inlayers, including ramming and watering, ensuring proper compaction etc. complete.
The Contractor shall remove the balance of the excavated quantity from the site of work, to a place, as
directed and for all lift.
The lead is the shortest practical route and not necessarily the route actually taken. The decision of
Engineer-In-charge shall be final in this regard.
Mode of Measurement and Payment:
The measurement of excavation of excavated area shall be made according to the sections shown on the
drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus
excavation made in excess of above requirements or due to stepping and sloping back as found
necessary, on account of conditions of soil and requirements of safety.
The rate shall include for clearing the site, surface dressing, making layout for road, fixing permanent
grid points with MS iron posts, embedded in C.C. 1:2:4, placed sufficiently away from the existing traffic
lines and establishing bench marks etc.
The rates shall include for necessary shoring, timbering and strutting for protection of sides of the
excavated area, pumping out rain or surface water at any stage of construction so as to keep the
excavated area dry, to the satisfaction of the /Engineer-in-charge.
The rate shall include leveling and ramming the bottoms of excavations to receive concrete, etc.
including trimming to slope wherever necessary etc. complete.
In filling clods bigger than 50 mm. shall not be allowed. Only consolidated measurements of filling shall
be paid. Consolidation to be done by mechanical compactor as per relevant item.
Extra Rate Over Item of Excavation of Earth for excavation of asphalt pavement / RCC of thickness up to
meter including demolishing the asphalt carpet, metal, soiling/cutting Reinforcement etc.comp. with stacking
the material as directed. (Based on Previously approved rate by C E sir)
(a) up to 0.20 meter thickness (By Manual)
(b) 0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C. Cutter machine including cost of operator,
fuel, & transportation etc complete.)
(c) 0.30 meter & above (By any type of Breaker Machine or R.C.C. Cutter machine including cost of
operator, fuel, & transportation etc complete.)
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet, metal,
soiling etc. complete with stacking the materials as directed. The road surface of asphalt shall carefully be opened
Signature of Bidder Page 29 of
to full width as directed by the Engineer in charge so as to remove all cracks or other damaged portions of road
either manually or with the soiling shall be first be stripped off for the whole width of trenches. All the Fmaterials
shall be separately deposited in such places as may be determined by the Engineer-in-charge. In case rubble not
being so deposited or being mixed up with the excavated materials will not be allowed for refilling. The cost of
materials shall be charged from the contractor. The decision of the C.E. shall be final and binding to the contractor.
Mode of measurement
Measurement shall be paid by Smt basis.
Dismantling the following including loading, unloading and disposal of unserviceable material
for all lead or as directed by Engineer-In-Charge and stacking the serviceable material and
backfilling the resulting trenches and pits complete.
a. Dismantling tiled or stone floors laid in mortar including stacking of serviceable
material and disposal of unserviceable material with all lead and lifts.
b. Demolition including stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift. (I) R.C.C work.
c. Demolition of brick work & stone masonry including stacking of serviceable
materials and disposal of unserviceable materials with all lead and lift. (II) In
The demolition shall consist of demolition of one or more parts of the structure as specified or shown in
the drawings. Demolition implies taking up or down or breaking up. This shall consist of demolishing
whole or part of work including all relevant item as specified or shown in the drawings.
The demolition shall always be planned before hand and shall be done in reverse order of the one in
which the structure was constructed. Contractor is fully responsible for proper and safe demolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work or
property, which is to be left intact, before dismantling and demolishing is taken up and the work shall be
carried out in such a way that no damages is caused to the adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary precautions
shall be taken to keep the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged
by dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled first. The
dismantled articles shall be properly stacked as directed.
All materials obtained from demolition shall be the property of Government unless otherwise d shall be
kept in safe custody until handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out and stacked
properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b stacked as
directed by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Signature of Bidder Page 30 of
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition dismantling and no
allowance for increase in bulk shall be allowed. The demolition of lime concrete shall be measured
under this item. Specification for deduction for voids, openings etc. shall be on same basis as that
employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following limits, unless
otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b) Area shall be
worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be worked out to the nearest
The rate shall include cost of all labour involved and tools used in demolishing and dismantling including
scaffolding. The rate shall also include the charges for separating out and stacking the serviceable
materials properly and disposing the unserviceable materials with all lead and lift. The rate also includes
for temporary storing for the safety of the portion not required to be pulled down or of adjoining
property and providing temporary enclosures or partitions where considered necessary.
The rate shall be for a unit of one cubic metre. For Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on
mortars shall be done Dismantling implies carefully taking up or down or these are fixed by nail screws
bolts etc. the shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate shall include
stacking the unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind Including spreading & levelling etc. complete.
(a) Lead Upto 1 Km.
(b) Lead From 1 Km to 2 Km.
(c) Lead From 2 Km to 3 Km
(d) Lead From 3 Km to 4 Km
(e) Lead From 4 Km to 5 Km
(f) Lead From 5 Km to 10 Km
(g) Lead From 10 Km to 15 Km
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly
ash,aggregates of any kind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a lead of
meters or as per instruction given by Engineer in charge. Useful materials obtained from clearing site and
excavation shall be stacked and used within the work site. Internal conveyance above 200 mt within the
work site i.e. From starting chainage to End chainage of a given road WILL NOT BE PAYABLE. Materials
suitable for construction of Embankment, earthen shoulder and subgrade shall be stacked at convenient
places within a work site for reuse. No extra payment will be paid to the contractor for stacking of earth
within the work site and reused for the construction of Embankment layer, sub grade and earthen
shoulder purpose. Only surplus earth shall be disposed off outside the work site as per instruction given
by Engineer-In-charge. Useful stones from rock excavation shall be stacked nearly within a lead of 50 M.
Signature of Bidder Page 31 of
and will be allowed to be used by the contractor on payment at rates laid down in the contract or if not so
aid down, at schedule of rates of the Division or at a mutually agreed rates if there are no such rates in the
Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance from a
particular stretch of given road will be paid in this item as per instruction of Engineer in charge. No
bulkage of disposed earth will be considered for the payment.
Providing and laying cement concrete 1:4:8 (1-Cement: 4- coarses and 8-hand broken stone
aggregates 40mm nominal size) and curing complete excluding cost of formwork in (A) Foundation
and Plinth (upto 10 ton). Building SOR 2023-24 Iteam Cod :05004A Iteam No. As Per NBO 5.3.3
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials and
watered and rammed as directed. The proportion of cement, sand and hand broken stone aggregates shall be one
part of cement, 4 parts of coarse sand, 8 parts of hand broken stone aggregates and shall so measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however be allowed for
smaller quantity of work if approved by the Engineer-incharge. When hand mixing is permitted by the Engineer-in
charge in case of breakdown of machinery’s and in the interest of the work. it shall be carried out on a water tight
platform and care shall be taken to ensure that mixing is continued until the mass is
uniform in colour and consistency. The quantity of water shall be sufficient to produce a dense concrete of
required workability for the purpose. The concrete shall be handled from the place of mixing to the final position
in not more than 15 minutes by the method as directed and shall be placed into its final position, compacted and
finished within 30 minutes of mixing with water i.e. before the setting commences. The concrete shall be laid in
layers of 15 cms. to 20 cms. The concrete shall be rammed with heavy iron rammers and rapidly to get the
required compaction and to allow all the gaps to be filled with mortar. After the final set, the concrete shall be
kept continuously wet, if required by pounding for a period of not less than 7 days from the date of placement The
concrete shall be measured for its length breadth and depth, limiting dimensions to those specified on plan or as
Mode of measurements shall be on CMT basis
Item No.06 Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere
work , using cement content as per approved Design Mix manufactured in fully automatic batching
plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous
agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete
work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of
centering shuttering finishing and reinforcement including cost of admixtures in recommended
proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without
impairing strength and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be maintained)
This Specification covers the general requirements for concrete using on-site production facilities including
requirements in regard to the quality, handling, storage of ingredients, proportioning, batching,
mixing,transporting, placing, curing, protecting, repairing, finishing and testing of concrete; form work;
Signature of Bidder Page 32 of
requirements in regard to the quality, storage, bending and fixing of reinforcement; grouting as well as mode of
measurement and payment for complete works.
It shall be very clearly understood that the specifications given herein are brief and do not cover minute details.
However, all work shall have to be carried out in accordance with the relevant standards and codes of practices or
in their absence in accordance with the best accepted current engineering practices or as directed by Engineer
from time to time. The decision of Engineer as regards the specification to be adopted and their interpretation and
the mode of execution of work shall be final and binding on Contractor and no claim whatsoever will be
entertainment on this account.
APPLICABLE CODES AND SPECIFICATIONS
The following specifications, standards and codes, including all official amendments/revisions and other
specifications and codes referred to therein, should be considered a part of this specification. In all cases the latest
issue/edition/revision shall apply. In case of discrepancy between this specification and those referred to herein
below or other specifications forming a part of this bid document, this specification shall govern.
CODE FOR MATERIALS:
1. IS: 4031 (Parts 1 to 15) Methods of physical tests for hydraulic cement
2. IS: 4032 Methods of chemical analysis of hydraulic cement
3. IS: 650 Specifications for standard sand for testing of cement
4. IS: 2430 Methods for sampling of aggregates for concrete
5. IS: 2386 (Part 1 to 8) Methods of test for aggregates for concrete
6. IS: 3025 Methods of sampling and test (physical and chemical) water
used in industry
7. IS: 6925 Methods of test for determination of water soluble chlorides in concrete admixtures
CODE FOR MATERIALS STORAGE
1. IS: 4082 Recommendations on stacking and storing of construction materials at site
CODE FOR CONCRETE MIX DESIGN
1. IS: 10262 Recommended guidelines for concrete mix design
2. SP: 23 (S&T) Handbook on Concrete Mixes.
CODE FOR CONCRETE TESTING:
1. IS:1199 Method of sampling and analysis of concrete
2. IS:516 Method of test for strength of concrete
3. IS:9013 Method of making, curing and determining compressive strength of accelerated cured concrete test
Signature of Bidder Page 33 of
4. IS:8142 Method of test for determining setting time of concrete by penetration resistance.
5. IS:9284 Method of test for abrasion resistance of concrete
6. IS:2770 Methods of testing bond in reinforced concrete
CODE FOR EQUIPMENT
1. IS:1791 Specification for batch type concrete mixers
2. IS:2438 Specification for roller pan mixer
3. IS:4925 Specification for concrete batching and mixing plant
4. IS:5892 Specification for concrete transit mixer and agitator
6. IS:2505 General requirements for concrete vibrators: Immersion type
7. IS:7251 Specification for concrete finishers
8. IS:2722 Specification for portable swing weigh batchers for
concrete (single and double bucket type).
9. IS:2750 Specification for steel scaffoldings
CODES OF PRACTICE (LATEST REVISION)
1. IS:456 Code of practice for plain and reinforced concrete
2. IS:457 Code of practice for general construction of plain and
reinforced concrete for dams and other massive structures
3. IS:3370 (Parts 1 to 4) Code of practice for concrete structures for storage of liquids.
4. IS:3935 Code of practice for composite construction
5. IS:2204 Code of practice for construction of reinforced concrete shell roof.
6. IS:2210 Criteria for the design of reinforced concrete shell structures and folded plates.
7. IS:2502 Code of practice for bending and fixing of bars for concrete reinforcement
8. IS:5525 Recommendation for detailing of reinforcement in reinforced concrete works
9. IS:2751 Code of practice for welding of mild steel plain and deformed bars used for reinforced concrete
10. IS:9417 Specification for welding cold worked bars for reinforced concrete construction
11. IS:3558 Code of practice for use of immersion vibrators for consolidating concrete
12. IS:3414 Code of practice for design and installation of joints in buildings
13. IS:4326 Code of practice for earthquake resistant design and construction of building
Signature of Bidder Page 34 of
14. IS:4014 (Part 1 and 2) Code of practice for steel tubular scaffolding
15. IS:2571 Code of practice for laying in-situ cement concrete flooring
16. IS:7861 Code of practice for extreme weather concreting
(Part-1) Recommended practice for hot weather concreting
(Part-2) Recommended practice for cold weather concreting.
CODE FOR CONSTRUCTION SAFETY
CODE FOR MEASUREMENT
1. IS:1200 (Part 1 to 28)
Method of measurement of building and engineering works
2. IS:3385 Code of practice for measurement of Civil Engineering works
1. IS:3696(Part 1 and III) Safety code for scaffolds and ladders
2. IS:7969 Safety code for handling and storage of building materials
3. IS:8989 Safety code for erection of concrete framed structures
Engineer shall have the right at all times to inspect all operations including the sources of materials, procurements,
layout and storage of materials, the concrete batching and mixing equipment, and the quality control system. Such
an inspection shall be arranged and Engineer’s approval obtained, prior to starting of
concrete work. This shall, however, not relieve Contractor of any of his responsibilities. All materials does not
conform to this specification shall be rejected. Materials should be selected so that they can satisfy the design
requirements of strength, serviceability, safety, durability and finish with due regards to the functional
requirements and the environmental conditions to which the structure will be subjected. Materials complying with
codes/standards shall generally be used; other materials may be used after approval of the Engineer and after
establishing their performance suitability based on previous data, experience or tests.
Unless otherwise specified or called for by the Engineer, cement shall be Ordinary Portland Cement to IS:
(latest edition) for entire work. Where Portland pozzolana or slag cement are used, it shall be ensured that
consistency of quality is maintained, there will be no adverse interactions between the materials and the finish
specified is not marred. Only one type of cement shall be used in any one mix. The source of supply, type or brand
of cement within the same structure or portion thereof shall not be changed without approval from Engineer.
Cement which is not used within 90 days from its date of manufacture shall be tested at a laboratory approved by
Engineer and until the results of such tests are found satisfactory, it shall not be used in any work.
Signature of Bidder Page 35 of
“Aggregate” in general designates both find and coarse inert materials used in the manufacture of concrete (vide
BIS 456 and BIS 383) and conforming to tests as per BIS 2386 (Part 1 to VI). “Coarse Aggregate” is aggregate most
of which is retained when passed through on 4.75 mm BIS sieve.All fine and coarse aggregates prFoposed for use
in the works shall be subject to the Engineer-in-charge’s approval and after specific materials have been accepted,
the source of supply of such materials shall not be changed without prior approval of the Engineer-in-charge.
Aggregates shall consist of natural sand, stone (crushed or uncrushed) and gravel from a source known to produce
satisfactory aggregate for concrete and shall be chemically inert, non-flaky, strong, hard, durable against
weathering, or limited porosity and free from deleterious materials that may cause corrosion of the reinforcement
or may impair the strength and or durability of concrete. The grading of aggregates shall be such as to produce a
dense concrete of specified strength and consistency that will work readily into position without segregation and
shall be based on the “mix design” and preliminary tests on concrete specified later.
SAMPLING AND TESTING
Samples of the aggregates for mixed design and determination of suitability shall be taken under the supervision
of the Engineer-in-charge and delivered to the laboratory, well in advance of the scheduled placing of concrete,
Records of tests, which have been made on proposed aggregates and on concrete made from this source of
aggregates shall be furnished to Engineer-in-charge in advance of the work, for use in determining aggregate
suitability. The costs of all such tests, sampling etc. shall be borne by the contractor.
STORAGE OF AGGREGATE
All coarse and fine aggregates shall be stacked separately in stock piles in the material yard near the work site in
bins properly constructed to avoid inter mixing of different aggregates. Contamination with foreign material and
earth during storage and while heaping the materials shall be avoided. The aggregates must be
of specified quality not only at the time of receiving at site but more so at the time of loading into mixer. Rakers
shall be piled in layers not exceeding 1.20 m in height to prevent coning or segregation. Each layer shall cover the
entire area of stock pile before succeeding layers are started. Aggregates that have become segregated shall be
SPECIFIC GRAVITY
Aggregates having a specific gravity below 2.4 (saturated surface dry basis) shall not be used:
Fine aggregate shall consist of natural or crushed sand conforming to IS 383 conforming to tests as per 2386 1 to
IV. The sand shall be clean, sharp, hard, strong and durable and shall be free from dust, vegetables substances,
adherent coating, clay, alkali, organic, matter mica, salt or other deleterious substances, which can be injurious to
the setting qualities/strength/durability of concrete.
SCREENING AND WASHING:
Sand shall be prepared for use by such screening or washing, or both, as necessary, to remove all objectionable
foreign matter while separating the sand grains to the required size fraction.
FOREIGN MATERIAL LIMITATIONS:
Signature of Bidder Page 36 of
The percentage deleterious substances in sand delivered to the mixer shall not exceed the following:
Unless otherwise directed or approved by the Engineer-in-charge, the grading of sand shall be within the limits
indicated hereunder:
Where the grading falls outside the limits of any particular grading zone of sieves, other than 600 microns IS sieve,
by total amount not exceeding 5%, it shall be regarded as falling within that grading zone. This tolerance shall not
by total amount not exceeding 5%, it shall be regarded as falling within that grading zone. This tolerance shall not
be applied to percentage passing the 600 micron IS sieve or to percentage passing any other sieve on the coarser
limit of grading zone 1 or the finer limit of grading zone IV. Fine aggregates conforming to grading zone IV shall not
be used. Mix designs and preliminary tests shall show its suitability for producing concrete of specified strength
and workability.
FINENESS MODULUS
The sand shall have a fineness modulus of not less than 2.2 or more than 4.2. The fineness modulus is determined
by adding the cumulative percentages retained on the following IS sieve sizes (4.75 mm, 2.35 mm, 1.18 mm,
microns and 150 microns) and dividing the sum by
COARSE AGGREGATE
Coarse aggregate for concrete, except as noted above, shall conform to IS 383 and IS 2386. This shall consist of
crushed stone and shall be clean and free from elongated, flaky or laminated pieces, adhering coatings, clay lumps,
coal residue, clinkers, slag, alkali, mica, organic matter or other deleterious matter.
Sr.No. Foreign Material Percentage by weight Uncrushed Crushed
1. Material finer than 75 micron IS sieve 3.0
2. Shale 1.0 --
3 Coal and Lignite 1.0
4 Clay Lumps 1.0
IS: Sieve Designation
Signature of Bidder Page 37 of
SCREENING AND WASHING:
Crushed rock shall be screened and or washed for the removal of dirt or dust coating, if so requested by the
Engineer In charge.
Coarse aggregate shall be either in single size or graded, in both cases the grading shall be within the
following units:
Percentage passing for single sized
aggregate of normal size
Percentage passing for graded
aggregate of normal size.
Signature of Bidder Page 38 of
The pieces shall be angular in shape and shall have granular or crystalline surfaces. Friable, flaky and laminated
pieces, mica and shale, if present, shall be only within tolerance limits which will not affect adversely the strength
and or durability or concrete. The maximum size of coarse aggregate shall be 40 mm for M 7.5 and M 10 and
20mm for M15 to M20 concrete, or as directed by the Engineer-in-Charge or specified otherwise. The maximum
size of coarse aggregate shall be the maximum size specified above but in no case greater than 1/4th of the
minimum thickness of the number, provided that the concrete can be placed without difficulty so as to surround
all reinforcement thoroughly and fill the corners of the form. For plain concrete the maximum size of aggregate
shall be of 40 mm. For heavily reinforced concrete members, the nominal maximum size of the aggregate shall be
5 mm less than the minimum clear distance between the reinforcing main bars or 5 mm less than the minimum
cover reinforcement whichever is smaller.
FOREIGN MATERIAL LIMITATIONS
The percentage of deleterious materials in the aggregate delivered to the mixer shall not exceed thefollowing:
Water used for both mixing and curing shall conform to IS: 456. Potable water is generally satisfactory. Water
containing any excess of acid, alkali, sugar or salt shall not be used.
Reinforcement bars shall conform to IS: 432 IS: 226 or IS: 1786 and the welded wire fabric to IS: 1566 as shown or
specified on the drawings.
All reinforcement shall be clean, free from pitting, oil, grease, paint, loose mill scales, rust, dirty dust or any other
substance that will destroy or reduce bond.
Signature of Bidder Page 39 of
Sr. No. Foreign Material
Percentage by weight
Uncrushed Crushed
1. Material finer than 75 micron IS sieve 3.0
2. Coal and Lignite 1.0
3. Clay lumps 1.0
4. Soft fragments 3 .0 --
If permitted by Engineer, welding of reinforcement shall be done in accordance with IS: 2751 or IS: 9417 as
Accelerating, regarding, water reducing and air entraining admixtures shall conform to IS: 9013 and integral water
proofing admixtures to IS:
Admixtures may be used in concrete as per manufacturer’s instructions only with the approval of Engineer based
upon evidence that with the passage of time neither the compressive strength nor its durability is reduced. An
admixture’s suitability and effectiveness shall be verified by trial mixes with the other material used in the work. If
two or more admixtures are to be used simultaneously in the same concrete mix, their interaction shall be
checked and trial mixes done to ensure their compatibility. There should also be no increase in risk of corrosion of
the reinforcement or other embedment.Calcium chloride shall not be used for accelerating set of the cement for
any concrete containing reinforcement or embedded steel parts. When calcium chloride is permitted such as in
mass concrete works, it shall be dissolved in water and added to the mixing water by an amount not exceeding
percent of the weight of the cement in each batch of concrete. The designed concrete mix shall be corrected
No wastage allowance for cement and steel shall be considered and paid for.
SAMPLES AND TESTS
All materials used for the works shall be tested before use. Manufacturer’s test certificate shall also be got tested
by the Contractor in a laboratory approved by Engineer at no extra cost to Client. However, where material is
supplied by client, all testing charges shall be borne by client, but transportation of material samples to the
laboratory shall have to be done by contractor at no extra cost.
Sampling and testing shall be as per IS: 2386 under the supervision of Engineer, The cost of all tests,sampling etc.
shall be borne by Contractor. Water to be used shall be tested to comply with requirement of IS: 456 Contractor
shall furnish manufacturer’s test certificates and technical literatures for the admixture proposed to be used. If
directed the admixture shall be got tested and approved laboratory at no extra cost.
STORING OF MATERIAL
Signature of Bidder Page 40 of
All material shall be stored in a manner so as to prevent its deterioration and contamination which would prelude
its use in the works. Requirements of IS: 40-82 shall be complied with.Contractor will have to make his own
arrangements for the storage of adequate quantity of cement even if cement is supplied by client. Cost of such
rejected cement, where cement is supplied by client, shall be recovered at issue rate or open market rate which
ever is higher. Cement bags shall be stored in dry weatherproof shed with a raised floor, well away from the outer
walls and insulated from the floor to avoid moisture from ground. Not more than 15 bags shall be stacked in any
tier. Storage arrangement shall be approved by Engineer. Storage under Tarpaulins shall not be permitted. Each
consignment of cement shall be stored separately and consumed in its order or receipt.Each size of coarse and fine
aggregates shall be stacked separately and shall be protected from leaves and contamination with foreign
material. The stacks shall be on hard, clean, free draining bases, draining away from the concrete mixing area.
Contractor shall make his own arrangements for storing water at site in tanks to prevent contamination.
The reinforcement shall be stacked on top of timber sleepers to avoid contract with ground/water. Each type
and size shall be stacked separately.
Concrete grade shall be as designated on drawings. In concrete grade M15, M20, M25 etc. the number represents
the specified characteristic compressive strength of 150 mm cube at 28 days, expressed in N/sq.mm as per IS:456.
Concrete in the works shall be “Design Mix Concrete” or Normal Mix Concrete” Allconcrete works of grade M5,
M7.5 and M10 shall be nominal whereas all other grades, M15 and above,
shall be Design Mix Concrete.
DESIGN MIX CONCRETE
MIX DESIGN AND TESTING
For Design Mix Concrete, the mix shall be designed according to IS:10262 and SP:23 to provide the grade of
concrete having the required workability and characteristics strength not less than appropriate values given in
IS:456. The design mix shall in addition be such that it is cohesive and does not segregate and
should result in dense and durable concrete and also capable of giving the finish as specified. Fort water retaining
structures the mix shall also result in water with concrete. The contractor shall exercise great care while designing
the concrete mix and executing the works to achieve the desired result.
Unless otherwise specifically mentioned, the minimum cement content for design mix concrete shall be as given
Grade of Concrete Minimum cement content
In Kg/Cu.m of concrete
Signature of Bidder Page 41 of
The minimum cement content stipulated above shall be adopted irrespective of whether the contractor achieves
the desired strength with less quantity of cement. The contractor’s quoted rates for concrete shall provide for the
above eventually and nothing extra shall become payable to the contractor in this account.Even in the case where
the quantity of cement required is higher than that specified above to achieve desired strength based on an
approved mix design, nothing extra shall become payable to the contractor. It shall be contractor’s sole
responsibility to carry out the mix designs at his own cost. He shall furnish to Engineer atleast 30 days before
concreting operations, a statement of proportions proposed to be used for various concrete mixes and the
strength results obtained. The strength requirements of the concrete mixes ascertained on 150 mm cubes as per
IS: 516 shall comply with the requirements of IS:
Grade of Concrete Minimum Compressive Strength (N/Sq.mm at 7 days)
Specified compressive strength (N/Sq.mm at 28 days)
A range of slumps, which shall generally be used for various types of construction unless otherwise instructed by
the Engineer, is given below:-
Structure/member Slump in millimeters
Maximum Minimum
Reinforced foundation walls and footings 75
Plain footings, caissons and substructure walls 75
T.G. and massive compressor foundations 50
Slabs, beams and reinforced walls 100
Pumps and miscellaneous equipment foundations 75
Building columns 100
Heavy mass construction 50
BATCHING AND MIXING OF CONCRETE
Proportions of aggregates and cement, as decided by the concrete mix design, shall be by weight. These
proportions shall be maintained during subsequent concrete batching by means of weigh batchers capable of
controlling the weights within one percent of the desired value. Amount of water added shall be such as to
produce dense concrete of required consistency, specified strength and satisfactory workability and shall be so
Signature of Bidder Page 42 of
adjusted to account for moisture content in the aggregates. Water cement ratio specified shall be maintained.
Each time the work stops, the mixer shall be cleaned out, and while recommending the first batch shall have 10%
additional cement to allow for sticking in the drum, Arrangement should be made by contractor to have the cubes
tested in an approved laboratory or in field at his own expense, with prior consent of Engine4re. Sampling and
testing of strength and workability of concrete shall be as per IS: 1199, IS: 516 and IS:
NOMINAL MIX CONCRETE
Mix design and preliminary tests are not necessary for Nominal mix concrete. However works tests shall be carried
out as per IS: 456. Proportions for Nominal Mix Concrete and water/cement ratio may be adopted as per Table
of IS: 456. However it will be contractor’s sole responsibility to adopt appropriate nominal mix proportions to yield
the specified strength.
BATCHING AND MIXING CONCRETE
Based on the adopted nominal mixes, aggregates and cement shall be measured by weight.
PREPARATION PRIOR TO CONCRETE PLACEMENT
Before concrete is actually placed in position, the inside of the form work shall be cleaned and mould oil applied,
inserts and reinforcement shall be correctly positioned and securely held, necessary openings pockets etc.
All arrangements formwork, equipment and proposed procedure, shall be approved by Engineer. The Contractor
shall maintain separate Pour Card for each pour as per the format enclosed and shall produce before
commencement of concreting to Engineer-in-charge.
TRANSPORTING, PLACING AND COMPACTING CONCRETE
Concrete shall be transported from the mixing plant to the formwork with minimum time lapse by methods that
shall maintain the required workability and will prevent segregation, loss of any ingredients or ingress of foreign
matter or water.
In all cases concrete shall be deposited as early as practicable directly in its final position. To avoid segregation
concrete shall not be re-handled or caused to flow. For locations where direct placement is not possible and in
narrow forms. The Contractor shall provide suitable drops and “Elephant Trunks” Concrete shall not be dropped
from a height of more than 1.0 mm as stipulated in clause D.6.8.13.
Concrete shall not be placed in flowing water. Under water, concrete shall be placed in position by tremies or by
pipeline from the mixer and shall never be allowed to fall freely through the water. While placing concrete the
Contractor shall proposed as specified below and also ensure the following:
a) Continuously between construction joints and predetermined abutments.
b) Without disturbance to forms or reinforcement.
c) Without disturbance to pipes, ducts, fixings and the like to be cast in; ensure that such items are securely fixed.
Ensure that concrete cannot enter open ends of pipes and conduits etc.
d) Without dropping in a manner that could cause segregation or shock.
Signature of Bidder Page 43 of
e) In deep pours only when the concrete and framework designed for this purpose and by using suitable chutes or
f) Do not place if the workability is such that full compaction cannot be achieved.
g) Without disturbing the unsupported sides of excavations; prevent contamination of concrete with earth.
Provide sheeting if necessary. In supported excavations, withdraw the lining progressively as concrete is placed.
h) If placed directly on to hardcore or any other porous material, dampen the surface to reduce loss of water from
i) Ensure that there is no damage or displacement to sheet membranes.
j) Record the time and location of placing structural concrete. Concrete shall normally be compacted in its final
position within thirty minutes of leaving the mixer. Concrete shall be compacted during placing with approved
vibrating equipment without causing segregation until it forms a solid mass free from voids thoroughly worked
around reinforcement and embedded fixtures and into all corners of the formwork. Immersion vibrators shall be
inserted vertically at points not more than 450 mm apart and withdrawn slowly till air bubbles cease to come to
surface, leaving no voids. When placing concrete in layers advancing horizontally, care shall be taken to ensure
adequate vibration, blending and melding of concrete between successive layers. Vibrators shall not be allowed to
come in contract with reinforcement, formwork and finished surfaces after start of initial set. Over vibration shall
be avoided.Concrete may be conveyed and placed by mechanically operated equipment after getting the
complete procedure approved by Engineer. The slump shall be held to the minimum necessary for conveying
concrete by this method. When concrete is to be pumped concrete mix shall be specifically designed to suit
pumping. Care shall be taken to avoid stoppages in work once pumping has started.Except when placing with slip
forms, each placement of concrete in multiple lift work, shall be allowed to set for at least 24 hours after the final
set of concrete before the start of subsequent placement. Placing shall stop when concrete reaches the top of the
opening in walls or bottom surface of slab, in slab and beam construction, and it shall be resumed before concrete
takes initial set but not until it has had time to settle as determined by Engineer. Concrete shall be protected
against damage until final acceptance.
Curing and protection shall start immediately after the compaction of concrete to protect it from:
(a) Premature drying out, particularly by solar radiation and wind;
(b) Leaching out by rain and flowing water;
(c) Rapid cooling during the first few days after placing;
(d) High internal thermal gradients;
(e) Low temperature of frost;
(f) Vibration and impact which may disrupt the concrete and interfere with its bond to the reinforcement.All
concrete, unless directed otherwise by Engineer, shall be cured by use of continuous sprays or pounded water or
continuously saturated coverings of sacking, canvas, hessian or other absorbent material for the period of
complete hydration with a minimum of 7 days. The quality of curing water shall be the same as that used for
mixing.Where a curing membrane is directed to be used by the Engineer, the same shall be of a non-wax base and
shall not impair the concrete finish in any manner. The curing compound to be used shall be got approved from
Signature of Bidder Page 44 of
the Engineer before use and shall be applied with spraying equipment capable of a smooth, even textured coat.
Curing may also be done by covering the surface with an impermeable material such as polyethylene, which shall
be well sealed and fastened. Extra precautions shall be exercised in curing concrete during cold and hot weather.
CONSTRUCTION JOINTS AND KEYS
Construction joints will be as shown on the drawing or as approved by Engineer. Concrete shall be placed without
interruption until completion of work between construction joints. If stopping of concreting becomes unavoidable
anywhere, a properly formed construction joint shall be made with the approved of Engineer. Dowels for concrete
work, not likely to be taken up in the near future, shall be coated with cement slurry and encased in lean concrete
as indicated on the drawings or as directed by Engineer. Before resuming concreting on a surface which has
hardened all laitance and loose stone shall be thoroughly removed by wire brushing/hacking and surface washed
with high pressure water jet and treated with thin layer of cement slurry for vertical joints and a 15 mm thick layer
of cement sand mortar for horizontal layers, the ratio of cement and sand being the same as in the concrete mix.
When concreting is to be resumed on a surface which has not fully hardened, all laitance shall be removed by wire
brushing, the surface wetted, free water removed and a coat of cement slurry applied. On this a layer of concrete
not exceeding 150 mm thickness shall be placed and well rammed against the old work. There after work shall
proceed in the normal way.
FOUNDATION BEDDING
All earth surfaces upon which or against which concrete is to be placed, shall be well compacted and free from
standing water, mud or debris. Soft or spongy area shall be cleaned out and back filled with either soil
cement mixture, lean concrete or clean sand compacted as directed by Engineer. The surfaces of absorptive
soils shall be moistened.
The frame work for concrete works shall be such as to give the finish as specified; defects due to bad
workmanship (e.g. damaged or misaligned forms, defective or poorly compacted concrete) will not be
accepted. The Contractor shall construct the formwork using the correct materials and to meet the
requirements of the design and to produce finished concrete to required dimensions, plumbs, planes and
REPAIR AND REPLACEMENT OF UNSATISFACTORY CONCRETE
Immediately after the shuttering is removed, all the defective areas such as honey combed surfaces, rough
patches, holes left by form bolts etc. shall be brought to the notice of Engineer who may permit patching of the
defective areas or reject the concrete work. All though holes for shuttering shall be filled for full depth and neatly
plugged flush with surface. Rejected concrete shall be removed and replaced by Contractor at no additional cost to
Client.For patching of defective areas all loose materials shall be removed and the surface shall be prepared as
directed by the Engineer.Bonding between hardened and fresh concrete shall be done either by placing cement
mortar or by applying epoxy. The decision of the Engineer as to the method of repairs to be adopted shall be final
and binding on the Contractor and no extra claim shall be entertained on this account. The surface shall be
saturated with water for 24 hours before patching is done with 1:5 cement sand mortar. The use of epoxy for
bonding fresh concrete shall be carried out as directed by Engineer.
HOT WEATHER REQUIREMENTS
Signature of Bidder Page 45 of
Concreting during hot weathers shall be carried out as per IS: 7861 (Part-I) Adequate provisions shall be made to
lower concrete temperatures which shall not exceed 40 Deg. C at the time of placement of fresh concrete.Where
directed by Engineer, Contractor shall spray non-wax based curing compound of unformed concrete surfaces at no
COLD WEATHER REQUIREMENTS
Concreting during cold weather shall be carried out as per IS : 7861 (Part-II). The ambient temperature during
placement and upto final set shall fall below 5 Deg. C. Approved antifreeze/accelerating additives shall be used
where directed.For major and large scale concreting works the temperature of concrete at time of mixing and
placing, the thermal conductivity of the formwork and its insulation and stripping period shall be closely
LIQUID RETAINING STRUCTURES
The Contractor shall take special care of concrete for liquid retaining structures, underground structures and those
others specifically called for to guarantee the finish and water tightness. The minimum level of surface finish for
liquid retaining structures shall be as per clause D.6.16. All such structures shall be hydro-tested.The contractors
shall include in his price of hydro-testing of structure, all arrangements for testing such as temporary bulk heads,
pressure gauges, pumps, pipelines etc.Any temporary arrangements that may have to be made to ensure stability
of the structures shall also be considered to have been taken into account while quoting the rates.Any leakage
that may occur during the hydro-test or subsequently during the defects liability period or the period for which the
structure is guaranteed shall be effectively stopped either by cement/epoxy pressure grouting, gunting or such
other methods as may be approved by the Engineer. All such rectification of the Client / Engineer at no extra cost
TESTING CONCRETE STRUCTURE FOR LEAKAGE
Hydro-static test for water tightness shall be done at full storage by Engineer, as described below:
In case of structures whose external faces are exposed, such as elevated tanks, the requirements of the test shall
be deemed to be satisfied if the external faces show no sign of leakage or sweating and remain completely dry
during the period of observation of seven days after allowing a seven day period for absorption after filling with
water.In case of structures whose external faces are submerged and are not accessible for inspection, such as
underground tanks, the structures shall be filled with water and after the expiry of seven days after filling,the level
of the surface of the water shall be recorded. The level of water shall be recorded again at subsequent intervals of
24 hrs, over a period of seven days. Backfilling shall be withheld till the tanks are tested. The total drop in surface
level over a period for seven day shall be taken as an indication of the water tightness of the structure. The
Engineer shall decide on the actual permissible nature of this drop in the surface level, taking into account weather
the structures are open or closed and the corresponding effect it has on evaporation losses. Unless specified
otherwise, a structure whose top is covered shall be deemed to be water tight if the total drop in the surface level
over a period of seven days does not exceed 40 mm.
Each compartment/segment of the structure shall be tested individually and then all together.For structures such
as pipes, tunnels etc. the hydro-static test shall be carried out by filling with water, after curing as specified, and
subjecting to the specified test pressure for specified period. If during this period the loss of water does not
exceed the equivalent of the specified rate, the structure shall be considered to have successfully passed the test.
Signature of Bidder Page 46 of
If Engineer feels that the materials i.e. .cement, sand coarse aggregates, reinforcement and water are not in
accordance with the specifications or if specified concrete strengths are not obtained, he may order tests to be
carried out on these materials in laboratory, to be approved by the Engineer, as per relevant IS Codes. Client shall
pay only for the testing of material supplied by the Client, otherwise Contractor shall have to pay for the tests.
Transporting of all material to the laboratory shall however be done by the Contractor at no extra cost to client. In
the even of any work being suspected of faulty material or workmanship requiring its removal or if the works
cubes do not give the stipulated strengths, Engineer reserves the right to order the Contractor to take out cores
and conduct tests on them or do ultrasonic testing or load testing of structure, etc. All these tests shall be carried
out by Contractor at no extra cost to the Client. Alternatively Engineer also reserves the right to ask the Contractor
to dismantle and re-do such unacceptable work at the cost of Contractor. If the quoted unit rates/prices of
concrete shall be deemed to provide for all tests mentioned above.
All materials, workmanship and finished construction shall be subject to continuous inspection and approval of
Engineer. Materials rejected by Engineer shall be expressly removed from site and shall be replaced by Contractor
immediately at no extra cost to Client.
Upon the completion of concrete work, all forms, equipment, construction tools, protective coverings and
any debris, scraps of wood etc. resulting from the work shall be removed and the premises left clean.
ACCEPTANCE CRITERIA
Any concrete work shall satisfy the requirements given below individually and collectively for it to be acceptable.
a) Properties of constituent materials;
b) Characteristic compressive strength;
c) Specified mix proportions;
d) Minimum cement content;
e) Maximum cement content;
f) Workability;
g) Temperature of fresh concrete;
h) Density of fully compacted concrete;
i) Cover to embedded steel;
k) Tolerances in dimensions;
l) Tolerances in levels;
n) Surface finishes;
o) Special requirements such as :
(i) Water tightness;
(ii) Resistance to aggressive chemicals
(iii) Resistance to freezing and thawing
(iv) Very high strength
(v) Improved fire resistance
(vi) Wear resistance
(vii) Resistance to early thermal cracking
Signature of Bidder Page 47 of
The Engineer’s decision as to the acceptability or otherwise of any concrete work shall be final and binding of the
Contractor. For work not accepted, the Engineer may review and decide whether remedial measures are feasible
so as to render the work acceptable. The Engineer shall in that case direct the Contractor to undertake and
execute the remedial measures. These shall be expeditiously and effectively implemented by the
Contractor.Nothing extra shall become payable to the Contractor. Nothing extra shall become payable to the
Contractor by the Client for executing the remedial measures.
Item No:07 Constructing Slab type Chamber of following size including excavation, refilling, BBCC (1:5:10), for
foundation, C.C.Channel (1:2:4) finished, 15 mm thick cement plaster inside & outside in CM 1:3,
finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered
masonary in CM 1:5, RCC Slab in CC 1:1.5:3, including Centering & reinforcement but excluding the cost
of chamber seat cover etc..completed.(a) A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to
0.90meter for pipe dia <=150mm.
(B) 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=20 mm. (C) 0.75 X
0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter for pipe dia <=230 mm
The inspection chamber shall be constructed as per plan and section approved by the city engineer. The
specification for different items are as under:
This shall be done as per specification in Item No.
(ii) Brickbats cement concrete in proportion (1:5:10) For detailed specification refer R & B Dept.
booklet for General Technical Specification for building works , Page no. 31 , Section. No. 5.3.8(a)
(iii) Brickwork(1:5): For detailed specification refer R & B Dept. booklet for General Technical
Specification for building works , Page no. 43 , Section. No. 6.12(B).
(iv) C.C. Channels : Cement concrete of the invert and channels of manholes shall consist on a part 1 part
of cement 2 part of sand, 4 part of black trap metal or other approved material of size 1/4' to 1' well grade
as per instruction.
The work shall be done as per P.W.D. hand book specification No. 20 and as per general instruction of C.E.
The rate includes all necessary materials mixing lifting placing ramming watering etc. the expressed faces
to be neatly of the channels shall be half round as per drawing and instructions of the engineer in charge.
(V)Cement Plaster(1:3) :For detailed specification refer R & B Dept. booklet for General Technical
Specification for building works , Page no. 104 , Section. No. 17.58(I) Except that the thickness of the
plaster shall be 15 mm instead of 10 mm.
FRC SEAT COVER:
Frame shall be fixed in cement concrete all around and finished with neat cement. The. F.R.C
(L.D.-25) chamber seat and cover shall be as per central store approved design. Cover [ 706 x 556 x 50 mm
rectangular cover. 2.5 mt load design 50 x 2 mm MS flat all round. 12 mm ǿ plain round bar for lifting the
cover & should be fitted with plastic caps ] and frame [ 600 x 450 mm clear opening, outer size 816x
666x100 mm.on the upper periphery of frame 25 x 3 mm wide M.S. flat should be well embedded in
concrete to protect the edge of frame ]etc.comp..
The M/s shall be on No. Basis.
Signature of Bidder Page 48 of
Item No.08 Labour work for fixing any kind of paving with cement pointing in CM 1:2, including watering,
ramming etc. comp. as dir. For pavement. (I) Laying on Sand bedding as per requirement to fix the C.C.Block /
Nibhada Stone in Line & Level
Work shall be carried out as per item description including cost of all labour and materials etc. complete
as directed. General standard practice of laying of paver block is applicable.
The measurements shall be on Smt. basis.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as mentioned in the drawing / instruction of Engineer-in-Charge
and/or his authorized representative. Cost includes formworks using rubber mould, Rate providing and laying
paver blocks as per required grading and specification. The paver block shall be mechanically compacted. The
work of paving blocks shall be executed in line and level by skill mason of flooring work only. It should be laid in
such a way that the no cutting of the paver block to be necessary. if cutting of paver block necessary then it
should be cut by machine only and carting. The finished surface of the paver block shall have resonably good,
plain finished. Paver blocks shall be compacted and shall be relaid if necessary. Gravel or such type of materials
shall not be allowed for production. Laying on 50 mm thick sand bedding.
• Laying on 50 mm thick sand bedding.
Scope of work :
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil murrum
including sorting outs and stacking of useful materials stuff up to 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various Retail
outlets. The work includes: Verification of the existing site condition and advising our project in charge
to lay suitable base course if required. Contractors are required to satisfy themselves with quality of sub
grade, sub-base course before the paver blocks are laid and suggest strengthening if required.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
Manufacturing of paver blocks in your plant as per requirements in technical specification enclosed.
Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand bedding,
within shortest possible time the site is public place hence care should be taken to ensure that the
routine activities should not be disturbed. The job of laying may required to be carried out during night
also.Testing of paver blocks shall through reputed Govt. /Non Govt. Test house only and submission of
test results as per requirements in Technical Specifications. AMC reserves the right to carryout test at
random. Cost for such tests to be borne by party. The contractor shall guarantee that all material and
components designed, fabricated, supplied, and laid by him shall be free from any type of defect due to
faulty material and/or workmanship/erection for a period of One year from the date of completion of
work. However, the contractor one year's shall render free maintenance.
Signature of Bidder Page 49 of
TECHNICAL SPECIFICATIONS:
Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the moulds.
The machine should have automatic control panel
for uniformity in strength.
Concrete Batching & Mixing Plant: (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient should
be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should
equipped with automatic control panel for maintaining water cement ratio from batch to batch to obtain
concrete of uniform quality and strength. The plant should be equipped with adequate mechanism for
mechanized loading of raw materials into mixer and conveyor belt for transportation of concrete from
mixer to concrete block making machine to maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks.
Laboratory (Desirable but not essential) :
The testing equipment should have required in the Laboratory as per the following: A Compression
testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
Systematic record of test results of various paver blocks manufactured in the factory. Concrete Mix
Design for various grade of concrete used for making of paver blocks.
Specifications For Coloured Paver Blocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or equivalent
approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour
pigment of 3% by weight of cement. The colour shade shall be “RED” as selected by AMC before
commencement of the work. White cement shall be used for colored pavers to obtain the desired colour
shade. The job also includes providing 50 mm thick sand bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from
the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as
per attachment.
Pavers Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should
be retained until the laying. The surface should be reasonably smooth and of anti skid and anti glare
type. The paver should have uniform chamfers to facilitate easy drainage surface run off. The pavers
should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after vibration
Signature of Bidder Page 50 of
on the paver Surface. The concrete mix design should be followed for each batch of materials separately
and automatic batching plant is to be used to achieve uniformity in strength and quality. The pavers shall
be manufactured in single layer only. Skilled labour should be employed for laying blocks to ensure line
and level of laying, desired shape of the surface and adequate compaction of the sand in the joints. The
pavers shall be of cement gray colour without any pigment & for coloured pavers refer “specifications
for coloured pave`” The pavers are to be skirted all round with kerbing using solid concrete blocks of size
150mm X 250mm X 380mm. The kerbing should be embedded for 100mm depth. The concrete used for
kerbing shall be cured properly for 7 days minimum.
Paver Block Dimensions:
Thickness 60 mm
Shape Unipaver, I shape or directed by Addl.C.E.
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of any pigment.
For coloured pavers refer “specifications for
coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
Testing of Paver Blocks :
SR. NO. TEST Average Values Frequency
1. Compressiv Strength Min. 35 N/Sq mm for 60 250 Smt / 1 Test
2. Flexural Strength Minimum 4.5 N/Sq mm
3. Abrasion Resistance Maximum 1.5 N/Sq mm
4. Water Absorption Maximum 5.80%
* Sampling and testing procedure as per enclosed specifications.
Sampling and Testing Procedure for Paver Blocks
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than 5000 blocks, shall be
divided into ten approximately equal groups. Three blocks shall be drawn from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated section of
part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to
the paving in transit. Protect the paving from damage and contamination until they have been tested.
The testing shall be carried as soon as possible, after the sample has been taken. As soon as practicable
after sampling. The samples shall be stored in water at 20 degree C 5 degree C for 24 hours prior to
Signature of Bidder Page 51 of
The item is to be executed as per instructions and to the entire satisfaction of Engineer-in-Charge and/or
his authorized representative using Rubber mould and Table vibrator for Kerb instead of mechanical
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet,
metal, soling etc. complete with stacking the materials as directed. The road surface of asphalt shall
carefully be opened to full width as directed by the Engineer-in-Charge and/or his authorized
representative.
Excavation area shall be properly identified and marked in rectangular shape. The road crust shall be
opened up to entire depth i.e. including soling. All the materials shall be separately deposited in such a
way and in places as may be determined by the Engineer-in-Charge and/or his authorized
representative. In case rubble not being so deposited or being mixed up with the excavated materials
will not be allowed for refilling. The cost of materials shall be charged from the contractor. The decision
of the C.E. shall be final and binding to the contract.
For detailed specification for Laying of Paver Block on sand bedding, refer R & B Department booklet for
General Technical Specification for building works. The rate shall be for a unit of SMT.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb Block for Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or equivalent quality for pre-cast blocks, reasonably
exposed finish/ formwork , mould with well equipped with vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include the flush pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of the kerb stone fixed with Bituminous concrete mixed in proper
position as directed by Engineer in change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production. a) Laying on 5 cm thick Sand Bedding.
Supplying and fixing M-20 grade using black trap aggregate of Sevaliya/Timba or equivalent quality
mm. nominal size for pre-cast reasonably exposed finish/, formwork using mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include excavation and erecting and fixing the kerbs in position with
necessary equipments and materials. The rate shall also include the flush pointing in CM (1:3) for all joints
including kerb stones of approval design (Sample must be got approved). In any case Gravel or such type of
materials shall not be allowed for production .a) Laying on 5 Cms thick Sand Bedding Kerb Stone Fixing 300mm-L
Supplying and fixing M-20 grade using black trap aggregate of Sevaliya/Timba or equivalent quality
mm. nominal size for pre-cast reasonably exposed finish/, formwork using mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include excavation and erecting and fixing the kerbs in position with
necessary equipments and materials. The rate shall also include the flush pointing in CM (1:3) for all joints
including kerb stones of approval design (Sample must be got approved). In any case Gravel or such type of
materials shall not be allowed for production. a) Laying on 5 Cms thick Sand Bedding.
Signature of Bidder Page 52 of
Water shall confirm to M-1. Cement to M-2. Sand to M-5. Grit to M-7. Graded stone aggregate 20 mm.
nominal size to M-10.
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific
machineries shall be used to manufacture the Precast blocks. These machineries should be compatible to
produce blocks of required strength and dimensions. The machine shall contain hydraulic Press or advanced
equipment to generate required compaction & Grade and finish. Moulds/ Steel Plates/ Dies of the machine shall
be dimensionally checked & to be got approved before commencing the production. Contractor shall prepare
proper Drying Yard for keeping the blocks before curing. The drying yard shall be levelled and covered so that no
shrinkage cracks are formed. Contractor shall prepare adequate size curing pond to cure the blocks for not less
than 21 Days. No other means of curing shall be allowed. The technical specification of concrete shall confirm to
IS 456-2000. The concrete mix is not required to be designed and only nominal mix as per IS : 456-2000 shall be
followed. The proportion of the concrete mix shall be 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone
aggregate 20 mm. nominal size) by volume. Concrete work shall have fairly exposed concrete surface or as
specified in the item. The designation ordinary M-10, M-15, M-20, M-25 specified as per I.S. corresponds
approximately to 1:3:6, 1:2:4, 1:1.5:3 and 1:1:2 nominal mix of ordinary concrete, by volume respectively. The
ingredients required for ordinary concrete containing one bag of cement of 50 Kg. by weight (0.0342 m3.) for
different proportions of mix shall be as per IS 456-2000. The proportion of the aggregate for the kerb stone shall
be modified as per the approval of the engineer-in-charge. The water cement ratios shall not be more than those
specified as per IS. The cement of the mix shall be increased, if the quantity of water in a mix has to be increased
to overcome the difficulties of placement and compaction so that the water cement ratio specified in the table is
not exceeded. The maximum size of coarse aggregate shall be as large as possible within the limits specified but
in no case greater than 1/4th of the minimum thickness of the member, provided that the concrete can be placed
without difficulty so as to surround all reinforcement thoroughly and to fill the corners of the form. For
reinforced concrete work, coarse aggregates having a nominal size of 20 mm. are generally considered
satisfactory. Admixture shall be used in concrete only with approval of the Engineer-in-charge based upon the
evidence that with the passage of time, neither the compressive strength of concrete is reduced nor are other
requisite qualities of concrete impaired by the use of such admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of 50 Kg.
weight. The volume of one such bag being taken as 0.0342 m3. Boxes of suitable sizes shall be used for measuring
sand and aggregate. The size of the boxes (internal) shall be 30cm. x 30 cm. and 38 cm. deep. While measuring
the aggregate and sand, the box shall be filled without shaking ramming or hammering. The proportioning of
sand shall be on the basis of its dry volume and in case of damp sand, allowances for bulk age shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be
kept in first class working condition and maintained throughout the construction. Measured quantity of
aggregate, sand and cement required for each batch shall be poured into the drum of the mechanical mixer while
it is continuously running. After about half a minute of dry-mixing, measured quantity of water required for each
batch of concrete mix shall be added gradually and mixing continued for another one and a half minute. Mixing
shall be continued till materials are uniformly distributed and uniform colour of the entire mass is obtained and
each individual particle of the coarse aggregate shows complete coating of mortar containing its proportionate
amount of cement. In no case shall the mixing be done for less than 2 minutes after all ingredients have been
Signature of Bidder Page 53 of
put into the mixer. Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned
before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge, the first batch of concrete
from the mixture shall contain only 2/3rds of normal quantity of coarse aggregate. Mixing plant shall be
thoroughly cleaned before changing from one type of cement to another.
The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete, shall be determined by regular slump tests in accordance with IS : 1199-1959. The slump of 10 mm. to
25 mm. shall be adopted when vibrators are used.
All Moulds shall be cleaned and made free from standing water, dust, snow or ice immediately before
placing of concrete.
Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the Precast blocks. All the edges of the Precast blocks
shall confirm the profile of the final drawing & edges/ curvatures of the moulds shall be checked accordingly.
Moulds shall be regularly checked for correctness of dimensions of Blocks, twists, bends due to handling, etc..
before starting every days work.
Care shall be taken to set all formwork/Mould in perfect line, level (or in required camber or slope as specified)
and plumb. Formwork/Mould propping shall be strong, rigid and sturdy. The formwork/Mould shall be as per
pattern & design shown in drawings. Formwork/Mould shall be done accurately and precisely so as to achieve
neat, clean and smooth concrete surface, in line, level and plumb. Clinks, twists, offsets, warps, riveting etc. in
plates or forms shall not be allowed. Before placing concrete, forms shall be thoroughly cleaned off of all rust,
dust and loose materials. Colorless oil or grease of approved quality shall be applied before placing steel. Also the
formwork material will be of wood/plywood/steel or any sort of such material, as approved by the Engineer in
charge, so that all exposed concrete surfaces have uniform colour.
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in charge)of cement shall
Removal of Moulds:
Specific time shall be identified for removal of moulds, such that the concrete of the Precast blocks shall gain
strength to withstand the stresses generated due to self weight and handling to drying yards without any
deformation to shape/ dimensions/ edges.
Drying Period: Sufficient time shall be given to the block after it is removed from the mould so that it can gain
strength and dry in shade to prevent any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site:
Water should be drained of from the block before it is actually sent to the site. Time should be provided
for proper draining of water which may be present in the block kept for curing in the pond.
Signature of Bidder Page 54 of
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses leading to breaking
of block. Care should be taken to prevent the block from breaking during transporting.
The pits of the size 0.15 M in width and required depth shall first be excavated, true to line and level. The
relevant specifications of item A- 1 shall be followed for excavation work. The pits shall be filled with a layer of
0.05 M. thick sand bedding. The curbs then shall be placed in position of which 50mm. shall be below road. Care
should be taken to maintain proper line and level. The joints between the kerbs shall be pointed with C.M. 1:2
and cured for minimum seven days.
Sampling and testing of concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with IS : 516-1959. A random sampling procedure
shall be adopted to ensure that each concrete batch shall have a reasonable chance of being tested i.e. the
sampling should be spread over the entire period of concreting and cover all mixing units.
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each sample, 5 for
testing at 7 days and the remaining 5 at 28 days. The samples of concrete shall be taken on each day of the
concreting as per above frequency. The number of specimens may be suitably increased as deemed necessary by
the Engineer-in-charge when procedure of tests given above reveals a poor quality of concrete and in other
special cases. The average strength of the group of cubes cast for each day shall not be less than the specified
cube strength of 200 Kg/cm2. at 28 days. 20% of the cubes cast for each day may have value less than the
specified strength provided the lowest value is not less than 85% of the specified strength. If the concrete made
in accordance with the proportions given for a particular grade, does not yield the specified strength, such
concrete shall be classified as belonging to the appropriate lower grade. Concrete made in accordance with the
proportions given for a particular grade shall not, however, be placed in a higher grade on the ground that the
test strength are higher than the minimum specified. If rock pockets/honeycombs in the opinion of Engineer-in-
charge are of such an extent or character so as to effect the strength of the structure, materially or to endanger
the life of the steel reinforcement, he may declare the concrete defective and require the removal and
replacement of the portion of the structure affected.
Precast Kerb Stones :
The relevant specifications of concreting as per item above shall be followed except that work shall be
carried out for precast concrete kerb stones as specified in the item. All Precast members shall be cast at
workshop. Sufficient curing shall be done before placement of the same The method of transporting and
placing the precast members shall be as approved by the Engineer-in-charge. Members shall be so transported
that no breakage or undue stresses are induced in them. If required, all members shall have a key provided on
both the faces i.e. top and bottom surfaces, of adequate size so as to fill the same with concrete while laying.
The function of this key is to avoid the leakage through the joint between the precast member and the member
on which it is laid.
Mode of Measurements and Payment :
Signature of Bidder Page 55 of
The rate shall include cost of formwork but exclude the cost of reinforcement. The volume occupied by
reinforcement shall not be deducted from R.C.C. work.
Mode of measurements and payment: The rate shall be for a unit of Rmt.
(A) Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and removing manhole cover and
debris from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
Relevant specification shall be followed as per item description : Repairing damaged M.H. and rasing
M.H. upto road level incl. removing damaged brick work and repairing by brick masonry in C.M. 1:5
C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the debris from MH and carting the
same as directed.
The measurement shall be in Nos. basis Manhole.
Repairing damaged I.C./Raising removing damaged brick work and repairing by brick masonry in C.M. 1:5 and
plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover, removing the debris from chamber
and carting the same as directed. (Based on Drainage SOR 2015-16 Item No.22)
Relevant specification shall be followed as per item description : Repairing damaged I.C. and rasing up to
road level incl. removing damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster
C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the debris from MH and carting the
same as directed.
The measurement shall be in Nos. basis Manhole.
Item No.13:- Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
(a) F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø & 100 mm thick
circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain round bar for lifting
the cover & should be fitted with plastic cups. Frame : 560 mm ø clear opening, outer size-
888x888x175 mm. On the upper periphery of frame 25 x 3 mm wide MS flat should be well embed
in concrete to protect the edges of frame. FRC E.H.D.-35 manhole cover & frame described as above (As
Per Central Store)
(B) (SET cover and frame) F.R.C. Heavy Duty [HD-20] Machinehole Covers & Frames - 560 mm ø clear
opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 :2002 table
(C) (SET cover and frame) F.R.C. Medium Duty [MD-10] Machinehole Covers & Frames - 560 mm ø clear
opening, The dimension of frame and cover as per mentioned in Amend No. 1 to IS 12592 :2002 table
(SET cover and frame)
Signature of Bidder Page 56 of
(D) (SET cover and frame) F.R.C. Light Duty [LD-2.5] Machinehole Covers & Frames - 560 mm ø clear
opening, The dimension of frame and cover as per mentioned in Amend No. 1 to IS 12592 : 2002 table
(E) (SET cover and frame) F.R.C. Medium Duty [MD-10] Chamber Covers & Frame - 600 x 450 mm clear
opening, The dimension of frame and cover as per mentioned in Amend No. 1 to IS 12592 : 2002 table
(F) (SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber Cover & Frame - 600 x 450 mm clear
opening,The dimension of frame and cover as per mentioned in Amend No. 1 to IS 12592 : 2002 table
(G) (SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber Cover & Frame - 450 x 450 mm clear
opening,The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
The Item shall be carried as per Item mentioned in tender document and as per instruction of Engineer-in-
Charge and/or his authorized representative.
The mode of payment for this item shall be on Nos. Basis based on actual weight of Machine hole frame.
Providing and fixing S.W. gully trap with C.I. grating brick masonry chamber and water tight C.I. cover with
frame of 300mm x 300mm size (inside) with standard weight.(i) Square mouth traps.(B) 150mm x 100mm size P
or R type (Building S.O.R. 2023-24, I.C.24006B , Iteam No. As Per NBO 24.19)
Mode of measurements and payment: The rate shall be for a unit of No.
Item No : 15 & 16 Providing and supplying ISI marked only Standard length Stoneware pipes in
standard lengths of following class and diameter including all taxes, insurance,
transportation, freight charges, octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc.
(IS - 651 / 1989) (Based on GWSSB SOR 2022-23, Item No. 11.0 P-17)
100mm, 150mm,230mm AA Class
The pipes shall be of best quality stone ware pipes. The pipes shall be of approved quality and make and
shall be brought on site after approval. (The pipes shall be laid in grade as per instruction) contractor shall
have introduce bills for standard pipes.The joints shall be done in cement prop. (1 : 1) (1 part cement :
part sand) using spun yarn dispend in hot asphalt and caulking tools. The hydraulic pressured test shall be
given be the contractor for testing pipes and jointing. No. trenches shall be filed without the approval of
the Engineer in charge. The rate of the pipes work are inclusive of excavation and refilling. The excavation
etc. shall be done as follows :
The sewet trench shall be excavated to the alignment and gradient shown on the plan and section. In all
storts soil including oil masonary asphalt roads and wet. excavation . The sewer excavation shall be
commenced at the down stream end of the sewer and be continued upto thegradient as directed. The
trench shall not open more than 60 meters in advace of the completed sewer only when directed by the
Engineer in charge looking to the progress of the work in obtaining the formation of the bottom of the
trenches the usual methods of suing sight rails and bonning roads shall be adopted during the whole of the
process. The center line of uniform height shall be carried clearly on each rail. The depth of the excavation
and invert of the sewer shall be checked by means of bonning road of appropriate length and also straight
edge. The bed of the trench be shall well remmed before starting laying of sewer lines and cement concrete
and masonary work. Where trenches are deep in bad grounds the sides shall be supported by suitable
timbering of shorting work looking to the nature of soil near big or important structures, the sides of the
Signature of Bidder Page 57 of
trenches shall be closely and securely timbered. If any settlement of the building is anticipated the
timbering shall be left in the ground. The various materials excavated shall be separately stacked so that in
refilling the may be relaid on the same order as before and least possible damage shall be done carpet on
the public roads and private properties. Surface covering consisting of asphalt carpet shall be kept on one
side and preserved for reinstatement. The excavated earth shall not heaped near the renchers so as to
caused unnecessary obstruction along the pulling inspection, trenches etc. shall be tunneled under only as
necessary. The side of the trenches shall be nearly vertical and plumb & red light shall be placed at each
end at intervals as instructed and further protested by rope fence. Necessary caution boards shall also be
erected and diaced as directed by the Engineer in charge. Wherever possible material excavated from the
trenches of whatever kind shall not placed nearer than 3 meters from the outer edge of the excavated
trench. The utmost shall have to be taken in refilling the trenches so that no damage may be done no sewer
no lump shall be allowed to be put around the sewer. The remming of the filling shall be done and well
watered. The surplus earth shall be removed directed within 30 meters lead. The measurement of the work
shall be exact length and width of the trench as specified or as per City Engineer instruction and depth shall
be measured vertical as per section upto invert or the pipe lind The City Engineer reserves the right of extra
excavation on either side if considers necessary for the safely of the work. The bottom and sides of the
trench shall be dressed in level and plumb in all directions before any concrete in India. In case the
excavation is done deeper than required no filling shall be allowed to bring the formation to proper level
but contractor shall have to lay cement or lime be concrete of filling or other acceptable materials as
directed by C.E. at contractor won cost so as to come to proper information, in case bas formation are met
with the work shall have be done as per instruction of C.E. necessary arrangements for watering trenches
must be provided be contractor and without proper watering trenches will not be allowed to be tilled to
further. Contractor shall have to make arrangement for acees to invert of the sewer and for inspection of
the ware as ordered by the Engineer. If is required to shired or after the alignment section of diameter of
the pip the contractor shall carry or altered the alignment section or diameter of the pipe the contractor
shall carry out the altered work at the rates quoted by him for the original work for items and contractor
shall not claim any expenses due to the changes made. In case no work shall be done at night or on Sundays
& other holidays and during the recess time except in and other holiday the case of bad grounds such as
running sand where the work must be executed various day night without intruption when so ordered by
the Engineer. All existing water pipe storm drains sewer line railway tract, electric cables etc. which do not
in the opinion of Engineer required to be charged in location shall be supported and protected from injury
by the contractor. The contractor shall be liable to pay all damages to water pipe, drains electric and
telephone cables and to private property during the execution of this contract and the same will be
recovered from the running bills or the deposit of work whenever it becomes necessary in the opinion of
the Engineer in charge location of any existing sewers drains etc. not otherwise from in these specification
the contractor shall do the work of making such change and the work shall be paid for as extra work. All
places of public utility etc. shall be kept accessible for use. No extra payment shall be made for land sides
and side slopes done without prior approval of the Engineer in charge. Wherever natural soil commends
winder excavation the mentioned above the same shall be given after approved C.E. The rate for
excavation for easy jointing and caulking nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the lines are
checked and approved of and order given by the Engineer in charge. The refilling shall be accompanied by
through watering the layers of 0.50 metrs. Further refilling shall be done there after and process should be
repeated till trenches are completely refilled. Temping and ramming with rammers shall have to be done at
all place of important work where ordered by Engineer in charge.
After the trench is give the trenches shall have to be refilled within 4 days with complete watering. If the
contractor fails to do watering satisfactory corporation shall get it done at the risk and cost of the
Signature of Bidder Page 58 of
contractor with or without giving any notice and the expenses incurred in doing so recovered from the
contactor either in cost or from his payment through bills.
The rate shall be for a unit of one Rmt basis.
Constructing Bombay Pattern Type Catch Pit of size 600 mm x 600 mm & depth up to 1000 mm
including excavation, B.B.C.C. (1:5:10), 23 cms thick brick masonry wall in the prop. of CM (1:6) with
40 mm thick IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the catch
pit in the proportion of CM (1:3) without jali etc. comp. as directed by E.I.C.
600mm x 600mm x 1000mm Depth
For detailed specification refer clause No. 24.44.1 of R & B Department booklet for General Technical
Specification for building works.
Extra Depth of Catch pit size 600mm x 600mm for every additional depth of 100 mm or
Part thereof beyond 1000mm depth upto 1500 mm depth
For detailed specification refer clause No.24.46 of R & B Department booklet for General Technical
Specification for building works.
Mode of measurement and payment
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He
shallalso be responsible for the cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
CatchPit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc. comp.. As directed
by engineer in charge.
Providing and Supplying of catchpit Jali P/F FRC catch pit jali with frame 750mm x 750mm clear opening
including transportation from making yard to road store As per RA (Without GST)
Mode of measurements and payment: The rate shall be for a unit of No.
Item No : 19 Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to avoid
accident & for smooth traffic diversion & movement including cautionary board etc. Item also includes
for making temporary sufficient nos of lighting arrangement through out the work with necessary
required arrangement. The same shall be removed after completion of work. (Only for break down work
from start to complete) (Based on Drainage SOR 2015-16)
For detailed specification refer5th revision of MORTH (2013) & also amendment shall be applicable to the
latest versions.
The M/s shall be on SMT basis.
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
Signature of Bidder Page 59 of
E TENDER NOTICE NO. – /2026-27
Special Tender Clause For CCRS SLA
Ahmedabad Municipal Corporation has to make a special clause as per for SLA
Name of work :- FtrzgtJtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht mwaJJtbtk ytJlth ftbtu <ubs 70:20:10 le Mfeb
nuX¤ltk ftbtu <&t yLg csux vife ftjwvwh rJM<thbtk swœe swœe vtu¤tubtk, Fzfeytubtk, atufXtbtk yth.me.me. htuz <&t ELxhjturfkk kd vuJh çjtuf fhJtlt ftb ctc<.
<t.22.01.2026 lt htus bu.Bgwrlrmvjfrb§hmtnucle Jefje bexekdbtk &guj aatobtk bwÆt lk.21 bwsc
su <u me.me.yth.yum.le Vhegtœlu y.Bgw.ftu.îtht cltJuj Ôntuxmyuv d{wvbtk bwfgt ctœ «tuçjubJtRÍ yum.yuj.yu.lt mbgdt¤t ctœ fhuj ftbdehe btxu,awftJJtlt &<t
ltKtkbtk&e y.Bgw.ftu.lt rl<e-rlgb bwsc vulÕxe leau bwsc fhJtbtk ytJNu.
(A) Penlty For Maintenance and SLA Purpose
CCRS within SLA time (Category & Problem wise) CCRS After SLA time (Category
& Problem wise Penlty)
Department Category Problem SLA Penalty Penalty Penalty
(Hours) (Hours) (Hours)
Engineering Water>>Engineering Water-low presure 240 240 480
Engineering Water>>Engineering Water-No Supply 240 240 480
Engineering Water>>Engineering Water-Other 72 72 144
Engineering Water>>Engineering Water-Leakage In Main 48 48 96
Engineering Water>>Engineering Water-Pollution In Supply 24 24 48
Engineering Drainage>>Engineering Drainage-Manhole Cover 24 24 48
Engineering Drainage>>Engineering Drainage-Other 48 48 96
Engineering Drainage>>Engineering Drainage-Choking Of Line 48 48 96
Engineering Drainage>>Engineering Drainage-Public Toilets and 72 72 144
Urinals-Drainage Line Hours
Blockage or Choking
Engineering Road Road-Other 48 48 96
Engineering Road Road-Bhuva On Road 48 48 96
Signature of Bidder Page 60 of
Engineering Road Road-Repair Require 72 72 144
Engineering Storm Water Road-Water logged Due To 24 24 48
Engineering Storm Water Road-Catch Pit Repairing 96 96 192
Engineering Public Building Public Building-Public 360 360 720
Toilets and Urinals- Hours
Doors,Windows,Tiles or
Engineering Footpath Road-Footpath Repairing 168 168 336
Engineering Building>>Engineering Building-Municipal Schools 168 168 336
Repairing Hours
Wvhtuf< vulÕxele mbgbgtoœt ctœ vK ftbdehe fhJtbtk l ytJu <tu vwhuvwhe ftbdehele hfb suxje vulÕxe jtdw
(A) Penalty 10% for New Allocated Works.
(B) The Work Order under this Annual Rate Contract (ARC) Tender shall be issued
only against the approved and sanctioned estimate for the respective work.
The time limit for execution of each work shall be specified in the respective Work
Order issued under this tender.
Any penalty for delay or non-compliance shall be calculated and imposed based on
the approved sanctioned estimate amount of the respective work and shall be
governed by the relevant terms, conditions, specifications, and penalty clauses of
Seal and Signature of the Bidder Additional City Engineer (CZ)
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 61 of
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT-CENTRAL ZONE
Name of Work:- FtrzgtJtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu
îtht mwaJJtbtk ytJlth ftbtu <ubs 70:20:10 le Mfeb nuX¤ltk ftbtu <&t yLg csux vife ftjwvwh
rJM<thbtk swœe swœe vtu¤tubtk, Fzfeytubtk, atufXtbtk yth.me.me. htuz <&t ELxhjturfkk k d vuJh çjtuf fhJtlt
Sr. Rate Amount
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
1 materials and disposing off the excavated stuff upto
50 Meter lead.(A) Loose or soft soil Building S.O.R.
2023-24, I.C.04001A, Iteam No. As Per NBO
145.50 0 to 1.5 meter depth. 115.92 Cmt
Extra Rate Over Item of Excavation of Earth for
excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including demolishing
2 0.00 the asphalt carpet, metal, soiling/cutting
Reinforcement etc.comp. with stacking the material
as directed. (Based on Previously approved rate by
up to 0.20 meter thickness (By Manual) SOR -
a 48.50 (Jan. 2016) Rates for work of Drainage / SWD pipe 71.10 Smt
0.20 to 0.30 meter (By any type of Breaker
Machine or R.C.C. Cutter machine including cost of
b 48.50 operator, fuel, & transportation etc complete.) SOR 177.76 Smt
- (Jan. 2016) Rates for work of Drainage / SWD
0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including cost of
c 388.00 operator, fuel, & transportation etc complete.) SOR 311.08 Smt
- (Jan. 2016) Rates for work of Drainage / SWD
Dismantling the following including loading,
unloading and disposal of unserviceable material
3 0.00 for all lead or as directed by Engineer-In-Charge
and stacking the serviceable material and
backfilling the resulting trenches and pits complete.
Dismantling tiled or stone floors laid in mortar
including stacking of serviceable material and
a 485.00 disposal of unserviceable material with all lead and 47.25 Sqm
lifts. Building S.O.R. 2023-24, I.C.20005, Iteam No.
Demolition including stacking of serviceable
materilas and disposal of unserviceable materials
b 2.50 with all lead and lift. (i) R.C.C. work. Building 1047.38 Cmt
S.O.R. 2023-24, I.C.20002, Iteam No. As Per NBO
Demolition of Brick work and stone masonry
c 2.50 including stacking of serviceable materilas and 544.95 Cmt
disposal of unserviceable materials with all lead
and lift. (ii) In Cement Mortar. Building S.O.R.
Signature of Bidder Page 62 of
2023-24, I.C.20003B, Iteam No. As Per NBO
Conveyance of lime murrum building rubbish earth
manure or sludge & execavated rock and rubbish
4 0.00 [Lime murrum building rubbish]. Up to 5.00 Km lead
(Building SOR 2023-24 Statement No.5 Item No.
030201A1; Page no.6)
Lead up to 1.0 Km. lead
Lead up to 2.0 Km. lead
Lead up to 3.0 Km. lead
Lead up to 4.0 Km. lead
Lead up to 5.0 Km. lead
Providing and laying cement concrete 1:4:8
(1-Cement: 4- coarses and 8-hand broken
stone aggregates 40mm nominal size) and
5 48.50 curing complete excluding cost of formwork in 2653.67 Cmt
(A) Foundation and Plinth (upto 10 ton). Building
SOR 2023-24 Iteam Cod :05004A Iteam No. As
Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
6 5.03 work in (A) Foundations, footings, Base of columns 3977.88 Cmt
and Mass concrete (Building SOR 2023-24 Item Code
No. 05009A , as per NBO Item No. 5.8.2; Page no. 56)
Providing and laying in position Ready Mixed M-
200 grade concrete for reinforced cement conctere
work , using cement content as per approved
Design Mix manufactured in fully automatic
batching plant and transported to site of work in
transit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as per
mix design of specified grade for reinforced cement
concrete work including pumping of R.M.C. from
7 45.27 transit mixer to site of laying, excluding the cost of 4793.10 Cmt
centering shuttering finishing and reinforcement
including cost of admixtures in recommended
proportions as per IS: 9103 to accelerate/ retard
setting of concrete, improve workability without
impairing strength and durability as per direction of
the Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be
maintained) Building SOR 2023-24 Iteam No. As
Per NBO 5055, Page No.
Providing & Laying For Approved Quality Floor
Hardner @ 3.0 Kg/Smt. (As Per R.A.) 60.00
Providing formwork of ordinary timber planking so
as to give a rough finish including centering
shuttering strutting and propping etc. Height of
propping and centering below supporting floor to
ceiling not exceeding 4 M. and removal of the same
for in situ reinforced concrete and plain concrete
work in. (A) Foundations Footings Bases of
Columns etc. and Mass concrete. Building SOR
Signature of Bidder Page 63 of
2023-24, Iteam Code 09001AA, Iteam No. As Per
NBO 9.1, Page No.
Providing TMT Bar FE 415 reinforcement for
R.C.C. work including bending, binding and placing
10 1005.00 in position complete upto floor two level. Building 66.59 Kg
SOR 2023-24, Iteam Code 05014BA, Iteam No. As
Per NBO 5.4.11, Page No.
P/A Trimix with dewatering machine and floater
machine on constructed RCC work incl.cost of
machine and labour etc comp as directed. (RCC
Making 15 mm groove in RCC work on road and
filling it with polysulfied selant and finished it good
incl.all labour charges etc comp as directed. (RCC
Labour work for fixing interlocking blocks / any kind
of pavement on up to 50 mm thick sand bedding,
13 50.00 levelling, watering and fixing in line & level as well 69.64 Smt
cleaning the site etc. comp. as directed (AMC
Providing and Laying of Rubber Moulded Paver
Block Grey/Coloured 60 mm thick, M-35 Grade of
any size ; shape (Usually Uni-Paver Blocks) using
black trap good quality aggragate of 20 mm
nominal size for footpath, parking areas, service
lanes and other areas as mentioned in the
drawing/instruction of engineer in charge. Cost
includes formworks using rubber mould, Rate
providing and laying paver blocks as per required
grading and specification. The paver block shall be
mechanically compacted. The work of paving
blocks shall be executed in line and level by skill
mason of flooring work only. It should be laid in
such a way that the no cutting of the paver block to
be necessary. if cutting of paver block necessary
then it should be cut by machine only and carting.
The finished surface of the paver block shall have
resonably good, plain finished. Paver blocks shall
be compacted and shall be relaid if necessary.
Gravel or such type of materials shall not be
allowed for production. Laying on 50 mm thick
sand beddding. (Footpath Tender Rate)
Signature of Bidder Page 64 of
Supplying and fixing of 300 mm-L x 150 mm-B x
380 mm-H Kerb Block for Footpath in M-20 grade
using 20 mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-cast
blocks, reasonably exposed finish/ formwork,
mould with well equipped with vibratory system for
kerb stones of approved design including curing,
etc. complete, including the cost of formwork etc.
complete. The rate shall also include necessary
cutting of asphalt, fixing the Kerb stones in line and
15 50.00 level on 5 cm thick sand bedding with necessary 350.89 Rmt
equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of
the kerbstones. Filling of zari alone the sides of the
kerb stone fixed with Bituminous concrete mixed in
proper position as directed by Engineer in change
to form a portable mixture. In any case Gravel or
such type of materials shall not be allowed for
production. a) Laying on 5 cm thick Sand Bedding.
SOR - (Jan. -2016) for Central Verge / Footpath /
Repairing damaged M.H. and raising M.H. up to
road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster
16 0.00 in C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and
carting the same as directed. (Based on Drainage
SOR 2015-16) Item No.20
a 1.00 up to 0.15 mt. (@ Two Coarse)
b 10.00 up to 0.35 mt. (@ Four Coarse)
c 1.00 up to 0.65 mt. (@ Seven Coarse)
d 1.00 up to 0.90 mt. (@ Ten Coarse )
Repairing damaged I.C./Raising removing
damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and
17 10.10 fixing C.I. steps and existing chamber sheet cover,
removing the debris from chamber and carting the
same as directed. (Based on Drainage SOR 2015-
Providing F.R.C. MH seat cover incl. carting to the
18 0.00 work site etc. comp. Directed. (As per Central Store
Circular No.11/2022-23 Dt. 14.03.2023)
(SET cover and frame) F.R.C. Extra Heavy Duty
[EHD-35] Machinehole Covers & Frame - 560 mm
a 2.50 ø clear opening, The dimension of frame and cover No.
as per mentioned in Amend No. to IS 12592 :
(SET cover and frame) F.R.C. Heavy Duty [HD-20]
Machinehole Covers & Frames - 560 mm ø clear
b 3.00 opening, The dimension of frame and cover as per No.
mentioned in Amend No.1 to IS 12592 :2002 table
(SET cover and frame) F.R.C. Medium Duty [MD-
10] Machinehole Covers & Frames - 560 mm ø
c 8.00 clear opening, The dimension of frame and cover No.
as per mentioned in Amend No. 1 to IS
:2002 table 1 (SET cover and frame)
Signature of Bidder Page 65 of
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Machinehole Covers & Frames - 560 mm ø clear
d 8.00 opening, The dimension of frame and cover as per No.
mentioned in Amend No. 1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Medium Duty [MD-
10] Chamber Covers & Frame - 600 x 450 mm
e 8.00 clear opening, The dimension of frame and cover No.
as per mentioned in Amend No. 1 to IS 12592 :
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Chamber Cover & Frame - 600 x 450 mm clear
f 10.00 opening,The dimension of frame and cover as per No.
mentioned in Amend No. 1 to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Chamber Cover & Frame - 450 x 450 mm clear
g 5.00 opening,The dimension of frame and cover as per No.
mentioned in Amend No.1 to IS 12592 : 2002 table
Providing and fixing S.W. gully trap with C.I.
grating/brick masonry chamber and water tight C.I.
cover with frame of 300 mm x 300 mm size (inside)
19 30.00 with standard weight. (i) Square mouth traps. (A) Each
100 mm x 100 mm size P type (Based on Building
SOR 2023-24, Item No. 24006AA, NBO Item
Providing and supplying ISI marked only Standard
length Stoneware pipes in standard lengths of
following class and diameter including all taxes,
insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, -
conveyance to departmental stores, stacking etc.
(IS - 651 / 1989) (Based on GWSSB SOR 2022-23,
Item No. 11.0 P-17)
a 30.00 100 mm dia Rmt
b 8.00 150 mm dia Rmt
c 1.10 200 mm dia Rmt
d 5.00 230 mm dia Rmt
Lowering, laying and jointing Stone Ware pipes of
following diameters with cement joints in C. M. 1:1
proportion in proper position, grade and alignment
21 0.00 at all level as directed by Engineer-in-charge
including conveyance from stores to site of work,
Jointing material etc. comp. (Based on GWSSB
SOR 2022-23, Item No. 12; Page-40)
a 30.00 100 mm dia Rmt
b 8.00 150 mm dia Rmt
c 1.10 200 mm dia Rmt
d 5.00 230 mm dia Rmt
Signature of Bidder Page 66 of
Constructing Bombay Pattern Type Catch Pit of
size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick
maso. wall in the prop. of CM (1:6) with 40 mm
thick IPS flooring in the prop M15 at bottom and 15 3,110.80
mm thick cement plaster inside the catch pit in the
proportion of CM (1:3) with out jali etc. comp. as
directed. (AMC SOR)
CatchPit Jali Fixing P/F FRC catch pit jali with
23 5.00 frame 600mm x 600mm clear opening etc. comp.. 1377.64 No
As directed by engineer in charge. (R.A.)
Barricading the entire break down or excavated
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion &
movement including cautionary board etc. Item also
includes for making temporary sufficient nos of 80.36
lighting arrangement through out the work with
necessary required arrangement. The same shall
be removed after completion of work. (Only for
break down work from start to complete) (Based on
Drainage SOR 2015-16) Item No.29
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 67 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER NO.249.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .