Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.3 LAdmitted-Fee/PreQual/Technical/Finance WARD NO 59 GARAGE CHHAKA BBSR DIST KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹33.8 L+₹1.5 L (4.59%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹35.9 L+₹3.6 L (11.1%)Admitted-Fee/PreQual/Technical/Finance AT KENTAL PS KISHORENAGAR DIST CUTTACK | CUTTACK | ODISHA | 752120 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹35.9 L+₹3.6 L (11.1%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹38.0 L+₹5.7 L (17.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹42.2 L
EMD Value
₹42,216
Closing Date
30 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, NIMAPARA
Infrastructural Development of Banishree College Building at Khelar for the year 2025-26
2026_CERWI_136943_1
Tender Online-Divn.NPR-08/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Nimapara
2 documents required · 2 mandatory
₹6,000
₹42,216
Yes
4 Aug 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
30 Jul 2026
23 Jul 2026
23 Jul 2026 - 30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fly Ash Brick Work in C.M (1:6) using Fly Ash Bricks of approved quality in superstructure including providing key bricks, splays cutting, circular moulding, champering, chiselling including watering, curing with cost , conveyance , royalty taxes of all materials, labour and T&P articles required for the work etc. complete in all respect as per direction of the Engineer in charge. (First Floor) | 82.34 | cum | 6,296.19 | ₹5,18,428.28 |
| 2 | R.C.C.Work of M-20 nominal mix (1:1/2:3) using 20mm & 10mm H.G stone aggregate with approved quality from approved quarry for cement concrete including centring & shuttering work cost of all materials, labour T&P required for the work with royality etc. Complete in all respect as per direction of the Engineer in charge. (First Floor Column & Roof Beam) | 39.24 | cum | 18,414.99 | ₹7,22,604.21 |
| 2.01 | Lintal | 1.31 | cum | 15,907.75 | ₹20,839.15 |
| 2.02 | Chajja | 43.88 | cum | 1,350.9 | ₹59,277.49 |
| 2.03 | Roof Slab | 48.68 | cum | 15,981.73 | ₹7,77,990.62 |
| 2.04 | Stair Case | 3.74 | cum | 17,873.12 | ₹66,845.47 |
| 3 | Providing & Supplying of TMT bars confirming to grade Fe - 500D cutting bending, binding, lapping, splicing, welding etc. (conforming to IS 1786/1985 specification & jointing if necessary by lapping & tying the grills & placing in position as required for RCC works as per the approved design, hoisting, lowering & laying in position including cost & conveyance of tor steel & binding wires of 18 to 20 gauge(as to be approved by the Deptt.) etc. complete (weight of binding wire shall not be considered for payment at all which will be borne by the contractor ) standard CO-efficient of different sizes of the steel shall be considered & welding & lapping should confirm to relevant clause of IRC-21/1987 as per direction of the Engineer in charge. (First Floor) | 115.42 | qtl | 8,073.58 | ₹9,31,852.6 |
| 4 | 12 mm thick Cement Plaster in C.M. (1 : 6 ) using good coarse river Sand of approved quality finished smooth over Brick Masonary after racking out joints including watering, curing with cost , conveyance , royalty taxes of materials all labour and T&P articles required for the work etc. complete in all respect as per direction of the Engineer in charge. (First Floor) | 801.77 | sqm | 200.89 | ₹1,61,067.58 |
| 5 | 16 mm thick Cement Plaster in C.M. (1 : 6 ) using good coarse river Sand of approved quality finished smooth over Brick Masonary after racking out joints including watering, curing with cost , conveyance , royalty taxes of materials all labour and T&P articles required for the work etc. complete in all respect as per direction of the Engineer in charge. (First Floor) | 543.52 | sqm | 286.02 | ₹1,55,457.59 |
| 6 | Supplying fitting & fixing of M.S Iron door & windows with grills of approved design including cost of all materials, labour T&P required for the work etc. Complete in all respect as per direction of the Engineer in charge. (First Floor) | 4,816.8 | kg | 75 | ₹3,61,260 |
stage.html
html • 0.05 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.78 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_603104.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .