Executive Engineer City (R&B) Division, Rajkot
Construction of Compound Wall at Rajkot City (East), Rajkot-11, on Revenue Department Land Bearing Survey No.605, Plot No.17 and 99.
281848
22 of 2025-26 [22/7]
Open
Civil Works - Buildings
Works
Rajkot
4 documents required · 4 mandatory
₹900
Yes
Executive Engineer, City (R&B) Division, Rajkot.
₹7,300
Yes
28 Feb 2026
28 Feb 2026
28 Feb 2026
16 Mar 2026
28 Feb 2026
NAME OF WORK:- Construction of compound wall at Rajkot City (East), Rajkot–11, on Revenue Department land
bearing Survey No. 605, Plot No. 17 &
Item Quantity estimated Description of Item: Estimated Rate Unit: Total amout
No. which can be more according to
or less In Figures In Words Estimated
1 0.05 Hactor Clearing and grubbing road land 120904.16 Rs. One lakh Twenty Hactor
including uprooting rank vegetation thousand nine hundred
grass bushes,shrubs,sapling and trees four and Ps. Sixteen
girth up to 300 mm removal of stumps
of trees cut earlier and disposal of
unserviceable materials (B) By manual
in area of thorny jungle
Item Quantity estimated Description of Item: Estimated Rate Unit: Total amout
No. which can be more according to
or less In Figures In Words Estimated
2 45.00 Cum. Excavation for foundation upto 1.5 m 281.73 Rs. Two hundred eighty Cum.
depth including sorting out and stacking one and Ps. Seventy
of useful materials and disposing off the Three only
excavated stuff with all lead and lift as
directed. (C) Hard Murrum
3 12.00 Cum. Providing and laying cement concrete 3065.41 Rs. Three thousand Sixty Cum.
1:3:6 (1-Cement : 3 coarse sand : 6- five and Ps. Forty one only
hand broken stone aggregates
mmnominal size) and curing complete
excluding cost of formwork in (A)
Foundation and Plinth
4 66.00 Cum. Brick work using common burnt clay 4376.38 Rs. Four thousand three Cum.
building bricks having crushing strength hundred seventy and Ps.
not less than 35 kg./Sq.Cm. in Thirty eight only
foundation and plinth in Cement Mortar
1:5. (1- Cement : 5 -fine sand)(B)
5 5.00 Cum. Providing and laying cement concrete 4115.74 Rs. Four thousand one Cum.
1:3:6 (1- Cement : 3 Coarse sand : 6- hundred fifteen and Ps.
crushed stone aggregates 20 mm Seventy four only
nominal size) and curing complete
including cost of formwork in (A) Wall
Item Quantity estimated Description of Item: Estimated Rate Unit: Total amout
No. which can be more according to
or less In Figures In Words Estimated
6 399.00 Sqm. Providing 20mm thick cement plaster in 241.48 Rs. Two hundred forty one Sqm.
single coat on single or half brick walls and Ps. Forty eight only
for interior plastering upto floor two
level and finished even and smooth in (i)
Cement mortar 1:3 (1 cement:3-sand)
7 162.00 Rmt. Providing and fixing 1.20 metre high 388.19 Rs. Three hundred eighty Rmt.
barbed wire fencing over existing brick eight and Ps. Ninteen only
masonry wall using precast cement
concrete posts of section 100 mm ×
mm, 1.52 metre long, fixed at
metre centre to centre, including fixing
the PCC posts within concrete pedestals
provided separately, true to line and
plumb, and securing the same with
cement mortar / concrete as directed,
including five horizontal lines and two
diagonal lines of galvanised steel barbed
wire weighing 9.38 kg per 100 metre,
properly strained and fixed to PCC posts
with G.I. binding wire / staples,
including cutting, bending, straining,
curing, tools, plant, labour, lead and lift,
complete as directed by the Engineer-in-
Item Quantity estimated Description of Item: Estimated Rate Unit: Total amout
No. which can be more according to
or less In Figures In Words Estimated
8 752.00 Kg. Providing and fixing M.S. openable 249.55 Rs. Two hundred forty nine Kg.
gates of required pattern including M.S. and Ps. Fifty five only
columns on both sides, using M.S. flats,
square or round bars with necessary
frames, all fixtures, fastenings, and
required arrangements for closing as per
design and instructions of the Engineer-
in-charge; including preparing the
surface by thoroughly cleaning oil,
grease, dirt, and foreign matter using
steel brushes, scrapers, and sandpaper,
applying a priming coat of ready-mixed
red lead paint, and finishing with two
coats of enamel paint applied by
brushing to provide an even shade.
Item Quantity estimated Description of Item: Estimated Rate Unit: Total amout
No. which can be more according to
or less In Figures In Words Estimated
9 2.00 No. Providing and fixing an information 8888.00 Rs. Eight thousand eight No.
board/notice board of size 90 cm x 60 hundred eighty eight only
cm, fabricated from M.S. plate and M.S.
frame as per the design and instructions
of the Engineer-in-charge; including the
writing of content provided by the
concern office and all necessary
arrangements for fixing on-site;
including preparing the metal surface by
thoroughly cleaning oil, grease, dirt, and
foreign matter using steel brushes,
scrapers, and sandpaper; applying a
priming coat of ready-mixed red lead
paint and finishing with two coats of
enamel paint applied by brushing to
provide an even shade.
Rs. in words Rs. Seven lacs, Twenty Nine thousand, Six hundred Two and Ps. Sixty Six only)
Item Quantity estimated Description of Item: Estimated Rate Unit: Total amout
No. which can be more according to
or less In Figures In Words Estimated
I/we am / are willing to carry out the work at ______________ Above/below the estimated rates (percentage should be written in words and
figures % above / below) the estimated rates as mentioned above. Amount of My / Our tender
works out as under
1) Estimated amount put to Tender: : Rs. ________________ 1) Estimated amount put to Tender : Rs. ____________
3) Net Amount of Tender Rs. _________________ 3) Total Amount of Tender Rs. .
3) Net Amount of Tender Rs. _________________ 3) Total Amount of Tender Rs. .
4) In words Rs. 4) In words Rs.
Signature of contractor Deputy Executive Engineer,
Police Campus (R&B) Sub-Dn.
Item Quantity estimated Description of Item: Estimated Rate Unit: Total amout
No. which can be more according to
or less In Figures In Words Estimated
[1] All work shall be carried out as per Public works Deptt. Hand Book and other I.S.specification and other Specification of the Division or as directed.
[2] All the columns in schedule should be filled in INK and total of entires in the last column should be struk by the contractor under his signature.
[3] Rates quoted include clearance of site (Prior commence of work and as its colser) in all respected and hold good for work under all conditions, site
moisture weather etc.
[4] The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6/32772/N Dtd. 26-04-1978 and as per
G.R. No. TNC/9/24/C Dtd. 18-11-91 as directed by the Engineer-in-Charge of the work on board at site of work which contractor is not entitle for any
[5] Testing of materials be as per statement attached with Specifications, the materials shall be tested. Bill for testing shall be paid by the Deptt., and 1% of
the (one Percent) of amount put to tender after deducting the cost of materials as per Schedule-A shall be deducted from the Running Account Bills of
the work (As per G.R. R & B Deptt. No. INC/1095/4/C Dtd. 20-12-91.
[6] The Contractor shall quote even "NIL" if no reduction is proposal.
Item Quantity estimated Description of Item: Estimated Rate Unit: Total amout
No. which can be more according to
or less In Figures In Words Estimated
[7] In item of M.S.S. where there is change in Bituminous content for mixing as per actual mix design, the difference of asphalt consumption shall be
deducted from tendered rate of original item at the rate of stare rate mentioned in the tender.
[8] The Govt. of India have implemented G.S.T. from Date 1/7/2017 as such contractors are advised to consider the
Provision of deduction of G.S.T. from the bills and they are advised to quote their rates accordingly. The Deptt. will not
take any responsiblity of such tax or no addnl. amount shall be paid for the same
[9] As per modification in Clause 14 of this tender, the Govt. vide Rso. dated 11.7.17 has modified the same as under [i]
Excess upto 10% at Tender Rates [ii] Excess More than 10% at either tender rates or estimated rates which ever is
lass. The contractors are advised to quote their rates accordingly considering above modifications
Signature of contractor Deputy Executive Engineer,
Police Campus (R&B) Sub-Dn.
Prepared by Dev Mediator/Rajkot JANU_26__Comp wall_Revenue_Dobaria Sir
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
0.0 TENDER ONLINE NIVIDA No.22 2025-26.pdf
1.0 ONLINE_NOTICE Compound Wall 605_17_99.pdf
2.0 SBD Compound Wall 605_17_99.pdf
3.0 Paripatro.pdf
3.1 Govt Resolution_compressed.pdf
4.0 SchB Compound Wall 605_17_99.pdf
5.0 MaterialTest Compound Wall 605_17_99.pdf
6.0 SpIndex Compound Wall 605_17_99.pdf
6.1 BuildingSpecificationBooklet_NEW.pdf
7.0 Specification Compound Wall 605_17_99.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .