Superintending Engineer
Superintending Engineer, KWA, PH Circle, Kalmandapam Palakkad
Jal Jeevan Mission CWSS to Kanjirapuzha, Thachampara Karakurussi additional work Providing distribution system to uncovered areas and LSGD road restoration works in Thachampara grama panchayath.
2023_KWA_627305_1
46/23-24/SE/PHC/PKD
Open Tender
Civil Works - Water Works
Item Rate
240 days
Thachampara
As per NIT
7 documents required · 7 mandatory
₹8,270
₹1 L
5 Feb 2024
1 Dec 2023
16 Dec 2023
1 Dec 2023
15 Dec 2023
1 Dec 2023
1 Dec 2023 - 15 Dec 2023
Amount
SUPPLYING AND LAYING DISTRIBUTION SYSTEM (A) - COST OF MATERIALS
100.98.223:Supply of PVC Pipe, 8kg/cm2, 90mm Dia.
100.98.236:Supply of PVC Pipe, 10kg/cm2, 90mm Dia.
OD213274/2023-2024:Supply and providing PVC pipe specials such as bends, elbow, reducers, couplings etc. suitable for 90mm PVC 10kg/cm2 - 3% of cost of pipe
OD213275/2023-2024:Supply and providing PVC pipe specials such as bends, elbow, reducers, couplings etc. suitable for 90mm PVC 8kg/cm2 - 3% of cost of pipe
100.98.457:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.
100.98.440:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm.
SUPPLYING AND LAYING DISTRIBUTION SYSTEM (B) - WORKING CHARGES
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
100.1.9:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock Requiring Blasting.
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
18.12.8:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore
OD204232/2023-2024:Demolishing Concrete work in Road work manually / by mechanical means and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.31.2.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class II.
100.41.39:Supply, stacking, spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading, unloading & stacking up to any lead.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock
2.7.3:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited)
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
OD204231/2023-2024:Providing and fixing 200mm dia or nearest size protection tube/AC pipe bit or PVC pipe bit for a length of 1.50m long for protection tube to the below 150mm valve and Air valve in the pipe line /distribution system
OD204456/2023-2024:Interlinking of GI line(both ends) with existing PVC line using all necessary specials including earth work excavation,joining using approved specials of both PVC and GI and backfilling -all work complete as per direction of departmental officers.
OD204227/2023-2024:Interlinking the extensions with existing 160mm/140mm/110mm/90mm/75mm/63mm/50mm/40mm PVC lines or DI Lines using suitable specials including the cost of labour but excluding the cost of valves - For 90mm line
100.60.8.2:Replacing the chocked / damaged 20mm (3/4 inch) house connection with 20mm (3/4 inch) water meter from existing mains, up to a length of 5m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / Brass specials viz. brass ferrule, Elbow, MTA, FTA, couplers etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, safely removing & re-fixing existing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges but excluding cost of water meter and meter box and excluding charges for cutting the concrete / tarred / bituminous roads and as per the directions of the department officers.
OD204226/2023-2024:Rectification of existing water service connection damaged during the course of work and shifting existing connections from the old lines all material cost and labour etc.
18.12.2:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work20 mm dia nominal bore
18.12.5:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work40 mm dia nominal bore
100.32.1:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 25mm Single Acting Air Valve.
LSGD ROAD RESTORATION WORKS CC ROAD
OD204275/2023-2024:Excavation in Marshy Soil Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.6. - As per item number 3.6 of MORD Road
16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
LSGD ROAD RESTORATION WORKS (BT ROADS)
3.6:Excavation in Marshy Soil <br> Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.6.
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
5.1.1a:Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
5.2.3a:Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.9.1.2a:20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 <br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br> Case - I By Manual Means <br> (II) Bitumen (S-65)
5.12.A.3.2a:Seal Coat - Manual Means - Type C - Bitumen S-65 <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means :- Case - III : Type C <br> (II) Bitumen (S-65)
jeshil.p
Bidder Name
jeshil.p
KOTTAYIL INFRASTRUCTURE ENGINEERING AND CONSTRUCTIONS LLP
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_946653.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .