| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Finance | -37.77% | ₹12.5 L | L1 | Admitted-Finance |
| 2 | L2₹13.0 LAdmitted-Finance | -35.00% | ₹13.0 L | L2 | Admitted-Finance |
| 3 | L3₹16.2 LAdmitted-Finance | -19.11% | ₹16.2 L | L3 | Admitted-Finance |
| 4 | L4₹17.8 LAdmitted-Finance | -11.00% | ₹17.8 L | L4 | Admitted-Finance |
| 5 | L5₹19.0 LAdmitted-Finance | -5.00% | ₹19.0 L | L5 | Admitted-Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
15 Jun 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFFICE OF THE EXECUTIVE ENGINEER REW RAJOURI
REFER TO BOQ
2026_RDPR_311772_2
e-NIT No. 09 REW Rajouri of 2026-27 Dated 08-06-2026 (re-tender)
Open Tender
Civil Works
Percentage
jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
OFFFICE OF THE EXECUTIVE ENGINEER REW RAJOURI
₹40,000
Yes
27 Jun 2026
8 Jun 2026
16 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling avialable earth in trench plinth side of foundation | 11.6 | Cum | 218.4 | ₹2,533.44 |
| 2 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil. | 29.01 | Cum | 479.3 | ₹13,904.49 |
| 3 | Cost in situ C.Conc. Of specified grades excluding cost of shuttering in C.conc. M5 Grade using 40mm stone agg. | 12.05 | Cum | 4,826.5 | ₹58,159.33 |
| 4 | Cost in situ C.Conc. Of specified grades excluding cost of shuttering in C.conc. C.conc.M10 Grade,using 20mm stone agg.. | 15.75 | Cum | 5,733.6 | ₹90,304.2 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.01 | Cum | 7,788.4 | ₹31,231.48 |
| 6 | Reinforced cement concrete work in wall including attached pilaster, butresses plinth and string courses fillets ,piers,abuttement upto floor five level including curing but exculding cost of centering finishing and reinforcement 1:1.5:3 mix | 4.08 | Cum | 9,395.7 | ₹38,334.46 |
| 7 | Reiinforced cement concrete work in beam, suspended floor ,roofs exculding the cost of centering shutering 1:1.5:3 mix | 25.38 | cum | 9,821.9 | ₹2,49,279.82 |
| 8 | centering and shuteringand removal of form work for foundation footing base of column etc for mass concrete | 96.66 | sqm | 286.35 | ₹27,678.59 |
| 9 | centering and shuteringand removal of form work for coumns ,pillars piers | 62.73 | sqm | 742.55 | ₹46,580.16 |
| 10 | centering and shuteringand removal of form work for suspended floor ,roofs | 148.58 | sqm | 718.2 | ₹1,06,710.16 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_1009328.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].