Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC MOONIDIH COLLIERY CIL | ₹5.9 L Quoted ₹4.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.6 L+₹6,766.81 (1.49%)Rejected-AOC MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | ₹4.6 L+₹6,766.81 (1.49%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.7 L+₹13,444.59 (2.96%)Rejected-AOC COAL INDIA LIMITED | ₹4.7 L+₹13,444.59 (2.96%) | L3 | Rejected-AOC L3 |
Tender Value
₹4.5 L
EMD Value
₹5,565
Closing Date
2 Mar 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Transportation of belt structure,resistance boxes and miscallaneous items in Moonidih Collery,W.J.Area
2026_BCCL_353813_1
BCCL/WJA/MND/SUR/2025-26/109
Open Tender
Miscellaneous Works
Percentage
12 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹5,565
16 Apr 2026
20 Feb 2026
3 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
Transportation of belt structure,resistance boxes and miscallaneous items in Moonidih Collery,W.J.Area
Transportation of 50 no. of 1200mm brackets from 7th D/R near D-17 B/G to 9th D/R Jn. of D-18 B/G Via Track & Haulages(including lowering of empty trolly, loading,hoisting & unloading) Analysis:No. of Arm trolleys Required=3 manshift required/Trolley =6 unskilled/shift For 2 shifts. cost involved =Rs1402.6/unskilled=(6 x Rs 1402.6 x 2)=Rs 16831.2/Arm trolley
Transportation of 3 no. of Resistance Boxes,light fittings & cables from 8th D/R in D-17 B/G to 7th D/R Jn. of 400mh main line Via Track & Haulages(including lowering of empty trolley,manually transporting of resistance boxes, loading,hoisting) Analysis:No. of Arm trolleys Required=3 manshift required/Trolley =6 unskilled/shift For 3 shifts. cost involved =Rs1402.6/unskilled=(6 x Rs 1402.6 x 3)=Rs25246.8/Arm trolley
Transportation of Channels,Top rollers &bottom rollers &leg posts in 6 arm trollies from 7th D/R Jn. of 400MH main line to D-18 B/G,9th D/R jn.through track & Haulages & unloading. Analysis:No. of Arm trolleys Required=6 manshift required/Trolley =6 unskilled/shift cost involved =Rs1402.6/unskilled=(6 x Rs 1402.6)=Rs 8415.6/Arm trolley
Manual Transportation of 150m,1200mm belt structure from 9th D/R Jn. Of D-18 B/G to 10th D/R between D-19 B/G to D-19 T/G and Laying &Fitting in 10th D/R. Analysis:For 6m of belt strucure i.e.(2 leg posts,4 channels,6 top rollers,1 bottom roller),Manshift required=6 unskilled/Shift. cost involved =Rs1402.6/unskilled=(6 x Rs 1402.6)=Rs 8415.6/6m=Rs 1402.6/m
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
techsummary_366628.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_366628.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .