| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.3 LAccepted-AOC | 1 | Accepted-AOC ACCEPTED BEING L-1 | |
| 2 | 2₹16.4 L+₹3.0 L (22.7%)Rejected-AOC | 2 | Rejected-AOC REJECTED NOT BEING L-1 | |
| 3 | 3₹25.5 L+₹12.1 L (90.2%)Rejected-AOC | 3 | Rejected-AOC REJECTED NOT BEING L-1 |
| Sl No | Description | Qty | Unit | M/s Thakur Engineers L1 | ASHOK KUMAR JAIN L3 | M/S vp sharma L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in post holes (or similar holes) each not exc. 0.50 cum, soft/loose soil and getting out, returning filling in and ramming earth or broken rubble mixed with earth around in layers not exc. 25cm, watering and removal of excavated materials to a distance n. exc. 50m and making good surfaces, complete all as specified & directed. | 40 | Each | 70 ₹2,800 Lowest | 150 ₹6,000 | 250 ₹10,000 |
| 2.00 | Repair to pot holes any depth not exc. 1 Sqm each including sweeping free from dust and mud or water, scoring sunken surfaces in roads, path etc. cutting around edges to at least 25mm in depth, making good by applying tack coat @ 5 Kg/10 Sqm, putting in premixed bituminous premix semi dense asphaltic concrete 40mm consolidated thickness with 5.5% binder content by weight of total mix using 20mm crushed stone aggregate rolled and compacted to required camber and gradient with 8 to 10 tonne power roller for depth of pot holes exceeding 30mm complete all as specified and directed. | 3 | 10 Sqm | 1,000 ₹3,000 Lowest | 2,200 ₹6,600 | 6,000 ₹18,000 |
| 3.00 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces, depth exceeding 50mm but not exceeding 100mm deep and area not exceeding 400sqm complete all as specified. all as specified and directed. | 7.5 | 10 Sqm | 300 ₹2,250 | 280 ₹2,100 | 175 ₹1,312.5 Lowest |
| 4.00 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces, depth not exceeding 50mm and area not exceeding 400sqm complete all as specified. all as specified and directed. | 5 | 10 Sqm | 400 ₹2,000 | 280 ₹1,400 | 100 ₹500 Lowest |
| 5.00 | 7.5cm thick (compacted thickness) WBM, with coarse aggregates of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), spread, rolled and consolidated to gradient and camber required using Granite, trap or bassalt and rolled with 10 to 12 tonnes power roller to required gradient and camber, complete all as specified. | 7.5 | 10 Sqm | 1,400 ₹10,500 Lowest | 1,970 ₹14,775 | 2,500 ₹18,750 |
| 6.00 | Providing premix bituminous macadam (consolidated thickness 75mm or less) with 4% binder content of paving bitumen by weight of total mix, rolled and compacted to required camber and gradient with 8 to 10 tonne power roller, complete all as specified and directed. Note:- Bituminous macadam shall be mixed in hot mix plant, transported and shall be laid in single layer with self propelled mechanical paver, rolled with vibrator roller., complete all as specified. | 2.5 | Cum | 9,000 ₹22,500 Lowest | 12,500 ₹31,250 | 12,000 ₹30,000 |
| 7.00 | Preparing unsurfaced water bound macadam surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally the cleaned surfaces with power sweeper or compressor to remove all loose dirt etc, applying evenly a priming/ tack coat with bituminous primer using paving bitumen @ 10 kg per 10 sq metre of road surface, laying bituminous premix semi dense asphaltic concrete 40mm consolidated thickness with 5.5% bitumen binder content by weight of total mix using 20mm crushed stone aggregate, rolled and compacted to required camber and gradient with 8 to 10 tonne vibrator power roller, complete all as specified and directed. Note:- Bituminous premix semi dense asphaltic concrete shall be mixed in automatic temperature controlled hot mixing plant, transported and premix carpet shall be laid in single layer with self propelled mechanical paver, rolled with vibrator roller. | 7.5 | 10 Sqm | 4,000 ₹30,000 Lowest | 6,500 ₹48,750 | 7,000 ₹52,500 |
| 8.00 | Preparing black top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surfaces with power sweeper or compressor to remove all loose dirt etc., applying evenly a priming/ tack coat with bituminous primer using paving bitumen at 5 kg per 10 sq metre of road surface, laying bituminous premix semi dense asphaltic concrete 40mm consolidated thickness with 5.5% bitumen binder content by weight of total mix using 20mm crushed stone aggregate, rolled and compacted to required camber and gradient with 8 to 10 tonne vibrator power roller, complete all as specified and directed. Note:- Bituminous premix semi dense asphaltic concrete shall be mixed in automatic temperature controlled hot mixing plant, transported and premix carpet shall be laid in single layer with self propelled mechanical paver, rolled with vibrator roller. | 205 | 10 Sqm | 4,950 ₹10,14,750 Lowest | 7,850 ₹16,09,250 | 6,200 ₹12,71,000 |
| 9.00 | Supply and fixed in repair cat eye reflective type of metal body alloy of size 100mm x 100mm x 20mm with PAMA striplens reflector of model No. DA 972.0 fixed with and including MS stud of suitable size as per manufactures instructions complete all as specified and as directed. | 100 | Each | 400 ₹40,000 Lowest | 950 ₹95,000 | 600 ₹60,000 |
| 10.00 | Solar cat eye aluminum alloy shall (100% water proofing design according to 65) of size 125mm x 125mm x 25mm (shank 65mm) of high efficiency Mono rystafie solar panel 2.4V/ 0.3 watt one NI-ed rechargeable battery (1.2V/ 1600MA) consisting of super bright LED with 10,000 to 18,000 mcd completed as per manufactures instructions etc. all as specified and directed. | 20 | Each | 1,600 ₹32,000 Lowest | 2,750 ₹55,000 | 2,000 ₹40,000 |
Tender Value
₹14.5 L
EMD Value
₹29,000
Closing Date
30 Sept 2025, 6:00 pmClosed
CWE YOL
HEADQUARTERS COMMANDER WORKS ENGINEER YOL
SPECIAL REPAIR TO ROAD AND ALLIED SERVICES AT MIL STATION DHARAMSHALA UNDER GE PALAMPUR
2025_MES_709312_4
CWE/Y-35/2025-26
Open Tender
Civil Works - Roads
Item Rate
180 days
DHARAMSHALA
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE PALAMPUR
₹29,000
Yes
25 Oct 2025
8 Sept 2025
3 Oct 2025
8 Sept 2025
30 Sept 2025
18 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .