Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹9.2 L+₹11,725.79 (1.29%)Rejected-AOC HIMAHIRANS POCHAKONAM EZHUKONE PO KOLLAM | ₹9.2 L+₹11,725.79 (1.29%) | L2 | Rejected-AOC L2 Bidder |
| 3 | L3₹10.7 L+₹1.6 L (18.0%)Rejected-AOC | ₹10.7 L+₹1.6 L (18.0%) | L3 | Rejected-AOC L3 bidder |
| Sl No | Description | Qty | Unit | Hiran mohan L2 | SHAJAHAN,KOORIPOIKAYIL L3 | JESEENA BEEVI L1 |
|---|---|---|---|---|---|---|
| 1.00Jungle Clearing | ||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 29,214 | sqm | 17.19 ₹5,02,188.66 | 21.68 ₹6,33,359.52 | 16.9 ₹4,93,716.6 Lowest |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 11,978.1 | sqm | 8.76 ₹1,04,928.16 | 10 ₹1,19,781 | 8.5 ₹1,01,813.85 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 101.25 | cum | 243.46 ₹24,650.33 | 250 ₹25,312.5 | 239 ₹24,198.75 Lowest |
| 2.00Removal of floating bodies | ||||||
| 2.00 | OD13731/2025-2026:Engaging man mazdoor(coolie) for removing floating materials and other vegetation from
canals and removing deposited silt from canal bed to avoid overflow of water, construction of
temporary bunds across canal for control and regulate the flow of water to minors and for
greasing, oiling and operation of various shutters etc. complete during water distribution period
as per the directions of departmental officers at site | 280 | Day | 1,022.66 ₹2,86,344.8 Lowest | 1,040 ₹2,91,200 | 1,024 ₹2,86,720 |
| 2.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 8 | each | 356.88 ₹2,855.04 | 360 ₹2,880 | 349 ₹2,792 Lowest |
Tender Value
₹9.7 L
EMD Value
₹24,364
Closing Date
21 Oct 2025, 4:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer KIP LB Subdivision No 13 Kollam
Annual Maintenance of Canals 2025 26 Clearing jungle in KBC from Ch 12650 to 21725 Attuvassery Mylamkulam Thenguvila Thazhathukulakkada and Removal of floating bodies from KBCl from Ch.4000m to 21725m Cherumanadu etc
2025_Irrig_807094_1
IRR/PII/TR/2456/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
330 days
Puthoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,150
₹24,364
5 Nov 2025
8 Oct 2025
22 Oct 2025
8 Oct 2025
21 Oct 2025
8 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1344965.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1344965.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.92 MB
Corigendum.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .