| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical accept |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
12 Aug 2026, 6:55 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA KEKRI
Construction of Roadways Depo or Jan Awas ke approach road per protection wall works at kekri
2026_DLB_585265_2
15/20256-27
Open Tender
Miscellaneous Services
Percentage
365 days
service
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
EXECUTIVE OFFICER
₹4.3 L
Yes
16 Aug 2026
10 Aug 2026
13 Aug 2026
10 Aug 2026
12 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including
dressing of sides and ramming of bottoms, including getting out the
excavated material, refilling after laying pipe/ foundation and
disposal of surplus excavated material at a lead upto 50m suitable
site as per direction of Engineer for following depths, below natural
ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc | 1,380 | P.Cum | 229.5 | ₹3,16,710 |
| 2 | Carriage of Materials bymechanical transport including loading, unloading and stacking:: Earth For 1 Km same as item 1 | 1,380 | P.Cum | 161.51 | ₹2,22,883.8 |
| 3 | Random Rubble dry stone Kharanja (soling) under Floor. | 388.8 | P.Sqm | 2,270 | ₹8,82,576 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering All work upto plinth level :1:4:8 (1 Cement: 4 fine/coarse sand: 8 graded stone aggregate 40 mm nominal size). | 132 | P.Cum | 4,575 | ₹6,03,900 |
| 5 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1,328.4 | P.Cum | 5,910 | ₹78,50,844 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories
( each story of height upto 3.5 metre from floor level) including
strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete. | 2,952 | P.Sqm | 236.5 | ₹6,98,148 |
| 7 | Construction of embankment with approved material obtained from
borrow pit with all lifts and leads, transporting to site, spreading,
grading to required slope and compacting by vibratory roller 8-10
tonne to meet requirement of table 300-2 including cost of
compensation for earth taken from private land complete as per
MoRT&H specification clause 305. (Lead taken upto 5 km) | 30,000 | P.cum | 178.5 | ₹53,55,000 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level. | 52,139.7 | P.kg | 104 | ₹54,22,528.8 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_1039796.xls
BOQ • 0.34 MB
corinit15.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .