| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance 201 3RD FLOOR A BLOCK SRI GURU TOWERS 80 FEET ROAD ANNA NAGAR MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CMK Projects Private Ltd., L1 | V SATHYAMOORTHY CO L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. Upto 2.40m Depth. | 1,632 | m3 | 200 ₹3.3 L | 210 ₹3.4 L |
| 2.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 122 | m3 | 1,860 ₹2.3 L | 1,900 ₹2.3 L |
| 3.00 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 122 | m3 | 5,520 ₹6.7 L | 5,650 ₹6.9 L |
| 4.00Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | |||||
| 4.01 | For Basement level | 409 | Qtl | 9,480 ₹38.8 L | 9,700 ₹39.7 L |
| 4.02 | For above Basement level | 376 | Qtl | 9,700 ₹36.5 L | 9,900 ₹37.2 L |
| 5.00 | Vibrated Reinforced Cement Concrete M30 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for MAT CONCRETE | 314 | m3 | 9,500 ₹29.8 L | 9,750 ₹30.6 L |
| 6.00 | Vibrated Reinforced Cement Concrete M30 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for SIDE WALL | 376 | m3 | 14,040 ₹52.8 L | 14,400 ₹54.1 L |
| 7.00 | Supplying and Fixing inposition of 110mm dia PVC Pipe 6kg/cm² for Veep Holes in Retaining wall etc.,complete as per std.specification | 48 | Rm | 200 ₹9,600 | 210 ₹10,080 |
| 8.00 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 351 | m2 | 280 ₹98,280 | 290 ₹1.0 L |
Updated dates
Tender Value
₹2.0 Cr
EMD Value
₹2.1 L
Closing Date
11 Feb 2026, 3:00 pmClosed
The Commissioner, Tiruchirappalli City Corporation
Bharathidasan Road, Cantonment, Trichy - 620 001
Extension of Retaining Wall for Maris ROB at Woraiyur side AND Main Guard Gate side in Trichirappalli City Corporation
2026_MAWS_649947_1
TN403/2025-26 SR NO.1
Open Tender
Civil Works
180 days
zone 1
REFER BID CONDITION
3 documents required · 3 mandatory
₹10,000
₹2.1 L
14 Mar 2026
2 Feb 2026
11 Feb 2026
2 Feb 2026
11 Feb 2026
2 Feb 2026
Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. Upto 2.40m Depth.
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
For Basement level
For above Basement level
Vibrated Reinforced Cement Concrete M30 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for MAT CONCRETE
Vibrated Reinforced Cement Concrete M30 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for SIDE WALL
Supplying and Fixing inposition of 110mm dia PVC Pipe 6kg/cm² for Veep Holes in Retaining wall etc.,complete as per std.specification
Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BidDoc_CGF.pdf
Tender Documents • 1.26 MB
BOQ_779285.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid