Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC BALURBANDH PO BALURBANDH TRIPURA WEST 799211 | BALURBANDH | WEST TRIPURA | TRIPURA | 799211 | ₹20.2 L Quoted ₹20.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.8 L+₹19,766.68 (0.96%)Rejected-AOC | ₹20.8 L+₹19,766.68 (0.96%) | L2 | Rejected-AOC L2 |
| 3 | L3₹20.9 L+₹34,591.69 (1.68%)Rejected-AOC SRIMANTAPUR RABINDRANAGAR SONAMURA SEPAHIJALA PIN 799181 | SONAMURA | SEPAHIJALA | TRIPURA | 799181 | ₹20.9 L+₹34,591.69 (1.68%) | L3 | Rejected-AOC L3 |
| 4 | Not Admitted-Fee/PreQual/Technical CCD 79 TILLA AGARTALA | WEST TRIPURA | TRIPURA | 799001 | - | - | Not Admitted-Fee/PreQual/Technical Others-Willingly Withdrawal |
Tender Value
₹19.8 L
EMD Value
₹39,535
Closing Date
20 Jul 2026, 4:00 pmClosed
EE, Agri. Engg, West Div-II
O/o The EE, Agri. Engg, West Div-II
Construction of boundary wall L 92.00 mtr including MS GrillGate and Guard wall 37.00 maround Hezamara IT building complex at Hezamara under Hezamara Agri. SubDivision. West Tripura District.
2026_AGRI_74587_1
48/EE/AGRI/WEST-II/2026-27
Open Tender
Civil Works
Percentage
Hezamara
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹39,535
27 Aug 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
13 Jul 2026 - 15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth Work : | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, liftupto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | - | cum | 231.6 | - |
| 1.02 | Filling available excavated earth (excluding rock) in trenches,plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
-All kinds of soil | 1 | cum | 161.3 | ₹161.14 |
| 1.03 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | cum | 1,177.3 | ₹1,176.12 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
a) 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | 1 | cum | 8,980 | ₹8,971.02 |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- | 1 | cum | 11,080.4 | ₹11,069.32 |
| 2 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- | - | cum | 10,461.4 | - |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcemen | 1 | cum | 12,591.1 | ₹12,578.51 |
| 4 | Centering shuttering including struttings, propping etc.and removal of form work for:
-Foundations, footings, bases for columns etc. for mass concrete with timber plank | 1 | sqm | 333.9 | ₹333.57 |
| 5 | Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply | 1 | sqm | 625.5 | ₹624.87 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
DNITHezamaraBoundary.pdf
Tender Documents • 3.12 MB
BOQ_75918.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .