Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.7 L+₹487.46 (0.04%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹11.7 L+₹2,928.26 (0.25%)Rejected-AOC KERALA KL | KANNUR | KERALA | 670511 | L3 | Rejected-AOC L3 |
Tender Value
₹13.4 L
EMD Value
₹20,087
Closing Date
4 Jan 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
Office of the Assistant Executive Engineer Roads Sub Division Perumbavoor
This estimates are earth work excavation pot hole filling levelling coarse and surface with 20 mm close graded premixed surfacing.
2021_PWD_463519_1
PWD/RB/TR/103922/2021_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
90 days
puthencurz
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹20,087
Yes
1 Jun 2022
28 Dec 2021
6 Jan 2022
28 Dec 2021
4 Jan 2022
28 Dec 2021
60 days
Amount
Appendix- A- Road work
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD64859/2021-2022:Providing laying and rolling of close graded premix surfacing material of 20 mm thickness composed of 11.2mm to 0.09 mm(type A)aggrigate using penetration grade bitumen to required line,grade and level to serve as a wearing course on a previously prepred base,including mixing in a suitable plant,laying and rolling with three wheel 8-10 KN static roller and finishing to required level and grade as per technical specification clouse 550 of MORTH
N A SUBAIR
SUNNY K M
Bidder Name
ALBERT CHERIAN
SUNNY K M
N A SUBAIR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .