Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.1 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹35.0 Cr−₹5.6 Cr (13.7%)Rejected-AOC 3RD FLOOR 33 509 A KURIEKKAL TOWER EDAPPALLY TOLL PARUTHELIPALAM KOCHI 6820204 | KOCHI | ERNAKULAM | KERALA | 682020 | L2 | Rejected-AOC L2 | |
| 3 | L3₹40.6 CrSame as L1Rejected-AOC KANNUR | KERALA | 670001 | L3 | Rejected-AOC L3 |
Tender Value
₹32.4 Cr
EMD Value
₹5 L
Closing Date
17 Nov 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE JBC Edappally
O/o Office of the Superintending Engineer Buildings Judicial Circle , Public Works Department
RCC framed struture
2025_PWD_818548_1
PWD/BLDG/TR/7419/2023_23_2_1/1
Open Tender
Civil Works - Buildings
Percentage
545 days
Thiruvananthapuram
As per SBD condition
17 documents required · 17 mandatory
₹19,518
₹5 L
Yes
online google meeting
18 Feb 2026
3 Nov 2025
20 Nov 2025
3 Nov 2025
17 Nov 2025
3 Nov 2025
3 Nov 2025 - 17 Nov 2025
7 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDING _SUB STRUCTURE_UPTO PLINTH LEVEL(Civil work) | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | 18.59 | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.6 | cum | 263.35 | ₹157.75 |
| 1.003 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 0.4 | cum | 133.93 | ₹53.44 |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.4 | cum | 8,109.18 | ₹3,243.67 |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 0.6 | sqm | 394.74 | ₹236.45 |
| 1.006 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 0.8 | sqm | 1,030.96 | ₹824.77 |
| 1.007 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 0.8 | sqm | 858.26 | ₹686.61 |
| 1.008 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.2 | sqm | 779.84 | ₹155.97 |
| 1.009 | OD38813/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-40 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 390 kg/ cum and additional cement is not payable. All work up to plinth level | 0.4 | cum | 11,675.99 | ₹4,670.4 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_1372020.xls
BOQ • 1.06 MB
2.pdf
Tender Documents • 4.23 MB
plan.pdf
Other Document • 3.31 MB
MOU.pdf
Additional Documents • 0.26 MB
Soil.pdf
Other Document • 4.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .