Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87,496Accepted-AOC VALLIKATTIL HOUSE MANGATTOOR KOLENCHERY | ERNAKULAM | KERALA | 680667 | L1 | Accepted-AOC l1 | |
| 2 | L2₹88,787.08+₹1,290.88 (1.48%)Rejected-AOC PAPPARIL H KADAYIRUPPU KOLENCHERY | ERNAKULAM | KERALA | 680667 | L2 | Rejected-AOC l2 |
| Sl No | Description | Qty | Unit | WILSON V VARKEY L1 | ELDO P V L2 |
|---|---|---|---|---|---|
| 1.00rectification | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 58.12 | cum | 254.02 ₹14,764.91 Lowest | 257.63 ₹14,974.74 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 0.9 | cum | 2,481.69 ₹2,233.52 Lowest | 2,516.93 ₹2,265.24 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 16.16 | sqm | 380.75 ₹6,154.06 Lowest | 386.16 ₹6,241.5 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 0.7 | cum | 8,381 ₹5,866.7 Lowest | 8,569.14 ₹5,998.4 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.24 | cum | 8,449.17 ₹44,239.85 Lowest | 8,569.14 ₹44,868.02 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 42 | sqm | 338.98 ₹14,237.16 Lowest | 343.79 ₹14,439.18 |
Tender Value
₹88,644
EMD Value
₹2,216
Closing Date
9 Oct 2025, 3:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
PVIP SUBDIVISION NO 7 KOLENCHERY
In this estimate provisions included are Earth work excavation , 136 concrete for side wall, lining , 9 mm plastering.
2025_Irrig_803031_1
IRR/PII/3021/2025-2026
Open Tender
Civil Works - Canal
Item Rate
180 days
PALLIKKARA
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹2,216
Yes
23 Dec 2025
27 Sept 2025
10 Oct 2025
27 Sept 2025
9 Oct 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1334907.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .