Tender Value
Refer Docs
Closing Date
22 Jun 2026, 11:30 amClosed
Single Packet
Normal Tender
No
Not Applicable
Total Value Wise
Lowest to Highest
Please see item details
Not Applicable
90 days
Expenditure
General
LP
3 conditions · 1 needing a document upload
A Qualifying Requirement of Tenderers - for "MIG- MAG Welding Plant" 1. The Tenderer shall provide satisfactory evidence, acceptable to the purchaser to show that he is a regular manufacturer and has adequate plant and manufacturing capacity. Following information and documents shall be submitted by tenderer. (a)Quality Assurance Plan. (b)ISO 9001 certificate (should be valid on the original date if closing of tender.) Welding Plant shall be in the scope of ISO certificate. (c)Information as per Annexure '1' & Annexure - '2' attached with special condition of tender shall be provided. 2.The Bidder/manufacturer must have supplied at least 100 no. Of same/similar machine in last 3 years (to be reckoned from the original date of closing of tender) against to any Railway organization/ Central Government Organization/ State Government Organization/PUS. Statement of past supplies along with, (i) purchase's name and (ii) address (iii) email address and (iv) phone/fax number of purchaser, (v) purchase order (PO), (Viii) quantity supplied ( with proof of supply), (ix) date of supply and (x) their commissioning date shall be submitted with the offer. Copies of Pos/Commissioning/performance certificate submitted shall also indicate the parameters/ specification of subject machine to prove same/similarity aspect of the machine as mentioned in para3 below; technical specification of the machine from the related document of the PO may be attached to supplement the PO in regard to the respective parameters of similarity aspect of the machine. Specification attached shall have linkages to the PO. 3.For the purpose of similarity, similar machine required under clause 2 means 'MIG-MAG and or MIG/MAG Synergic and/or MIG/MAG Synergic pulse' inverter-based Welding Plant of 400 A DC current rating of higher. 4.The tenderer shall, in their offer, submit performance certificate of the least 10 number of such machines (which are counted for the purpose of clause 2 above) supplied in the last 3 year and the machine covered by these certificates must have worked satisfactorily for at least one year from the date of commissioning as on the original date of tender). The certificate shall not be older than one year from the original date of closing of tender. The performance certificate issued after original date of closing of tender (in case where tender closing date has been extended) are also acceptable however the machine must have completed one year of satisfactory working after date of commissioning as on original date of closing of tender. The performance certificate submitted by the tenderer shall have been issued by the actual end user organization of the machine, with their clear signature and address there in whose premises the machine is installed and commissioned. Performance certificates should be as per Annexure A1.
B) All necessary information/document required for establishing reference requirement as per clause A (2) to A (4) above shall be submitted by the bidder along with original offer itself for establishing Linkage of documents/entities such as manufacturer/PO/Consignee/Supply/Installation/Commissioning/Performance Certificate of the machine. No further Clarification/Correspondence shall be sought/ entertained in this regard. In case, no information or incomplete information or illegible information is furnished by the bidder, their offer shall be summarily rejected. C) Non-compliance of following shall lead to summarily rejection of the offer and no correspondence in this regard will be entertained. a) There shall not be any deviation from the major parameters mentioned in clause 2.2.1 of section I of the technical specification.
Inspection by TPI agency.
10 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Certificate for Compliance of Rule 144 (xi) in the General Financial Rules (GFRs), 2017. "I /we have read the Orders regarding restrictions on procurement from a bidder of a country which shares a land border with India vide Order Ref. F. No. 6/18/2019-PPD dtd. 23.07.2020 (containing office Memorandum, order (Public Procurement No. 1) & Order (Public Procurement No. 2). Order Ref F. No. 6/18/2019-PPD dtd. 23.07.2020 (Order (Public Procurement No.3) issued by Joint Secretary (PPD), Department of Expenditure, Ministry of Finance, Gol and OM No. DPE/7(4)/2017-Fin. Part-I dtd. 30.07.2020 issued by the Director, Dept of Public Enterprises, Gol; " Note- 1- To comply bidders are also to certify either Certificate-A or Certificate-B as given under "Other Conditions" of this NIT. 2-Para No. 2.30 of Bid Documents may also be read in this regards.
2 locations across Uttar Pradesh · 7 Numbers · 14 Set total
Supply Installation & Commissioning of Machine (Welding Plant Unit) as per Technical Specification No. M/246/1/15/Spec/MIG-MAG/Weld. Plant (Rev.00)
40265177~NER
40265177
Open - Indigenous
Mixed (Goods/Service/AMC)
Uttar Pradesh
₹0
Exempted
22 Jun 2026
20 May 2026
9 items · 7 Numbers · 14 Set total
Cost of Basic Machine (Welding Plant Unit) as per Technical Specification No. M/246/1/15/Spec/MIG-MAG/Weld. Plant (Rev. 0 0). [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/M&P/MWS/IZN | Uttar Pradesh | 7.00 Numbers |
| Total | 7 Numbers | |
Cost of the concomitant accessories (as per clause 4.2.1 to 4.2.5 of Section I) and Any other accessory/equipment, which the manufacturer considers essential to make the machine fully operational, when installed and commissioned (as per Clause 4.2.6 of Section I ), of Technical Specification No. M/246/1/15/Spec/MIG-MAG/Weld. Plant (Rev. 00). [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/M&P/MWS/IZN | Uttar Pradesh | 7.00 Set |
| Total | 7 Set | |
Consumables as per clause 6 of section II of Technical Specification No. M/246/1/15/Spec/MIG-MAG/Weld. Plant (Rev. 00). [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/M&P/MWS/IZN | Uttar Pradesh | 7.00 Set |
| Total | 7 Set | |
Cost of Installation & Commissioning, etc. ]
Cost of Comprehensive AMC for 1st (First) years after expiry of warranty period as per terms & conditions laid down in claus e 17 of Section II and scope of work of preventive maintenance schedule to be done under CAMC, given in Annexure F of Technical Specific ation No. M/246/1/15/Spec/MIG-MAG/Weld. Plant (Rev. 00). [ Warranty Period: 2 years, AMC Period: 1 years, Rate of Discounting: 10 % ] ]
Cost of Comprehensive AMC for 2nd (Second) years after expiry of warranty period as per terms & conditions laid down in cl ause 17 of Section II and scope of work of preventive maintenance schedule to be done under CAMC, given in Annexure F of Technical Spe cification No. M/246/1/15/Spec/MIG-MAG/Weld. Plant (Rev. 00). [ Warranty Period: 2 years, AMC Period: 2 years, Rate of Discounting : 10 % ] ]
Cost of Comprehensive AMC for 3rd (Third) years after expiry of warranty period as per terms & conditions laid down in claus e 17 of Section II and scope of work of preventive maintenance schedule to be done under CAMC, given in Annexure F of Technical Specific ation No. M/246/1/15/Spec/MIG-MAG/Weld. Plant (Rev. 00). [ Warranty Period: 2 years, AMC Period: 3 years, Rate of Discounting: 10 % ] ]
Cost of Comprehensive AMC for 4th (Fourth) years after expiry of warranty period as per terms & conditions laid down in cla use 17 of Section II and scope of work of preventive maintenance schedule to be done under CAMC, given in Annexure F of Technical Speci fication No. M/246/1/15/Spec/MIG-MAG/Weld. Plant (Rev. 00). [ Warranty Period: 2 years, AMC Period: 4 years, Rate of Discounting: 10 % ] ]
Cost of Comprehensive AMC for 5th (Fifth) years after expiry of warranty period as per terms & conditions laid down in claus e 17 of Section II and scope of work of preventive maintenance schedule to be done under CAMC, given in Annexure F of Technical Specific ation No. M/246/1/15/Spec/MIG-MAG/Weld. Plant (Rev. 00). [ Warranty Period: 2 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .