| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance USHAS HOUSE IYYAD | -7.62% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.9 L+₹41,483.65 (4.89%)Admitted-Fee/PreQual/Technical/Finance KARALAN CHALILI SIVAPURAM P O KARUMALA KOZHIKODE | KOZHIKODE | KOZHIKODE | KERALA | -3.10% | ₹8.9 L+₹41,483.65 (4.89%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.2 L
EMD Value
₹23,000
Closing Date
29 Jun 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PMU KOZHIKODE VAIDYUTHI BHAVANAM
RECONDUCTORING HT LINE USING COVERED CONDUCTOR FROM KSIDC TO MANKAYAM UNDER ELECTRICAL SECTION UNNIKULAM
2026_KSEB_857103_1
PMU/KKD/e-Tender/14/2026-27 Dtd 22-06-2026
Open Tender
Electrical Works
Percentage
UNNIKULAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,242
₹23,000
3 Jul 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
22 Jun 2026 - 29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 13 | Trip | 3,142.26 | ₹40,849.38 |
| 2 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 45 | No | 762.14 | ₹34,296.3 |
| 3 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 7 | No | 906.41 | ₹6,344.87 |
| 4 | Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole. | 13 | No | 5,247.14 | ₹68,212.82 |
| 5 | Renewal of existing damaged/old 11kV PSC/RCC Pole with new A type pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole. | 7 | No | 6,231.95 | ₹43,623.65 |
| 6 | Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines. | 20 | No | 745.41 | ₹14,908.2 |
| 7 | Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. | 26 | No | 564.55 | ₹14,678.3 |
| 8 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. | 30 | No | 1,373.73 | ₹41,211.9 |
| 9 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. | 1 | No | 3,056.91 | ₹3,056.91 |
| 10 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). | 3 | No | 4,805.95 | ₹14,417.85 |
stage.html
html • 0.02 MB
finance_1448783.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BidDocument.pdf
Tender Documents • 1.28 MB
BOQ_1448783.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .