Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.7 LAccepted-AOC A 27 NAVBHARAT APARTMENT R C MARG CHEMBUR MUMBAI MAHARASHTRA MUMBAI MAHARASHTRA 400074 | MUMBAI SUBURBAN | MAHARASHTRA | 400074 | L1 | Accepted-AOC overall lowest bidder | |
| 2 | L2₹87.3 L+₹4.7 L (5.74%)Rejected-Finance M2ZX4 OPP DUKES PEPSI COMPANY WAMAN TUKARAM PATIL MARG AMAR NAGAR CHEMBUR MUMBAI MAHARASHTRA 400071 | MUMBAI SUBURBAN | MAHARASHTRA | 400071 | L2 | Rejected-Finance L2 bidder | |
| 3 | L3₹92.7 L+₹10.2 L (12.3%)Rejected-Finance | L3 | Rejected-Finance L3 bidder |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
18 Feb 2019, 11:00 amClosed
V.D.Gadekar
Room no.02 Technical Building RCF Trombay
Biannual rate contract to carry out various miscellaneous production related jobs in Urea plant and ABC plant for period of two years 2019-2021
2019_RCFL_439624_1
ET-TS/PROD/BRC/UREA-ABC/2019
Open Tender
Miscellaneous Services
Lump-sum
730 days
RCF Trombay Mumbai
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹50,000
Yes
22 Jan 2020
4 Feb 2019
18 Feb 2019
4 Feb 2019
18 Feb 2019
4 Feb 2019
Amount
Urea Plant:Cleaning of Scrapper floor in Urea plant.
Urea Plant:De-choking of screens at the downstream of ET-1&3. Reclaiming of Urea spillage near ET-1, 2, 3 and scrapper in Urea plant.
Urea Plant:Draining of spent oil from gear box, crankcase of high pressure Ammonia and Carbamate pumps. Cleaning the crankcase sump and refilling fresh oil in gear box, crank case and torque converter. Scrapper and cooling tower fan gear box spent oil draining and filling whenever required. Filling of oil in all the centrifugal pumps. Greasing of isolation valves whenever required in Urea plant.
Urea Plant:Cleaning of cooling tower deck in Urea plant.
Urea Plant:Top Prilling tower Louvers cleaning in Urea Plant.
Urea Plant:Desludging of cooling tower pit.
Urea Plant:Washing & cleaning of sand bed (2no.s) of sand filter.
Urea Plant:Recovery of oil from oil pit & Drain channel.
Urea Plant:Cleaning of Cooling tower screen.
Urea Plant:Segregation of Garbage Bin.
Urea Plant:Bringing soda ash bags from stores and addition of Soda ash to Cooling tower basin.
Urea Plant:Cleaning of drain channels in Urea and ABC plant
Urea Plant:Wrapping the teflon tape on stripper ferrules
Urea Plant:Cleaning the Ferrules of MP Decomposer, LP decomposer with soda ash using tumbler mixer
ABC Plant:Reclaiming ABC product from centrifuges outlet and dryer breaching chamber
ABC Plant:Cleaning of Cooling Tower deck in ABC plant
ABC Plant:Cleaning of Cooling Tower screen in ABC plant
ABC Plant:Draining of spent oil from gear box of dryer,centrifuge#1 and 2 ET2/3/4 and refilling fresh oil in gear box as per requirment
ABC Plant:Refilling of ABC lumps from old ABC bags to new bags
ABC Plant:Collecting of spillage ABC in bags and placing at proper place
Continent Engineers
M/s BALAJI ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .