Loading…
Loading…
Tender Value
₹21.0 L
EMD Value
₹21,000
Closing Date
17 Oct 2026, 6:00 pmClosed
Chief Officer, UNJHA NAGARPALIKA, UNJHA
CONSTRUCTION OF PROTECTION WALL FROM SADHIMATA TEMPLE TO 80 FOOT RINGROAD SIDE AND JAIN DERASAR SIDE AT UNJHA NAGARPALIKA AREA AT UNJHA.
352287
01 OF 2026 – 2027
Open
Civil Works
Fixed-rate
Mehsana
18 documents required · 18 mandatory
₹1,062
Chief Officer, UNJHA Nagar Seva Sadan, UNJHA
₹21,000
5 Oct 2026
5 Oct 2026
5 Oct 2026
17 Oct 2026
5 Oct 2026
Name Of Work : CONSTRUCTION OF PROTECTION WALL FROM SADHIMATA TEMPLE TO 80 FOOT
RINGROAD SIDE AND JAIN DERASAR SIDE AT UNJHA NAGARPALIKA AREA AT UNJHA.
Schedule-B1 : CONSTRUCTION OF PROTECTION WALL FROM SADHIMATA TEMPLE TO 80 FOOT
RINGROAD SIDE AND JAIN DERASAR SIDE AT UNJHA NAGARPALIKA AREA AT UNJHA.
Sr. No. Description Quantity Unit Rate Amount
1 Excavation for foundation upto 1.5 met. depth 215.00 Cu.M. 117.13
including dewatering,sorting out and stacking of
useful materials and disposing of the excavated
stuff upto 1.5 km led.(a) Loose or soft soil
2 Filling available excavated earth (excluding 215.00 Cu.M. 130.39
rock) in trenches. plinth, sides of foundations
etc. in layers not exceeding 20 cm. in depth
consolidating each disposited layer by
ramming and watering.
3 Providing and laying rubble for appron (each 32.00 Cu.M. 947.27
stone weighting not less than 40Kg.) including and
packing and filing in the interestices with quarry-
spalls. (upto 10 ton)
4 Providing and laying cement concrete 1:4:8 (1 29.00 Cu.M. 2357.89
cement : 4 coarse sand : 8 crushed stone
aggregates 40 mm nominal size) and curing
complete excluding cost of form work in
5 Providing and laying controlled cement concrete 282.00 Cu.M. 3800.01
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced
concrete work in (A) Foundations, footings, Base
of columns and Mass concrete (more than
6 Providing formwork of ordinary timber planking 857.00 Sq.M. 236.89
so as to give a rough finish including
centering,shuttring,struting and propping
etc.height of propping and centering below
supporting floor to celling not exceeding 4m and
removal of the same for cast in situ reinforced
concrate and plain concret work (C) Vertical
surface such as wall (any thickness partitions)
7 Providing TMT Bar FE 500D for R.C.C. work 8792.00 kg 76.21
including bending binding and placing in position
complete up to floor two level.
Total ( B1 ) :-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Invitation TENDER DOCUMENT-352287.pdf
2.SBD-2026 TENDER DOCUMENT-352287.pdf
3.Volume I-Technical Specifications TENDER DOCUMENT-352287.pdf
4. Special condition TENDER DOCUMENT-352287.pdf
5. GR TENDER DOCUMENT-352287.pdf
6.Schedual B TENDER DOCUMENT-352287.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .