Loading…
Loading…
Tender Value
₹18.0 L
EMD Value
₹18,000
Closing Date
3 Aug 2026, 6:00 pmClosed
Office Of The Executive Engineer, C.P. No.4, Block No.3, E-2 Wing, 5th Floor, Karmyogi Bhavan, Sector-10/A , Gandhinagar.
Consultancy Services for Quality Assurance & Technical Audit (QATA)/ Third-Party Inspection (TPI) of Interior and Furniture Works in the Administrative Building, Academic Building, Central Library, and Other Buildings at the New Campus of GTU, Lekawada, Gandhinagar
327857
10 Of 2026-27
Open
Consultancy
Works
Gandhinagar
6 documents required · 6 mandatory
₹900
Executive Engineer, Capital Project Div. No.4, Gandhinagar
₹18,000
27 Jul 2026
27 Jul 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
Consultancy Services for Quality Assurance & Technical Audit (QATA)/ Third-Party Inspection
(TPI) of Interior and Furniture Works in the Administrative Building, Academic Building, Central
Library, and Other Buildings at the New Campus of GTU, Lekawada, Gandhinagar.
BILL OF QUANTITIES
Percentage Rate Tender
Item Description of Item Quantity Unit Rate In Amount
1 Providing and engaging the services of a Regional 14.00 Visit 3030.00
Team Leader / Resident Engineer for inspection and
technical suggestions for the furniture works of the
building project, including a minimum Once in a
Week site visit. The scope includes Measurements
verification, GFC Draiwing study, quality checks,
compliance verification, coordination with
stakeholders, and submission of monthly inspection
reports with observations and recommendations, all
as directed and approved by the Engineer-in-Charge.
2 Providing and engaging the services of an 2 No. 200.00 Day 2272.50
Interior Engineer on a daily basis for inspection and
technical suggestions related to the furniture works
of the building project. The scope includes day-to-
day site inspection, quality assurance, verification of
workmanship as per approved drawings and
specifications, coordination with site teams, and
submission of daily progress notes or observations,
as directed by the Engineer-in-Charge.
3 Providing and engaging the services of a Quality 50.00 Day 16160.00
Control Engineer on an alternate day basis per
month for inspection and technical suggestions
related to the furniture works of the building
project. The scope includes inspection of materials
and workmanship, ensuring adherence to approved
specifications and drawings, reporting of non-
conformities, coordination with site teams, and
submission of inspection reports, all as directed by
the Engineer-in-Charge.
4 Providing and engaging the services of a Material 34.00 Visit 14140.00
Procurement Engineer with a minimum of 10 site
visits per month for inspection, verification, and
technical suggestions related to the procurement
and implementation of furniture works for the
building project. The scope includes checking
material quality, verifying supplier compliance with
approved specifications, coordinating with vendors
and site teams, and submitting visit-wise reports, all
as directed by the Engineer-in-Charge.
Item Description of Item Quantity Unit Rate In Amount
5 Preparing and submitting detailed Project Reports 10.00 Job 1262.50
including test results, description of completed
work, and documentation comprising colour
photographs and video recordings taken before
commencement, during execution, and after
completion of the furniture works. The scope
includes submission of progress reports every week
and a comprehensive final report in 5 hard copies,
all as per direction of Engineer-in-Charge.
I/We am/are willing to carry out the work at………………….% above/below percent(Should be written in figures
and words) of the estimated rate mentioned above. Amount of my /our
Tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
1 Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C.
4 items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Capital Project Sub Division -13 Capital Project Division -4
Gandhinagar Gandhinagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT.pdf
SBD.pdf
BOQ TPI Furniture GTU.pdf
Item Wise Specification TPI Furniture GTU.pdf
Special condition.pdf
Special Condition of Contract Furniture.pdf
1.0 GRs - SBD with Index (2 side).pdf
Eligibility Criteria.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .