Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 305 A OSWAL CHAMBER 2 CHURCH LANE KOLKATA 700001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹1.7 Cr+₹18.0 L (12.1%)Rejected-Finance 02 0517 PLOT NO AAIIB 330 ACTION AREA IIB NEWTOWN 24PGS N KOLKATA 700157 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700157 | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹1.8 Cr+₹32.1 L (21.5%)Rejected-Finance DIAMOND HARBOUR P O BISHNUPUR VIA KARKOT DIST SOUTH 24 PARGANAS | 24 PARAGANAS SOUTH | WEST BENGAL | 700070 | L3 | Rejected-Finance 3rd Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
7 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER, EASTERN CIRCLE, P.W.DTE
EASTERN CIRCLE, P.W.DTE Baguiati, New Building Complex, DeshBandhu Nagar (3rd Floor), (VIP Road) Kolkata -700059
Strengthening of Ghos para Road from 25.00 km to 25.186 km along with Service road and Bus Bay by Concrete Paver Block and from 25.186 km to 25.256 km by bituminous concreting under Barrackpore Division, PWD during the year 2022-23
2022_WBPWD_420335_1
WBPWD/SE/EC/NIT-14 of 2022-23
Open Tender
CIVIL WORKS
Percentage
90 days
Barrackpore
Please refer Tender documents.
4 documents required · 4 mandatory
₹2.9 L
Yes
SUPERINTENDING ENGINEER, EASTERN CIRCLE, P.W.DTE
6 Apr 2023
7 Nov 2022
9 Dec 2022
15 Nov 2022
7 Dec 2022
15 Nov 2022
17 Nov 2022
eProcurement System of Government of West Bengal Created By: PARTHA PRATIM SINHA Created Date/Time: 15-Dec-2022 04:53 PM Tender Title: WBPWD/SE/EC/NIT-14 of 2022-23 Tender ID: 2022_WBPWD_420335_1
Tender Inviting Authority: Superintending Engineer, Eastern Circle, PWD
Name of Work: Strengthening of Ghos para Road from 25.00 km to 25.186 km along with Service road and Bus Bay by Concrete Paver Block and from 25.186 km to 25.256 km by bituminous concreting under Barrackpore Division, PWD during the year 2022-23
Contract No: WBPWD/SE/EC/NIT-14 of 2022-23
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 AKASH CONSTRUCTION(GSTN-19AATFA5292M1ZL) 14533514.64 25.01 18168347.10 One Crore Eighty One Lakh Sixty Eight Thousand Three Hundred and Fourty Seven
2.00 Mukherjee Associates Infra Private Limited(GSTN-NA) 14533514.64 15.30 16757142.80 One Crore Sixty Seven Lakh Fifty Seven Thousand One Hundred and Fourty Two
3.00 SAI INFRA PROPERTIES INDIA PRIVATE LIMITED(GSTN-NA) 14533514.64 2.90 14954986.94 One Crore Fourty Nine Lakh Fifty Four Thousand Nine Hundred and Eighty Six
Lowest Amount Quoted BY: SAI INFRA PROPERTIES INDIA PRIVATE LIMITED(14954986.94)
BOQ Summary Details Tender Title: WBPWD/SE/EC/NIT-14 of 2022-23 Tender ID: 2022_WBPWD_420335_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SAI INFRA PROPERTIES INDIA PRIVATE LIMITED 14954986.94 L1
2 Mukherjee Associates Infra Private Limited 16757142.80 L2
3 AKASH CONSTRUCTION 18168347.10 L3
technical_829435.pdf
PDF • 0.05 MB
techsummary_829435.pdf
PDF • 0.25 MB
finance_829435.pdf
PDF • 0.35 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_829435.pdf
PDF • 0.19 MB
WO.pdf
PDF • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .