| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.3 LAccepted-AOC VALIYAPEEDIYAKKAL HOUSE MUTHUKURISSI P O PALAKKADU 678593 | MUTHUKURISSI | PALAKKAD | KERALA | 678593 | 1 | Accepted-AOC L1 Bidder | |
| 2 | 2₹4.9 L+₹64,150.58 (14.9%)Rejected-AOC | 2 | Rejected-AOC L2 Bidder | |
| 3 | 3₹5.5 L+₹1.2 L (27.2%)Rejected-AOC | 3 | Rejected-AOC L3 Bidder |
Tender Value
₹5.0 L
EMD Value
₹12,420
Closing Date
29 Nov 2023, 5:00 pmClosed
Stephen K F
O/o Assistant Executive Engineer, Workshop Subdivision Malampuzha
NABARD- CPP -Nurnee-Alamkadavu canal system -Replacement of damaged surplus shutters of Nurnee- Alamkadavu main canal- General Mechanical Work
2023_Irrig_620203_1
IRR/MH/TR/8693/2022_16_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
240 days
Chittur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,095
Yes
₹12,420
Yes
22 Dec 2023
8 Nov 2023
5 Dec 2023
8 Nov 2023
29 Nov 2023
8 Nov 2023
8 Nov 2023 - 29 Nov 2023
Amount
CIVIL WORKS- Demolishing,Centering & Shuttering,Concreting Work for fixing SS C GROOVE, SEAL TRACK and SILL BEAM.
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.5:Reinforced cement concrete work in arches, archribs, domes, vaults, shells, folded plate and roofs having slope more than 15 up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement :1.5 coarse sand(Zone III) : 3 graded stone aggregate 20 mm nominal size)
13.2.1:15 mm cement plaster on the rough side of single or half brick wall of mix:1:4 (1 cement :4 fine sand)
Supply of materials, fabrication,painting and erection of MS shutter.
OD24876/2022-2023:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges
OD24877/2022-2023:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges
OD25084/2022-2023:Supply of MS round bar including cost of conveyance charges
OD25081/2022-2023:Fabrication and errection of Embedded parts for canal shutters ( lJp to 2 tonne weight ) and accessories as per approved specifications, drawings and directions of deptl fficer at site including cost of labour,machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied.
OD25087/2022-2023:Fabrication and supply of Structural steel canal shutters ( Up to 2 tonne weight ) /Hoisting Bridge /Platform and accessories etc. for the same as per approved specifications, drawings and directions of deptl fficer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied
85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
OD25086/2022-2023:Providing EN-8 Screw Rod 7.50 Tonne Capacity 4.00 Mtr lift Screw Rod having one number of EN-8 Screw Shaft having a lifting speed of around 5.00 cm/min for 24 rpm of hand operation including cost of all material, labour, hire charges and conveyance. (63mm Dia Screw rod )
OD25083/2022-2023:PROVIDING BASE & NUT arrangement for hoisting the shutter including cost of all materials labour etc complete
OD25085/2022-2023:Hire Charges of diesel generator set at site (Maintenance of Canal Shutters)
85.116:Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the gates including cost of SS bolts and nut all labour and machinery and incidental and conveyance charges complete as per approved specification and drawing
85.118:Supplying and fixing in correct position with specified initial interface L-type / bulb nose rubber seal confirming to IS11855 to the gates including cost of SS bolts and nuts and all labour and machinery and incidental and conveyance charges complete as per approved specifications and drawings
OD25080/2022-2023:SUPPLYING and APPLYING GREASE on NEW SCREW ROD for CANAL GATE
OD25082/2022-2023:Erection of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Bridge / Platform including hand rails , lader etc. for the same including . alignment correcting and setting complete including cost of all labour, machinery, incidental and conveyance , lead and lift charges etc complete but excluding cost of materials already supplied..
P.Damodaran, G.R.Industries
ASHIFUL HAK.C
Bidder Name
Kinanath V P
P.Damodaran, G.R.Industries
ASHIFUL HAK.C
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_931895.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .