| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC 42 63 PALAMATTATHIL SOUTH KALAMASSERY SANTHI NAGAR RAJAGIRI P O KALAMASSERY ERNAKULAM 683104 | KALAMASSERY | ERNAKULAM | KERALA | 683104 | L1 | Accepted-AOC Lowest rate and hence the work is awarded to the Contractor | |
| 2 | L2₹17.1 L+₹12,813.91 (0.75%)Rejected-AOC ERATTUPETTA BLOCK PANCHAYATH KERALA | L2 | Rejected-AOC Higher rate and hence the tender rejected |
Tender Value
₹15.7 L
EMD Value
₹39,130
Closing Date
10 Jun 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Seena T O,Executive Engineer
MVIP Division No.4 Piravom
GENERAL-MVIP-CADWM-Peruva distributory-Construction of leading channel to Edayattu padasekharam in (Karadippuram bhagam) Mulakkulam panchayath-General Civil Work
2024_Irrig_664476_2
IRR/PII/TR/7168/2023_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Mulakkulam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹39,130
30 Jul 2024
10 May 2024
13 Jun 2024
10 May 2024
10 Jun 2024
10 May 2024
Amount
Appendix A: Field channel
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric
OD33448/2023-2024:Providing notice board at site of size 90cmx60cm, using 0.8mm thick G.I sheet, 50mm dia G.I pipe 2.5m long on either sides (fixing in CC 1:2:4 foundation 30cmx30cmx75cm size ), 30mmx 30mmx4mm MS equal angle frame including all cost of labour, conveyance, erection charges and painting two coat with synthetic enamel paint of approved brand and manufacture of required colour to given even shade including coat of approved steel primer( Red Oxide Zinc chromate) with cost and conveyance of all materials and labour charges etc complete as directed by the department officers at site.
Notice board-Lettering
8.3.2:Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman Hyphens and the like not to be measured and paid for
Denny Jose
Bidder Name
Denny Jose
PRIMETECH ENGINEERING
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1046315.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .