Dy.Minicipal Commissioner - West Zone
Construcing new Footpath at (1) Doon Blosam School to Achal Residency (2) Kavisha Tenament Road & as per requirement & Repairing Paver Block in GHB,Chandkheda Village & different chawls. in Chandkheda Ward West Zone
280321
8/25-26 (T.N.101)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹3,600
Yes
Municipal Commissioner, Ahmedabad
₹2 L
Yes
25 Feb 2026
25 Feb 2026
25 Feb 2026
6 Mar 2026
25 Feb 2026
Name of Work : Construcing new Footpath at (1) Doon Blosam School to Achal Residency (2) Kavisha Tenament
Road & as per requirement & Repairing Paver Block in GHB,Chandkheda Village & different chawls. in Chandkheda
Sr. Rate Amount
No. Quantity Item Description in Rs. Per in Rs.
Excavation for foundation upto 1.5m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff up to 50 Meter
lead.(B)Dense or Hard soil (R&B Dist.
AHMEDABAD SOR 2023-24 No.04001B page
Conveyance charge of earth, lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock,
fly ash, aggregates of any kind executed outside the
road site. Rate also includes spreading & levelling
etc complete. Internal conveyance above 50 mt
done within the work site is not payable. (R&B
2021-22 Statement No.5 Page no.5 & RA Approved
2 - St.Com.Res No.189,Dt.19/05/2022) -
d 1,500.00 d) Lead From 3 Km to 4 Km. 45.52 Cmt
e 1,500.00 e) Lead From 4 Km to 5 Km. 52.42 Cmt
Provdg. & laying cement concrete 1:5:10 (1 cement :
5 coarse sand : 10 hand broken stone aggregates
mm nominal size) and curing complete excluding
3 200 cost of form work in. 1802.24 Cmt
Supplying and fixing of 380 mm H x 300 mm L x
mm B Kerb block for Central Verge in M-20 grade using
20 mm nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork, mould with well equipped with vibratory
system for kerb stones of approved design including curing,
etc. complete, including the cost of formwork etc. complete.
The rate shall also include necessary cutting of asphalt, fixing
the Kerb stones in line and level on 5 cm thick sand bedding
with necessary equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of the kerb stone
fixed with Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable mixture. In
any case Gravel or such type of materials shall not be allowed
4 500 for production. 431.96 Rmt
Supplying and fixing of 300 mm-L x 150 mm-B x
mm-H Kerb block for Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork , mould with well equipped with vibratory
system for kerb stones of approved design including curing,
etc. complete, including the cost of formwork etc. complete.
5 The rate shall also include necessary cutting of asphalt, fixing
the Kerb stones in line and level on 5 cm thick sand bedding
with necessary equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of the kerb stone
fixed with Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable mixture. In
any case Gravel or such type of materials shall not be allowed
for production.
a 500 a) Laying on 5 cm thick Sand Bedding 350.89 RMT
Filling Zari Filling of Zari along the sides of the
kerbstone fixed, prepared with Bituminous Concrete
mixed in proper proportion as directed by Engineer- In -
6 100 Charge to form a pourable mixture. 50 Rmt
Construction of RCC nosing in central verge using M-200
grade cement concrete. The item includes cost of centering &
shuttering, reinforcement, both side cement plaster in C:M 1:3
mortar & curing etc. complete. Half round portion of the
7 30 nosing shall be made by using mild steel. 4812.72 No.
Providing and setting 50 to 60 mm thick rouge kotah
stone water table in line, level and in required gradient
including 25 mm thick beddcing in C.M. 1:6 (1 Part of
cement : 6 Part of coarse sand) with sufficient ramming
consolidation.Providing joints in C.M. 1:3 (1 Part of
Part coarse sand) and smooth pointing in C.M.1:1 (1 Part
of Cement, 1 Part of coarse sand)including watering etc.
complete and as per details in tender specification & as
directed by engineer in charge. (SMC Approved tender
8 Rate)Road Zonal tender 2022-23
Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing MH sheet cover, removing
9 the debris from MH and carting the same as directed.
50 (A) up to 0.15 mt. (@ Two Coarse) 732.14 No
50 (B) up to 0.35mt. (@ Four Coarse) 1160.71 No
50 (C) up to 0.65 mt. (@ Seven Coarse) 1794.64 No
10 (D) up to 0.90 mt. (@ Ten Coarse ) 2160.71 No
Labour work for fixing any kind of paving with cement
pointing in CM 1:2, including watering, ramming etc
10 comp. as directed
Laying on Sand bedding as per requirement to fix the
10000 C.C.Block / Nibhada Stone in Line & Level. 68.64 Smt
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Brick Blocks) using black trap good
quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as mentioned
in the drawing / instruction of engineer in charge. Cost
includes formworks using rubber mould, Rate providing
and laying paver blocks as per required grading and
specification. The paver block shall be mechanically
compacted. The work of paving blocks shall be executed
in line and level by skill mason of flooring work only. It
11 4000 should be laid in such a way that the no cutting of the 501.6 Smt
paver block to be necessary. if cutting of paver block
necessary then it should be cut by machine only and
carting. The finished surface of the paver block shall
have resonably good, plain finished. Paver blocks shall
be compacted and shall be relaid if necessary. Gravel or
such type of materials shall not be allowed for
production. Laying on 5 cms thick sand bedding. (AMC
Removal of existing any type of paving or paving stones
of any type, any size, any thickness in required depth
including removing paver with spil sub base and
breaking sub base i.e concrete or metaling etc under the
supervision of concerned department, disposal
unserviceable material with all lifts and up to any lead at
non objectional place and stacking the serviceable
material (paver) upto AMC store including loading,
12 2000 unloading as directed by Engineer-in-charge. 49 Smt
Dismantling the following including loading,
unloading and disposal of unserviceable material for
all lead or as directed by Engineer-In-Charge and
stacking the serviceable material and backfilling the
2 - resulting trenches and pits complete. -
a 0.00 central verge -kerb stone (AMC sor) 8 Rmt
Dismantling tiled or stone floors laid in mortar
including stacking of serviceable material and
disposal of uservicalble material with all lead and
b 500.00 lifts.(R&B SOR 2023-24 ITEM CODE 20005) 47.25 Smt
Demolition & disposal of unservisable material with
all lead and lift for unreinforeced concrete. SOR IT
Demolition of brick work & stone masonry including
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift (1) In
cement mortar.(R&B SOR 2023-24 ITEM CODE
Demolition including stacking of serviceable
materials and disposal of unserviceable materials
with all lead and lift. (I) R.C.C work.(R&B SOR
Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of thickness
up to 0.20 meter including demolishing the asphalt
carpet, metal, soiling/cutting Reinforcement etc.
8 - comp. with stacking the material as directed. -
a 1,500.00 up to 0.20 meter thickness (By Manual) 71.1 Sqm
0.20 to 0.30 meter (By any type of Breaker Machine
or R.C.C.Cutter machine including cost of operator,
b 1,000.00 fuel, & transportation etc. complete. 177.76 Sqm
0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including cost of
c 0.00 operator, fuel, & transportation etc. complete. 311.08 Sqm
Repairing damaged I.C./ Raising removing
damaged brick work and repairing by brick masonry
in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
14 50 steps and existing chamber sheet cover, removing 396 No
the debris from chamber and carting the same as
directed. (Based on Drainage SOR 2009-10) Road
Resurface zonal tender approved rate 2022-23
Barricading the entire break down or excavated
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion &
movement including cautionary board etc. Item also
includes for making temporary sufficient nos of
lighting arrangement through out the work with
necessary required arrangement. ..The same shall
be removed after completion of work. (Only for
break down work from start to complete) (Based on
Drainage SOR 2009-10)Road Resurface zonal
16 500 tender approved rate 2022-23 79.99 Rmt
Providing F.R.C. MH seat cover incl. carting to the
work site etc. comp. Directed. F.R.C. Extra Heavy
Duty (EHD-35) Manhole Covers & Frames Cover :
728mm ø & 100 mm thick circular cover, 35.00 MT
load design, 100x2mm MS flat allround, 16mm ø
plain round bar for lifting the cover & should be fitted
with plastic cups. Frame : 560 mm ø clear opening,
outer size- 888x888x175 mm. On the upper
periphery of frame 25 x 3 mm wide MS flat should
be well embed in concrete to protect the edges of
frame. FRC E.H.D.-35 manhole cover & frame
17 0 described as above 3,530.56 Set
F.R.C. Extra Heavy Duty [EHD-35] Machinehole
Covers & Frame- 560mm ø clear opening, The
dimension of frame and cover as per mentioned in
Amend No.1 to IS 12592 : 2002 table 1 ( Only
A 50 Cover ) 1,770.00 Nos
Set : FRC Strom Water Grating cover ( Jali) & frame
22 50 described as above. 2,509.86 set
F.R.C. Strom Water Grating Grating(Jali): 740 x
x 90mm square jali, 10:00 MT load design, 90x2mm
A 10.00 MS flat allround, 1,354.64 Nos
Frame: 600 x 600mm clear opening, outer size-
x 900 x 165 mm. On the upper periphery of frame
25 x 3mm wide MS flat should be well embded in
B 10.00 concrete to protect the edges of frame 1,159.94 Nos
Constructing Bombay Pattern Type Catch Pit of size
0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in
the prop. of CM (1:6) with 40 mm thick IPS flooring
in the prop M15 at bottom and 15 mm thick cement
plaster inside the catch pit in the proportion of CM
(1:3) with out jali etc. comp. as directed. (AMC
26 50 approved Rate ) 3,110.80 No
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit
jali with frame 600mm x 600mm clear opening etc.
comp.. As directed by engineer in charge. (AMC
27 50 approved Rate ) 1,377.64 No
40 0 Providing, laying, spreading and compacting graded 2,010.00 cmt
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC
in mechanical mix plant carriage of mixed Material
by tipper to site, laying in uniform layers in sub-
base / base course on well prepared surface and
compacting with vibratory roller to achieve the
desired density as per Codal Provision.(Zonal Road
Tender Yr 23-24)
a 1,500.00 Production & Supply of WMM 1,975.00 Cmt
b 1,500.00 Laying of WMM 35 Cmt
Providing and Casting in situ ordinary cement
concrete M200 for R.C.C. Raft and cutt off walls
including necessary shuttering laying, vibrating,
ramming and curing complete.(B) Walls, fom top of
foundation level upto floor two level (upto 10ton).
Pre cast concrete kerb Providing and fixing M25
Grade of concrete precast exposed / Fair finish /
texture finish kerb stones of approved make as per
approved sample of any size and any type. Kerbs
shall be fixed on the foundation prepared as per
approved design. The rate shall also include for
erecting and fixing the pieces in position for
complete kerb system with chamfered type of kerbs
including necessary accessories of kerb like radius
kerbs, angles and quadrant kerbs, droplet kerbs etc.
complete as per drawing. Kerb shall be fixed as
paper joint without any jointing material. However
cement mortar shall be provided at the backside of
kerb stone joint. (Sample must be approved) Cost of
excavation, cutting , base , side filling shall includes
as directed engineer - incharge in above item
description as per BOQ (b) 380 x 600 x 150 mm
50 5000.00 high Footpath kerb.As per approved rate 912.5 Rmt
Paver Block Providing and laying shot blasted Non -
interlocking, Paver blocks of specified thickness,
size, grade of concrete and colour machine made
and blasting by automatic shot blasting machine
and high density of as per approved sample of
approved make for footpath, parking areas, service
lanes,cross over and other areas as mentioned in
the drawing. Including providing and laying 50 mm
thick averave bedding layer of coarse sand below
paver block as per required grading and
specification. Laid paver block shall be mechanically
compacted. The work of the paving blocks shall be
executed in line and level by skilled mason of
flooring work only. Small size of paver block with
same specification shall be used at residue or at
end. It should be laid in such a way that the no
cutting of the paver block to be necessary. If cutting
of paver block shall be required , than cut by
machine only and laying to be done by skilled
flooring mason. The finished surface of the paver
54 6,000.00 block shall have coarse sand Texture Finish. Pave 669.65 Smt
blocks shall be compacted and shall be re-laid if
necessary. Actual laid area shall be measured and
paid without any wastage. (A) 60 mm thick M-35
grade Grey Paver block of size 200mm x
200mm.(AMC approved rate)
Bitumen Cutting
Labour charge of cutting in bituminous pavement.
Cutting to be done with heavy duty tandom cutting
machine consist of diamond blade. Minimum cutting
depth shall be 75 mm from the finished level.
Cutting shall be perfeclty in line. The width and
depth of the removal of asphalt towards kerb stone
shall be as per the drawing. Bitumen shall be
carefully removed so that the the cutting edge
towards the road should not be disturbed. The work
of removal of the asphalt will be considered in this
item as running meter of the cutting done by
machine. One cutting line will be considered per
length of the kerb stone. Bitumen and other debris
shall be disposed within 10.0 km. as per the
instruction of the engineer in charge. Surroundings
shall be cleaned to the satisfaction of the engineer
57 0.00 in charge. 113.39 Rmt
Pre cast Cylindrical Bollard
Providing and fixing cylinder pre cast bollard with
exposed/ fair finished made in M-30. Bollard is
precast with cement concrete of M-30 grade by
providing 4 no of 12 mm dia. tor steel by vibro
compaction method using FRP/steel mould for
achive shutttring finish as directed and approved by
EIC. Sample shall be approved. Approximate size of
bollard is 900 to 1000mm height x 225 to 300mm
dia. Rate shall be inclusive of concrete,
reinforcements as stated in the item description,
necessary moulds, pouring, placing, compaction,
necessary curing, all accessories required for fixing,
with all taxes, transportation, loading and unloading
charges. Additional reinforcement, if any shall be
measured and paid for in the relevant tender item.
The rate shall also include for erecting and fixing the
pieces in position etc complete as per drawing. The
rate shall also include the cost of excavation, base
PCC M15 grade and finish good, curing etc
complete as directed by engineer in charge.(C G
60 100 Road tender Approved Rate) 1,068.87 No.
Providing and fixing SS 304 grade satin finish
perforated dust bin / litter bin of size 850 mm x
mm x 850 mm and capacity 50 Ltr each bin
madeout of minimum 1.2mm thick sheet with pole of
Saflow, Jindal, KMGS and as per approved sample.
Dust bin shall be floor mounted with both side pivot
for tilting having stand arrangement. Both bin shall
be covered with SS sheet. Dust shall be having
chemical resistant, blended with stabilizers, Anti
66 10 Corrosive, Anti Acidic, Non toxic and free from 16,026.00 Nos
joints, welds or rims; open from either side for easy
garbage drop even from distance, Dustbin shall be
as per approved and seperate Dustbin for Dry and
wet Waste shallbe provided( Green and Blue Colour
Demarcation on it) (CG Road Approved ate)
Providing and making Tree pit. It includes
excavation upto 600 mm depth including removal of
the debris, Size of the pit is 1000 mm dia. Hume
pipe of 900 mm dia NP2 class with 500 mm height
to be placed in the excavated pit and outside area
of the Hume pipe to be filled with the good quality
earth completed as directed by Engineer-in-Charge.
Hume pipe shall be filled with the garden soil,(
10Kg/ per Tree pit of Vermi Compost or mixture of
decade neem cake and tobaco powder). upto
required depth and remaining bottom part shall be
filled with good soil completed as directed by
Engineer-in-Charge. Rate includes rate of hume
pipe, garden soil with Vermi Compost or mixture of
decade neem cake and tobaco powder , good soil
67 500 etc.(CG Road Approved Rate) 832.7 No
Providing and fixing tree guard, fabricated from 25 x
25 x 3 mm MS angle and 32 x 32 mm of 3.2 mm
thick MS weld mesh as per drawing and details.
Necessary provisions for the anchoring to floor shall
be made in the tree guard. Tree guard shall be
painted with 1 coat of epoxy primer of 50 to
micron DFT (dry film thickness) and 2 top coats of
Metal PU Paint of having DFT 40 to 50 micron of
approved shade of MRF or equivalent paint as per
manufacture’s specification over all the surfaces or
as specified in the drawing as per the shade
approved as per the drawing and specification. The
rate shall also include the fixing of necessary name
plate. (Sample to be approved) (CG ROAD
68 10.00 Approved Rate) 2,101.21 Nos
Providing and fixing 75 mm thick Tree Grating
950*950*75 mm as per design and drawing. The
rate shall be inclusive of providing and laying 50 to
80 mm thick average bedding layer of coarse sand
below tree grating as per required grading and
specification. The centre of the grating to be same
as the centre of the tree trunk. The grating to be
pieces as per drawing. The work of the grating
blocks shall be executed in line and level by skilled
mason of flooring work only. (Sola Scienecity Road
69 5.00 tender Rate) 824.56 No.
Brick work using common burnt clay building bricks
having crushing trength not less than
kg./Sq.Cm. in foundation and plinth in Cement
Mortar 1:5. (1- Cement : 5 -fine sand)(A) Modular
72 5 (SOR 23-24 IT CODE: 06001AA 4,345.02 Cmt
Providing 15mm thick cement plaster in single coat
on Rough (Similar)side of single or half brick walls
73 50 for interior plastering upto loor two level and finished 155.61 Smt
even and smooth in (ii) Cement mortar 1:4 (1-
cement :4-sand (SOR 23-24 IT CODE: 17002B
Granite stone cobble flolring of size 100x100x7.50
cm (average) thick laid over 20mm (avg.) thick base
of cement mortar 1:3 (1 cement :3 coarse sand) of
approved design/shape jointed and pointed with
cement mortar 1:3 (1 cement : 3 coarse sand) of
average 10mm thick joints etc. complete as per
74 50 direction of Engineer-in-Charge 1,227.82 Sqm.
Providing and laying polished Kota stone slab
flooring over 20mm (Average) thick base of cement
mortar 1:6 (1-cement : 6-coarse sand) or L.M. 1.1.5
(1-Lime putty :1.5 - coarse sand) laid over and
jointed with grey cement slurry mixed with pigment
to match the shade of slab including rubbing and
polishing etc. complete. (A) 25mm thick
75 50 SOR 23-24 IT CD NO : 14012AA 982.83 Sqmt
Providing & Supplying JCB Machine on rental basis
in case of emergency situation and break down type
work & also during unavoidable condition as per
instruction of engg.incharge, rate includes all nece.
shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store.
(No payment should be allowed for non working
condition of machinery and for pipe line excavation
and laying work) (Based on Previously approved
78 50 rate by CE sir ) 535.71 hour
Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator,
fuel, power Supply etc. Complete as Directed. (No
payment should be allowed for non working condition of
machinery and for pipe line excavation and M.H. work.
Allowed only for break down work) (Based on Previously
79 20 approved rate by C E sir ) 535.71 Hour
80 21000.00 Applying priming coat over new steel and any other 21.80 Sq.M.
surface after and including preparing the surface by
throughly cleaning, oil,grease, dirt and other foreign
matter and scoured with brushes fine steel wood,
scrapers and sand paper with ready mixed priming
paint brushing red lead.
81 21000.00 Painting Two Coats on divider and footpath curb 71.86 Smt
surface / New Concrete Surface (Painting two coats
after filling the surface with synthetic enamel paint
in all shades on new plastered concrete surfaces)
Contractor'sSign Addl.C.E.
MobilNo:- (westzone)
AHMEDABADMUNICIPALCORPORATIONENGINEERDEPARTMENT
TECHNICALSPECIFICATION
Nameof Work :- Construcing new Footpath at (1) Doon Blosam School to Achal Residency (2) Kavisha
Tenament Road & as per requirement & Repairing Paver Block in GHB,Chandkheda Village & different
chawls. in Chandkheda Ward West Zone
GeneralTechnicalSpecificationSection
FollowingtechnicalspecificationsshallbeapplicabletotherelevantitemsofBOQ
Dismantling the following including loading, unloading and disposal of unserviceable material for all lead or as directed by Engineer-In-Charge and
stacking the serviceable material and backfilling the resulting trenches and pits complete.
a. central verge -kerb stone.
b. Dismantling tiled or stone floors laid in mortar including stacking of serviceable material and disposal of unserviceable material with all lead and
c. Demolition & disposal of unserviceable material with all lead and lift for unreinforced concrete.
d. Demolition of brick work & stone masonry including stacking of serviceable materials and disposal of unserviceable materials with all
lead and lift (1) In cement mortar.
e. Demolition including stacking of serviceable materials and disposal of unserviceable materials with all lead and lift. (I) R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified or shown in the drawings. Demolition implies
taking up or down or breaking up. This shall consist of demolishing whole or part of work including all relevant item as specified or shown in the
drawings.The demolition shall always be planned before hand and shall be done in reverse order of the one in which the structure was constructed.
Bidders is fully responsible for proper and safe demolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work or property, which is to be left intact, before
dismantling and demolishing is taken up and the work shall be carried out in such a way that no damages is caused to the adjoining
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary precautions shall be taken to keep the dust nuisance down
as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged by dropping from a height or demolishing roof,
masonry etc. shall be carefully dismantled first. The dismantled articles shall be properly stacked as directed.
All materials obtained from demolition shall be the property of Government unless otherwise d shall be kept in safe custody until handed over to the
Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out and stacked properly as directed, with all lead
and lift. All unserviceable materials, rubbish etc. shall b stacked as directed by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition dismantling and no allowance for increase in bulk shall be allowed.
The demolition of lime concrete shall be measured under this item. Specification for deduction for voids, openings etc. shall be on same basis as that
employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following limits, unless otherwise stated hereinafter : (a) Dimensions
shall be measured to the nearest 0.01 mt. (b) Area shall be worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be worked out to
the nearest 0.01 Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and dismantling including scaffolding. The
rate shall also include the charges for separating out and stacking the serviceable materials properly and disposing the unserviceable
materials with all lead and lift. The rate also includes for temporary storing for the safety of the portion not required to be pulled down or of
adjoining property and providing temporary enclosures or partitions where considered necessary.
The rate shall be for a unit of one cubic metre.
For Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on mortars shall be done
Dismantling implies carefully taking up or down or these are fixed by nail screws bolts etc. the shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate shall include stacking the unserviceable materials as
directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of thickness up to 0.20 meter including
demolishing the asphalt carpet, metal, soiling/cutting Reinforcement etc. comp. with stacking the material as directed.
The Item shall be carried out as per Item description and as per instruction of Engineer-in-Charge and/or his authorized representative.The
rate includes the cost of excavation of bituminous macadam i.e. bituminous layers only like DBM, BC etc including the labours, tools, equipment and
all other incidental expenses. Non Bituminous Sub-layer/Sub base are not considered in this item.Work shall be carried out manually or by Machinery
as per site requirements.
The mode of payment for this item shall be on Smt. Basis.
Barricading the entire break down or excavated area on lumsum rental basis using wooden ballies / M.S. angles at max.
2.0 meter center to center, C.G.I sheet, reflective paint out side to avoided accident and for smooth traffic diversion and movement including
cautionary board etc. the same shall be removed after completion of work.
The height of the barricades should be minimum 1.20 mt from the ground level. The Item shall be carried out as per Item description and
as per instruction of Engineer-in-Charge and/or his authorized representative. After removal of barricades, all material related to
barricading shall be property of the Bidders.
The mode of payment for this item shall be on Rmt. Basis.
Box cutting the road surface to proper slope and camber for making a base for road work or Excavation for all kinds of soil Earthwork in
excavation for all kind of soil by any means including getting out the excavated soil, sorting and stacking of useful material, dressing of the sides,
ramming of bottom, and disposal of surplus excavated earth for upto 200 Mt.lead area and lift any Depth etc complete as directed by engineer-in-
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such ordinary excavating
implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials and rubbish of all kind, bush, wood and trees
shall be removed as directed. The materials so obtained shall be property of the Government and be conveyed and stacked as directed. within 200 M.
lead. The roots of the trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be paid.
After clearing the site, the center lines will be given by the Engineer-in-charge. The Bidders shall assume full responsibility
for alignment, elevation and dimension of each and all parts of the work. Bidders shall supply laborers, materials, etc. required for setting out the
reference marks and bench marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and depth as shown in the drawings or as directed.
The Bidders shall do the necessary shoring and shutting or providing necessary slopes to a safe angle, at his own-cost. The payment for such
precautionary measures shall be paid separately if not specified. The bottom of the excavated area shall be 1 evened both longitudinally and
transversely. as directed by removing and watering as required. No earth filling will be allowed for bringing it to level, if mistake or any other reason
excavation is made. deeper or wider that shown on the plan or directed. The extra depth or width shall be made up with concrete of same proportion
as specified for the foundation concrete at the cost of the Bidders. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground in layer including ramming
and watering etc. The balance of the excavated quantity shall be removed by the Bidders from the site of work to a place as directed with lead upto
200 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of trenches shown on
the drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus excavation made in excess of above
requirements or due to slopping and sloping back as found necessary on account of conditions of soil , and requirements of safety.
The Item shall be carried as per Item Description in tender document and as Per prevailing latest IS & IRC Code & Genral
Specification booklet and As per instruction of Engineer-in-Charge and/or his authorized representative.
The mode of payment for this item shall be on Cmt. Basis
The rate shall be for a unit of one cubic meter.
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash, aggregates of any kind Including
spreading & levelling etc. complete.
• Lead Upto 1 Km.
• Lead From 1 Km to 2 Km.
• Lead From 2 Km to 3 Km
• Lead From 3 Km to 4 Km
• Lead From 4 Km to 5 Km
• Lead From 5 Km to 10 Km
• Lead From 10 Km to 15 Km
• Lead From 15 Km to 25 Km
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash, aggregates of any kind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a lead of 200 meters or as per
instruction given by Engineer in charge. Useful materials obtained from clearing site and excavation shall be stacked and used within the work site.
Internal conveyance above 200 mt within the work site i.e. From starting chainage to End chainage of a given road WILL NOT BE PAYABLE. Materials
suitable for construction of Embankment, earthen shoulder and subgrade shall be stacked at convenient places within a work site for reuse. No extra
payment will be paid to the Bidders for stacking of earth within the work site and reused for the construction of Embankment layer, sub
grade and earthen shoulder purpose. Only surplus earth shall be disposed off outside the work site as per instruction given by Engineer-In-charge.
Useful stones from rock excavation shall be stacked nearly within a lead of 50 M. and will be allowed to be used by the Bidders on payment at rates
laid down in the contract or if not so aid down, at schedule of rates of the Division or at a mutually agreed rates if there are no such rates in the
Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance from a particular stretch of
given road will be paid in this item as per instruction of Engineer in charge. No bulkage of disposed earth will be considered for the payment.
The rate shall be for a unit of one cubic meter.
Rolling of Earth Work in layers with power roller including spreading of earthwork and filling in depressions which occurs during the process..
As directed by engineer incharge & as per prevailing latest IS & IRC Code.
The rate shall be for a unit of one cubic meter.
Watering of Earth as Directed.
As directed by engineer incharge & as per prevailing latest IS & IRC Code.
The rate shall be for a unit of one cubic meter.
Construction of granular Sub base using crusher run, spreading in uniform layers with motor grader on prepared surface mixing by
mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as
per tender specification. For all grade.( crushed GSB shall be used)
This work shall consist of laying and compacting well graded material on prepared sub grade in accordance with the
requirements of these specifications. The material shall be laid in one or more layers as sub-base or lower sub-base and upper
sub-base as directed by the Engineer.
The material to be used for the work shall be natural sand, crushed gravel, crushed stone, crushed slag or combination thereof
depending upon the grade required. The material shall be free from organic or other deleterious constituents and shall cnfirm
to the grading given in table 18-1. The grading to be adopted for a project shall be as specified in the Contract. If the thickness
of GSB layer is more than 150 mm then the sub-base is required to laid in two layers as upper sub-base and lower sub-base.
Table 18-1 : Grading for Granular Sub-base Materials
IS Sieve Designation Percent by Weight Passing the IS Sieve
Grading I Grading II Grading III Grading IV Grading V
Table 18-2 : Physical Requirements for Materials for Granular Sub-base
Aggregate Impact Value (AIV) IS:2386(Part4) or IS:5640 Maximum
Liquid Limit IS:2720 (Part 5) Maximum
Plasticity Index IS:2720 (Part 5) Maximum
CBR at 98% dry density (at IS:2720-Part 8) IS:2720 (Part 5) Minimum
Construction Operations :-
Preparation of Sub-grade
Immediately prior to the laying of sub-base, the subgrade already finished shall be prepared by removing all vegetation and
other extraneous matter, lightly sprinkled with water, rolled with two passes of 80-100 kN smooth wheeled roller.
Spreading and Compacting
The sub-base material of the grading specified in the Contract shall be spread on the prepared sub grade with the help of a
motor grader of adequate capacity, its blade having hydraulic controls suitable for initial adjustment and for maintaining the
required slope and grade during the operation, or other means as approved by the Engineer.
Manual mixing shall be permitted only where the width of laying is not adequate for mechanical operations as in small sized
jobs. The equipment used for mix-in-place construction shall be a rotavator or similar approved equipment capable of mixing
the material to the desired degree. If so desired by the Engineer, trial runs with the equipment shall be carried out to
establish its suitability for the work.
Moisture content of the loose material shall be checked in accordance with IS:2720 (Part 2) and suitably adjusted by
sprinkling additional water from a truck mounted or trailer mounted water tank and suitable for applying water uniformly and
at controlled quantities to variable widths of surface or other means approved by the Engineer so that, at the time of
compaction, it is from 1 per cent above to 2 per cent below the optimum moisture content corresponding to IS: 2720 (Part 8).
While adding water, due allowance shall be made for evaporation losses. After water has been added, the material shall be
processed by mechanical or other approved means like disc harrows, rotavators until the layer is uniformly wet.
Immediately after spreading the mix, rolling shall be done by an approved roller. If the thickness of the compacted layer does
not exceed 100 mm, a smooth wheeled roller of 80 to 100 kN weight may be used. For a compacted single layer upto 200 mm
the compaction shall be done with the help of a vibratory roller of minimum 80 to 100 kN static weight capable of achieving
the required compaction. Rolling shall commence at the lower edge and proceed towards the upper edge longitudinally for
portions having unidirectional cross fall or on super elevation. For carriageway having cross fall on both sides, rolling shall
commence at the edges and progress towards the crown.
Each pass of the roller shall uniformly overlap not less than one-third of the track made in the preceding pass. During rolling,
the grade and cross fall (camber) shall be checked and any high spots or depressions which become apparent, corrected by
removing or adding fresh material. The speed of the roller shall not exceed 5 km per hour.
Rolling shall be continued till the density achieved is at least 98 percent of the maximum dry density for the material
determined as per IS:2720 (Part 8). The surface of any layer of material on completion of compaction shall be well closed, free
from movement under compaction equipment and from compaction planes, ridges, cracks or loose material. All loose,
segregated or otherwise defective areas shall be made good to the full thickness of layer and re-compacted.
Surface Finish and Quality Control of Work :-
CONTROL OF ALIGNMENT, LEVEL AND SURFACE REGULARITY
All works performed shall conform to the lines, grades, cross sections and dimensions shown on the drawings or as directed
by the Engineer, subject to the permitted tolerances described herein-after.
Horizontal Alignment
Horizontal alignment shall be reckoned with respect to the centre line of the carriageway as shown on the drawings. The
edges of the carriageway as constructed shall be correct within a tolerance of ± 10 mm therefrom. The corresponding
tolerance for edges of the roadway and lower layers of pavement shall be ± 25 mm.
The levels of the subgrade and different pavement courses as constructed, shall not vary from those calculated with
reference to the longitudinal and cross-profile of the road shown on the drawings or as directed by the Engineer beyond the
tolerances mentioned in below Table.
Table18-3: Tolerances in Surface Levels
1) Subgrade ±20 mm
a) Flexible pavement ±10 mm
b) Concrete pavement ±6 mm
3) Base-course for flexible pavement ±6 mm
a) Bituminous Base/Binder course
i) Machine laid ±10 mm
ii) Manually laid ±15 mm
4) Wearing course for flexible pavement
a) Machine laid ±6 mm
b) Manually laid ±10 mm
5) Cement concrete pavement ±5 mm
Provided, however, that the negative tolerance for wearing course shall not be permitted in conjunction with the positive
tolerance for base course, if the thickness of the former is thereby reduced by more than the following limits:
• 4 mm for bituminous wearing course of thickness 40 mm or more
• 3 mm for bituminous wearing course of thickness less than 40 mm
• 5 mm for concrete pavement slab
For checking compliance with the above requirement for subgrade, sub-base and base course, measurements of the
surface levels shall be taken on a grid of points placed at 6.25 m longitudinally and 3.5 m transversely. For any 10 consecutive
measurements taken longitudinally or transversely, not more than one measurement shall be permitted to exceed the
tolerance as above, this one measurement being not in excess of 5 mm above the permitted tolerance.
For checking the compliance with the above requirement for bituminous wearing courses and concrete pavements,
measurements of the surface levels shall be taken on a grid of points spaced at 6.25 m along the length and at 0.5 m from the
edges and at the centre of the pavement. In any length of pavement, compliance shall be deemed to be met for the final road
surface, only if the tolerance given above is satisfied for any point on the surface.
Surface Regularity of Pavement Courses
The longitudinal profile shall be checked with a 3 metre long straight edge/moving straightedge as directed by the Engineer at
the middle of each traffic lane along a line parallel to the centre line of the road.
The maximum permitted number of surface irregularities shall be as per given Table
Table18-4 : Maximum Permitted Number of Surface Irregularities
Surfaces of Carriageways and Surfaces of Laybys, Service Areas and all
Paved Shoulders Bituminous Base Courses
Irregularity 4 mm 7 mm 4 mm 7 mm
Number of Surface Irregularities on
National Highways/ Expressways* 15 9 2 1 40 18 4
Number of Surface Irregularities on
Roads of lower Category* 40 18 4 2 60 27 6
* Category of each section of road as described in the Contract.
The maximum allowable difference between the road surface and underside of a 3 m straightedge when placed parallel with,
or at right angles to the centre line of the road at points decided by the Engineer shall be:
for pavement surface (bituminous and cement concrete) 3 mm
for bituminous base courses 6 mm
for granular sub-base/base courses 8 mm
for sub-bases under concrete pavements 10 mm
for subgrade 15 mm
Where the surface regularity of subgrade and the various pavement courses fall outside the specified tolerances, the
Contractor shall be liable to rectify these in the manner described below and to the satisfaction of the Engineer.
i) Subgrade: Where the surface is high, it shall be trimmed and suitably compacted. Where the same is low, the
deficiency shall be corrected by scarifying the lower layer and adding fresh material and recompacting to the
required density. The degree of compaction and the type of material to be used shall conform to the requirements
of tender document.
ii) Granular Sub-base: Same as at (i) above, except that the degree of compaction and the type of material to be used
shall conform to the requirements of tender document.
iii) Lime/Cement Stabilized Soil Sub-base: For lime/cement treated materials where the surface is high, the same shall
be suitably trimmed while taking care that the material below is not disturbed due to this operation. However,
where the surface is low, the same shall be corrected as described herein below. For cement treated material, when
the time elapsed between detection of irregularity and the time of mixing of the material is less than 2 hours, the
surface shall be scarified to a depth of 50 mm, supplemented with freshly mixed materials as necessary and
recompacted as per the relevant specification. When this time is more than 2 hours, the full depth of the layer shall
be removed from the pavement and replaced with fresh material to Specification. This shall also apply to lime
treated material except that the time criterion shall be 3 hours instead of 2 hours.
iv) Water Bound MacadamA/Vet Mix Macadam Sub-base/Base: Where the surface is high or low, the top 75 mm shall
be scarified, reshaped with added material as necessary and recompacted
v) Bituminous Constructions: For bituminous construction other than wearing course, where the surface is low, the
deficiency shall be corrected by adding fresh material over a suitable tack coat, if needed, and recompacting as per
specifications. Where the surface is high, the extra thickness in the affected layer shall be removed and replaced
with fresh material and compacted to Specifications. For wearing course, where the surface is high or low, the full
depth of the layer shall be removed and replaced with fresh material and compacted to specifications. In all cases
where the removal and replacement of a bituminous layer is involved, the area treated shall not be less than 5 m in
length and not less than 3.5 m in width.
If deemed necessary by the Engineer, any section of the slab which deviates from the specified levels and tolerances shall be
demolished and reconstructed at the Contractor's cost.
The riding quality of bituminous concrete wearing surface, as measured by a standard towed fifth wheel bump integrator,
shall not be more than 2000 mm per Km.
Control on the quality of materials and works shall be exercised by the Engineer as per Table 18-5.
Table 18-5 : Test and Frequency for Materials for Granular Sub-base
Type of Construction Test Frequency (As per Circular No. 66)IS Code
Granular Sub- Base Gradation One test per 400 Cu.m. IS:2386, Part-I-1963
Atterberg Limits One test per 400 Cu.m. IS:2720, Part-V
(Liquid Limit, Plasticity Index)
Moisture content prior to One test per 400 Cu.m. IS:2720, Part-II
Density of compacted layer One test per 1000 sq.m IS:2720, Part-VIII
CBR As required IS:2720, Part-XVI
Arrangements for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take all necessary
measures for the safety of traffic during construction and provide, erect and maintain such barricades, including signs,
marking, flags, lights and flagmen as per instruction of the Engineer-in-charge.
Measurements for Payment
The rate shall be for a unit of one cubic meter.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the
Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub-
base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density etc complete.
Production & Supply of WMM to site of works
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material, premixed with water, to a
dense mass on a prepared sub-grade/sub- base/ base or existing pavement as the case may be in accordance with the requirements
of these Specifications. The material shall be laid in one or more layers as necessary to lines, grades and cross-sections shown on the
approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or other approved types of
compacting equipment are used, the compacted depth of a single layer of the sub-base course may be upto 200 mm with the
approval of the Engineer.
Physical Requirements
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical requirements set forth in Table 19-1.
Sevaliya/Timba/Ankodiya special aggregate is only acceptable.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test shall be carried out on the material
delivered to site as per IS:2386 (Part-5).
Table 19-1 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base Courses
S. No. Test Test Method Requirements
1. Los Angeles Abrasion value or IS:2386 (Part-4) 40 percent (Max.)
Aggregate Impact value
IS:2386 (Part-4) or 30 percent (Max.)
2. Combined Flakiness and Elongation indices (Total)
IS:2386(Part-1) 35 percent (Max.)*
* To determine this combined proportion, the flaky stone from a representative sample should first be separated out. Flakiness index is weight of flaky stone
metal divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index is weight of
elongated particles divided by total non-flaky particles. The values of flakiness index and elongation index so found are added up
Grading Requirements
The aggregates shall conform to the grading given in Table 19-2.
Table 19-2 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600 micron 8-22
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary from the low limit on one
sieve to the high limit on the adjacent sieve or vice versa.
Construction Operations:-
Preparation of Base
The surface of the sub-grade/sub-base/base to receive the Wet mix macadam course shall be prepared to the specified grade and
camber and cleaned of dust, dirt and other extraneous material. Any ruts or soft yielding places shall be corrected in an approved
manner and rolled until firm surface is obtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including depressions and potholes shall be
repaired and made good with the suitable material. The existing surface shall be scarified and re-shaped to the required grade and
camber before spreading the coarse aggregate for Wet mix macadam.
Preparation of Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having provision for controlled addition of
water and forced/positive mixing arrangement like pugmill or pan type mixer of concrete batching plant. For small quantity of wet
mix work, the Engineer may permit the mixing to be done in concrete mixers.
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more than agreed limit. The mixed material
should be uniformly wet and no segregation should be permitted.
Spreading of mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared subgrade/sub-base/base in
required quantities. In no case should these be dumped in heaps directly on the area where these are to be laid nor shall their
hauling over a partly completed stretch be permitted.
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-Charge and/or his authorized
representative. For portions where mechanical means cannot be used, manual means as approved by the Engineer shall be used.
The motor grader shall be capable of spreading the material uniformly all over the surface. Its blade shall have hydraulic control
suitable for initial adjustments and maintaining the same so as to achieve the specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
(i) Loading hoppers and suitable distribution mechanism
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it is spread without rutting or
otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished surface is free from surface
The surface of the aggregate shall be carefully checked with templates and all high or low sports remedied by removing or adding
aggregate as may be required. The layer may be tested by depth blocks during construction. No segregation of layer and fine
particles should be allowed. The aggregates as spread should be of uniform gradation with no pockets of fine materials.
After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be uniformly compacted, to the full
depth with suitable roller. If the thickness of single compacted layer does not exceed 100 mm, smooth wheel roller of 80 to 100 kN
weight may be used. For a compacted single layer upto 200 mm, the compaction shall be done with the help of vibratory roller of
minimum static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not exceed 5 km/h.
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge and progress gradually
towards the upper edge. Thereafter, roller should progress parallel to the centre line of the road, uniformly over-lapping each
preceding track by at least one third width until the entire surface has been rolled. Alternate trips of the roller shall be terminated in
stops at least 1 m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward until the edges have been
firmly compacted. The roller shall then progress gradually towards the centre parallel to the centre line of the road uniformly
overlapping each of the preceding track by at least one-third width until the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be corrected at once as
specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly compacted with mechanical
tampers or a plate compactor. Skin patching of an area without scarifying the surface to permit proper bonding of the added
material shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the sub-base/base course
or subgrade. If irregularities develop during rolling which exceed 12 mm when tested with a 3 metre straight edge, the surface
should be loosened and premixed material added or removed as required before rolling again so as to achieve a uniform surface
conforming to the desired grade and crossfall. In no case should the use of unmixed material be permitted to make up the
depressions. Rolling shall be continued till the density achieved is at least 98 per cent of the maximum dry density for the material
as determined by the method outlined in IS : 2720 (Part-8).
After completion, the surface of any finished layer shall be well-closed, free from movement under compaction equipment or any
compaction planes, ridges, cracks and loose material. All loose, segregated or otherwise defective areas shall be made good to the
full thickness of the layer and recompacted.
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface till it has dried and the
wearing course laid.
Surface Finish and Quality Control of Work
Surface evenness:
The surface finish of construction shall conform to the requirements of Clause in Item No. 16&17&18.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 19-3.
Table 19-3 : Test and Frequency for Materials for Wet Mix Macadam
Type of Test Frequency IS Code
Construction (As per Circular No. 66)
Wet Mix Gradation One test per 200 Cu.m. IS:2386, Part-I-1963
Macadam Aggregate Impact Value One test per 1000 Cu.m. IS:2386, Part-IV
Combined Flakiness and One test per 500 Cu.m. IS:2386, Part-I
Elongation Indices
Atterberg Limits of portion of One test per 200 Cu.m. IS:2720, Part-V
aggregates passing
425 micron sieve
Density of compacted layer One set of three tests per IS:2720, Part-VIII
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where the course is otherwise
defective due to subgrade soil getting mixed with the aggregates, the full thickness of the layer shall be scarified over the affected
area, reshaped with added premixed material or removed and replaced with fresh premixed material as applicable and recompacted.
The area treated in the aforesaid manner shall not be less than 5 m long and 2 m wide. In no case shall depressions be filled up with
unmixed and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take all necessary measures for
the safety of traffic during construction and provide, erect and maintain such barricades, including signs, marking, flags, lights and
flagmen as per instruction of the Engineer-in-charge.
Measurements for Payment
The rate shall be for a unit of one cubic meter.
Providing and applying primer coat with cationic bitumen emulsion SS1 grade conforming to ASTM GRADE on prepared surface of
wet mix macadam including clearing of Wet mix macadam surface with air compressor to remove all loose material other foreign
material. The primer shall be sprayed uniformly at the rate of 0.70-1.0 kg/sqm. It shall be applied by a self-propelled or towed
bitumen pressure sprayer, equipped for spraying the material uniformly at a specified rate. No dilution or heating at site of SS1
bitumen emulsion shall be permitted.
This work shall consist of the application of a single coat of low viscosity liquid bituminous material to a porous granular/ stabilized
surface preparatory to the superimposition of bituminous treatment or mix.
The primer shall be cationic bitumen emulsion SS1 grade conforming ASTM as per latest Codal provision.
Quantity of SS1 grade conforming ASTM as per latest Codal provision bitumen emulsion for various types of granular surface shall be
as per given Table.
Type of Surface Rate of Spray (kg/Smt)
WMM/WBM 0.7-1.0
The correct quantity of primer shall be decided by the Engineer and shall be such that it can be absorbed by the surface without
causing run-off of excessive primer and to achieve desired penetration of about 8-10 mm.
Weather and Seasonal Limitations
Primer shall not be applied during a dust storm or when the weather is foggy, rainy or windy Surfaces which are to receive emulsion
primer should be damp, but no free or standing water shall be present. Surface can be just wet by very light sprinkling of water.
The primer shall be applied by a self-propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at
specified rates and temperatures. Hand spraying shall not be allowed except in small areas, inaccessible to
the distributor, or in narrow strips where primer shall be sprayed with a pressure hand sprayer, or as directed by the Engineer.
Preparation of Road Surface
The granular surface to be primed shall be swept clean by power brooms or mechanical sweepers and made free from dust. All
loose material and other foreign material shall be removed completely. If soil/murrum binder has been used in the WBM surface,
part of this should be brushed and removed to a depth of about 2 mm so as to achieve good penetration.
Application of Bituminous Primer
After preparation of the road surface, the primer shall be sprayed uniformly at the specified rate. The method for application of the
primer will depend on the type of equipment to be used, size of nozzles, pressure at the spray bar and speed of forward movement.
No heating or dilution of SS1 bitumen emulsion and shall be permitted at site.
Curing of Primer and Opening to Traffic
A primed surface shall be allowed to cure for at least 24 hours or such other higher period as is found to be necessary to allow all
the moisture/volatiles to evaporate before any subsequent surface treatment or mix is laid. Any unabsorbed primer shall first be
blotted with a light application of sand, using the minimum quantity possible. A primed surface shall not be opened to traffic other
than that necessary to lay the next course.
Quality Control of Work
Control on the quality of materials and works shall be exercised by the Engineer as per Table 20-1.
Table 20-1 : Test and Frequency for Primer Coat
Type of Construction Test Frequency
Prime Coat Quality of Binder MTC should be provided.
Binder Temperature for application Three test per day
Rate of spread of binder Three test per day
Arrangements for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take all necessary measures
for the safety of traffic during construction and provide, erect and maintain such barricades, including signs, marking, flags, lights
and flagmen as per instruction of the Engineer-in-charge.
Measurement for Payment
Prime coat shall be measured in terms of surface area of application in Smt.
Providing and applying Tack coat with VG-30 Grade bitumen using bitumen pressure distributor at the rate of 0.20 kg/sqm on the
existing bituminous surface cleaned with Air Compressor etc (a) For D.B.M. (b) For B.C.
The work shall consist of the application of a single coat of low viscosity liquid bituminous material to existing bituminous or primed
granular surface preparatory to the superimposition of a bituminous mix as instructed by the Engineer.
The binder used for tack coat shall be low viscosity paving bitumen of VG 30 grade conforming to as per late.
Weather and Seasonal Limitations
Bituminous material shall not be applied during a dust storm or when the weather is foggy, rainy or windy or when the temperature
in the shade is less than 10°C.
The tack coat shall be applied by a self-propelled or towed bitumen pressure sprayer, equipped for spraying the material uniformly
at a specified rate. Hand spraying shall not be permitted except in small areas, inaccessible to the distributor, or narrow strips, shall
be sprayed with a pressure hand sprayer, or as directed by the Engineer.
Preparation of Base
The surface on which the tack coat is to be applied shall be cleaned of dust and any extraneous material before the application of
the binder, by using a mechanical broom or any other approved equipment/method as specified by the Engineer. The granular or
stabilized surfaces shall be primed with primer coat.
Application of Tack Coat
The application of tack coat shall be at the rate specified in Table 21-1, and it shall be applied uniformly. Paving bitumen if used for
tack coat shall be heated to appropriate temperature in bitumen boilers to achieve viscosity less than 2 poise. The method of
application of tack coat will depend on the type of equipment to be used, size of nozzles, pressure at the spray bar, and speed or
forward movement. The Contractor shall demonstrate at a spraying trial, that the equipment and method to be used is capable of
producing a uniform spray, within the tolerances specified.
Table 21-1 : Rate of Application of Tack Coat
Type of Surface Rate of Spray of Binder in Kg per sq. m
Bituminous surfaces (DBM/BC) 0.20-0.30
Granular surfaces treated with primer 0.25-0.30
Curing of Tack Coat
The tack coat shall be left to cure until all the volatiles have evaporated before any subsequent construction is started. No plant or
vehicles shall be allowed on the tack coat other than those essential for the construction.
Quality Control of Work
Control on the quality of materials and works shall be exercised by the Engineer as per Table 21-2.
Table 21-2 : Test and Frequency for Tack Coat
Type of Test Frequency
Quality of Binder MTC Should be provided.
Tack Coat Binder Temperature for Three test per day
Rate of spread of binder Three test per day
Arrangements for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take all necessary measures
for the safety of traffic during construction and provide, erect and maintain such barricades, including signs, marking, flags, lights
and flagmen as per instruction of the Engineer-in-charge.
Measurement for Payment
Tack coat shall be measured in terms of surface area of application in Smt.
Dense Graded Bituminous Macadam
Dense Graded Bituminous Macadam (Providing, Carting and laying of dense bituminous macadam with batch type HMP
producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous
binder VG-30 grade @ min 4.5% by weight of total mix, transporting the hot mix to work site, laying with a self-propelled paving
machine equipped with an electronic sensing device to the required grade, level and alignment, rolling with 8-10 tonne static
weight or vibratory roller or with a pneumatic tyre roller of 12 to 15 tonne weight to achieve the desired compaction as per
approved design mix .for Grading- II. (26.5 mm nominal size) As per MoRTH 5 Revision.
Only Laying of DBM using hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem rollers to achieve the desired compaction etc
The work shall consist of construction in a single or multiple layers of DBM on a previously prepared base or sub-base. The thickness
of a single layer shall be 50 mm to 100 mm which may vary as per site condition.
The bitumen shall be viscosity grade (VG-30) paving bitumen complying with the Indian Standard Specification As per latest codal
Coarse Aggregates
The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material retained on 2.36 mm sieve. They shall be
clean, hard, durable, of cubical shape, free from dust and soft or friable matter, organic or other deleterious substances. The
aggregates shall satisfy the requirements specified in Table 22-1 and these property of aggregate should be checked by the
Engineer-in-Charge and/or his authorized representative in the Mix Design submitted by the contractor.
Table 22-1 : Physical Requirements for Coarse Aggregate for Dense Bituminous Macadam
Property Test Specification Method of Test
Cleanliness Grain size analysis Max 5% passing IS: 2386 Part I
(dust) 0.075 mm sieve
Particle Combined Flakiness and Elongation Indices* Max 35% IS: 2386 Part I
Strength Los Angeles Abrasion Value or Max 35% IS: 2386 Part IV
Aggregate Impact Value
Durability Soundness either :Sodium Sulphate or Max 12% IS: 2386 Part V
Magnesium Sulphate
Water Water Absorption Max 2% IS: 2386 Part III
Stripping Coating and Stripping of Bitumen Aggregate Minimum retained IS:6241
Mix coating 95%
Water Retained Tensile Strength** Min 80% AASHTO
To determine this combined proportion, the flaky stone from a representative sample should first be separated out. Flakiness index is weight of flaky stone metal
divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index is weight of elongated
particles divided by total non-flaky particles. The values of flakiness index and elongation index so found are added up.
If the minimum retained tensile test strength falls below 80 percent, use of anti stripping agent is recommended to meet the requirement.
Where crushed gravel is proposed for use as aggregate, not less than 90 percent by weight of the crushed material retained on the
4.75 mm sieve shall have at least two fractured faces.
Fine Aggregates
Fine aggregates shall consist of crushed or naturally occurring mineral material, or a combination of the two, passing the 2.36 mm
sieve and retained on the 75 micron sieve. These shall be clean, hard, durable, dry and free from dust, and soft or friable matter,
organic or other deleterious matter. Natural sand shall not be allowed in binder courses. However, natural sand upto 50 percent of
the fine aggregate may be allowed in base courses.
Filter shall consist of finely divided mineral matter such as rock dust, hydrated lime or cement approved by the Engineer. The filler
shall be graded within the following limits :-
Table 22-2 : Grading Requirements for Mineral Filler
IS sieve (mm) Cumulative Percent Passing by Weight of Total Aggregate
The filler shall be free from organic impurities and have a plasticity Index not greater than 4. The Plasticity Index requirement shall
not apply if filler is cement or lime. 505.2.5 Aggregate
Grading and Binder Content
When tested in accordance with IS.2386 Part 1 (wet sieving method), the combined grading of the coarse and fine aggregates and
filler for the particular mixture shall fall within the limits given in Table 22-3 for grading 1 &
Table 22-3 : Composition of Dense Graded Bituminous Macadam
Nominal aggregate size* 37.50
Layer Thickness 75-100 mm 50 - 75 mm
IS Sieve1 (mm) Cumulative % by weight of total aggregate passing
Bitumen content % by mass of total mix Min 4.0** Min 4.5**
* The nominal maximum particle size is the largest specified sieve size upon which any of the aggregate is retained.
** Corresponds to specific gravity of aggregates being 2.7. In case aggregate have specific gravity more than 2.7, the minimum bitumen content can be reduced
proportionately. However, the rate reduction/amount will be recovered due to the difference in binder content in the DBM item. Also the
Premium / discount of the tender will be applicable in this rate reduction or the amount to be recovered due to reduced binder content. Further the region where
highest daily mean air temperature is 30°C or lower and lowest daily air temperature is - 10°C or lower, the bitumen content may be increased by 0.5 percent. No
extra payment will be done if the binder content is more than the minimum quantity specified in the table.
Bitumen content indicated in above Table is the minimum quantity. The quantity shall be determined in accordance with Clause of
The bitumen content required shall be determined following the Marshall mix design procedure contained in Asphalt Institute
The Fines to Bitumen (F/B) ratio by weight of total mix shall range from 0.6 to 1.2.
Requirements for the Mix
Apart from conformity with the grading and quality requirements for individual ingredients, the mixture shall meet the
requirements set out in Table 22-4.
Table 22-4 : Requirements for Dense Graded Bituminous Macadam
Viscosity Grade Paving Bitumen Test Method
Compaction level 75 blows on each face of the specimen
Minimum stability 9.0 AASHTO T245
Marshall flow (mm) 2-4 AASHTO T245
Marshall Quotient 2-5 MS-2 and ASTM D2041
(Stability / flow)
% air voids 3-5
% Voids Filled with Bitumen 65-75
Coating of aggregate particle 95% minimum IS:6241
Tensile Strength ratio 80% Minimum AASHTO T
% Voids in Mineral Aggregate 11.0 –
The binder content shall be optimized to achieve the requirements of the mix set out in Table 19-4. The binder content shall be
selected to obtain 4 percent air voids in the mix design. The Marshall method for determining the optimum binder content shall be
adopted as described in the Asphalt Institute Manual MS-2.
Where maximum size of the aggregate is more than 26.5 mm, the modified Marshall method using 150 mm diametre specimen
described in MS-2 and ASTM D 5581 shall be used. This method requires modified equipment and procedures. When the modified
Marshall test is used, the specified minimum stability values in shall be multiplied by 2.25, and the minimum flow shall be 3 mm.
Minimum Percent Voids In Mineral Aggregate (VMA)
Nominal Maximum Particle Size1 Minimum VMA Percent Related to Design Percentage Air
Note : Interpolate minimum voids in the mineral aggregate (VMA) for designed percentage
Job Mix Formula
The Contractor shall submit to the Engineer for approval at least 21 days before the start the work, the job mix formula proposed
for use in the works, together with the following details:
i) Source and location of all materials;
ii) Proportions of all materials expressed as follows:
a) Binder type, and percentage by weight of total mix;
b) Coarse aggregate/Fine aggregate/Mineral filler as percentage by weight of total aggregate including mineral filler;
iii) A single definite percentage passing each sieve for the mixed aggregate;
iv) The individual gradings of the individual aggregate fraction, and the proportion of each in the combined grading;
v) The results of mix design such as maximum specific gravity of loose mix (Gmm), compacted specimen densities,
Marshall stability,flow, air voids, VMA, VFB and related graphs and test results of AASHTO T 283 Moisture susceptibility
vi) Where the mixer is a batch mixer, the individual weights of each type of aggregate, and binder per batch;
vii) Test results of physical characteristics of aggregates to be used;
viii) Mixing temperature and compacting temperature.
While establishing the job mix formula, the Contractor shall ensure that it is based on a correct and truly representative sample of
the materials that will actually be used in the work and that the mix and its different ingredients satisfy the physical and strength
requirements of these Specifications.
Approval of the job mix formula shall be based on independent testing by the Engineer for which samples of all ingredients of the
mix shall be furnished by the Contractor as required by the Engineer.
The approved job mix formula shall remain effective unless and until a revised Job Mix Formula is approved. Should a change in the
source of materials be proposed, a new job mix formula shall be forwarded by the Contractor to the Engineer for approval before
the placing of the material.
Permissible variation from job mix formula:
It shall be the responsibility of the Contractor to produce a uniform mix conforming to the approved job mix formula subject to the
permissible variations of the individual percentages of the various ingredients in the actual mix from the job mix formula to be used
within the limits as specified in below Table.
Table 22-5 : Permissible Variations in the Actual Mix from the Job Mix Formula
Description Base/binder Course
Aggregate passing 19 mm sieve or larger ±8%
Aggregate passing 13.2 mm, 9.5 mm ±7%
Aggregate passing 4.75 mm ± 6%
Aggregate passing 2.36 mm, 1.18 mm, 0.6 mm ±5%
Aggregate passing 0.3 mm, 0.15 mm ±4%
Aggregate passing 0.075 mm ±2%
Binder content ± 0.3%
Mixing temperature ± 10°C
Construction Operations
Preparation of Base
The base on which Dense Bituminous Macadam is to be laid shall be prepared, shaped and conditioned to the specified lines, grades
and cross sections as directed by the Engineer. The surface shall be thoroughly swept clean free from dust and foreign matter using
mechanical broom and dust removed or blown off by compressed air. In portions where mechanical means cannot reach, other
approved method shall be used. A priming coat where needed, shall be applied as directed by the Engineer
Where the material on which the dense bituminous macadam is to be laid is other than a bitumen bound layer, a prime coat shall be
applied, as specified in the tender specification or as directed by the Engineer.
Where the material on which the dense bituminous macadam is to be laid is either bitumen bound layer or primed granular layer,
tack coat shall be applied, as specified in the tender specification or as directed by the Engineer.
Mixing and Transportation of the Mix
Pre-mixed bituminous materials shall be prepared in a hot mix plant of adequate capacity and capable of yielding a mix of proper
and uniform quality with thoroughly coated aggregates. Appropriate mixing temperatures are given in Table 22-6 of these
Specifications, the difference in temperature between the binder and aggregate shall at no time exceed 14°C. In order to ensure
uniform quality of the mix and better coating of aggregates, the hot mix plant shall be calibrated from time to time.
Table 22-6 : Mixing, Laying and Rolling Temperatures for Bituminous Mixes (Degree Celcius)
Bitumen Viscosity Bitumen Temperature Aggregate Mixed Material
Grade Temperature Temperature
Bituminous materials shall be transported in clean insulated and covered vehicles. An asphalt release agent, such as soap or lime
water, may be applied to the interior of the vehicle to prevent sticking and to facilitate discharge of the material.
The mix transported from the hot mix plant to the site shall be spread by means of a self-propelled paver with suitable screeds
capable of spreading, tamping and finishing the mix to specified grade, lines and cross-section. The paver finisher shall have the
following essential features:
(a) Loading hoppers and suitable distributing mechanism.
(b) All drives having hydrostatic drive/control.
(c) The machine shall have a hydraulically extendable screed for appropriate width requirement.
(d) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it is spread without rutting of
otherwise marring the surface. It shall have adjustable amplitude and variable frequency.
(e) The paver shall be equipment with necessary control mechanism so as to ensure that the finished surface is free from surface
(f) The paver shall be fitted with an electronic sensing device for automatic levelling and profile control within the specified
(g) The screed shall have the internal heating arrangement.
(h) The paver shall be capable of laying either 2.5 to 4.0 m width or 4.0 to 7.0 m width as stipulated in the Contract.
(i) The paver shall be so designed as to eliminate skidding/slippage of the tyres during operation.
However, in restricted locations and in narrow widths where the available equipment cannot be operated in the opinion of the
Engineer, he may permit manual laying of the mix. Similarly for smaller jobs, mechanical paver may be used with the approval of the
The temperature of mix at the time of laying shall be more than 120 ° C.
Mixes with a temperature of less than 120° C shall not be put into paver spreader. Longitudinal joints and edges shall be
constructed true to the delineating lines parallel to the centre line of the road. Longitudinal and transverse joints shall be offset by
at least 250 mm from those in the lower courses and the joint on the top most layer shall not be allowed to fall within the wheel
path. All transverse joints shall be cut vertically to the full thickness of the previously laid mix with asphalt cutter and the surface
painted with hot bitumen before placing fresh material. Longitudinal joints shall be preferably hot joints. Cold longitudinal joints
shall be properly heated with joint heater to attain a suitable temperature of about 80 ° C laying of adjacent material.
After spreading the mix by paver, it shall be thoroughly compacted by rolling with a set of rollers moving at a speed not more than
km/h, immediately following close to the paver. Generally the initial or breakdown rolling shall be done with 80-100 kN static weight
smoothwheeled roller. The intermediate rolling shall be done with 80-100 kN static weight vibratory roller or with a pneumatic
tyred roller of 150-250 kN weight having a tyre pressure of at least 0.7 MPa. The finish rolling shall be done with 60-80 kN weight
smooth wheeled tandem roller. All the compaction operations, i.e., breakdown rolling and intermediate rolling can be accomplished
by using vibratory tandem roller of 80-100 kN static weight. During initial breakdown rolling and finish rolling, no vibratory
compaction shall be resorted to. The exact pattern of rolling shall be established after trial compaction as approved by the Engineer.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be corrected at once as
specified and/or removed and made good. The rollers shall not be permitted to stand on pavement which has not been fully
compacted and where temperature is still more than 70 ° C. Necessary precautions shall be taken to prevent dropping of oil, grease,
petrol or other foreign matter on the pavement either when the rollers are operating or standing.
The wheels of roller shall be kept moist to prevent the mix from adhering to them. But in no case shall fuel/lubricating oil be used
for this purpose nor excessive water poured on the wheels. Rolling shall commence longitudinally from edges and proceed towards
the centre, except that on superelevated and unidirectional cambered portions, it shall progress from the lower to upper edge
parallel to the centre line of the pavement. The roller shall proceed on the fresh material with rear or fixed wheel leading so as to
minimise the pushing of the mix and each pass of the roller shall overlap the preceding one by half the width of the rear wheel.
Rolling shall be continued till the proper density is achieved and all roller marks are eliminated. Skin patching of an area that has
been rolled will not be permitted. Rolling operations shall be completed in all respects before the temperature of the mix falls below
Opening to Traffic
It shall be ensured that the traffic is not allowed on the surface until the dense bituminous layer has cooled to the ambient
Surface Finish and Quality Control of Work
Surface evenness:
The surface finish of construction shall conform to the requirements of As Per Morth.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 22-7.
Table 22-7 : Control Tests for Bituminous Works and their Minimum Frequency
Type of Test Frequency (Min.)
Quality of binder Material Testing Certificate (MTC) is required
from IOC as per number of samples per lot.
Dense Bituminous Aggregate Impact Value/ Los One test per 100 cu.m of aggregate for each
Macadam / Angeles Abrasion Value source and whenever there is change in the
Bituminous quality of aggregate
Concrete Flakiness and Elongation One test per 100 cu.m of aggregate for each
Indices source and whenever there is change in the
quality of aggregate
Water absorption of One test for each source and whenever there is
aggregates change in the quality of aggregate
Mix grading One test per 200 cmt subject to minimum of
two tests per day per plant.
Marshall stability and voids Three tests for stability, flow value, density and
analysis of mix void contents for each 400 tonne of mix subject
to minimum of two tests per day per plant.
Temperature of binder in At regular intervals
boiler, aggregate in dryer and
mix at the time of laying and
Binder content One set for each 400 tonnes of mix subject to
minimum of two tests per day per plant
Density of Compacted layer One test per 300 mt length of road
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor shall take all necessary measures
for the safety of traffic during construction and provide, erect and maintain such barricades, including signs, marking, flags, lights
and flagmen as per instruction of the Engineer-in-charge.
Measurements for Payment
Dense Graded Bituminous Materials shall be measured as finished work in metric tonnes as indicated in the Contract documents, or
as otherwise directed by the Engineer. The rate shall be for a unit of one MT.
The contract unit rate for Dense Graded Bituminous Macadam shall be payment in full for carrying out all the required operations as
specified and shall include, to all components listed in Clause 501.8.8.2 of MoRTH 5 Revision. The rate shall include the provision of
bitumen, at 4 percent and 4.5 percent by weight of the total mixture for grading 1 and grading 2 respectively. The variation in actual
percentage of bitumen used shall be assessed and the payment adjusted plus or minus accordingly.
In addition to above, the contract unit rate of bituminous work shall also includes:
1. Finding of buried man hole during resurfacing activity if any
2. Cleaning of bitumen from all catch pits.
3. Submition of colored photographs of cleaned catch pits
4. Removal of all debris from site.
Note:- All aggregates used in the Hotmix material should be confirmed to the relevant standards and it should be procured from the
approved source/region specifically from the Sevaliya/Timba/Ankodiya area only. After completion of Bituminous concrete work,
90% amount of Bituminous concrete work will be released. Remaining 10% amount will be released after satisfactorily completion
of raising of all Machine holes & Catchpits of individual road included in the scope of work or tender.
Bituminous Concrete
Bituminous Concrete (Providing, Carting and laying of bituminous concrete with batch type hot mix plant producing an average
output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ min.
% of mix, transporting the hot mix to work site, laying with a self-propelled paving machine equipped with an electronic sensing
device to the required grade, level and alignment, rolling with 8-10 tonne static weight or vibratory roller or with a pneumatic
tyre roller of 12 to 15 tonne weight to achieve the desired compaction as per approved design mix. for Grading- II (13.2 mm
nominal size) As per MoRTH 5 Revision.
Producton of BC as Above.
Carting of BC from Plant to Paver Site.
Laying of BC using hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction etc
This work shall consist of construction of Bituminous Concrete, for use in wearing and profile corrective courses. This work shall
consist of construction in a single layer of bituminous concrete on a previously prepared bituminous bound surface. A single layer
shall be 30 mm/40 mm/50 mm thick and it can vary depending upon the site condition.
The bitumen shall be viscosity grade (VG-30) paving bitumen complying with the Indian Standard Specification IS:73.
Coarse Aggregates
Clause of Dense Bituminous Macadam (DBM) shall apply. The aggregates shall satisfy the requirements specified in Table 24 -1 and
these property of aggregate should be checked by the Engineer-in-Charge and/or his authorized representative in the Mix Design
submitted by the contractor.
Table 23-1 : Physical Requirements for Aggregate for Bituminous Concrete
Property Test Specification Method of Test
Cleanliness Max 5% passing
(dust) Grain size analysis mm IS: 2386 Part I
Particle shape Combined Flakiness and
Max 35% IS: 2386 Part I
Elongation Indices*
Strength Los Angeles Abrasion Value or Max 30% IS: 2386 Part IV
Aggregate Impact Value
Durability Soundness either :Sodium Max 12% IS: 2386 Part V
Magnesium Sulphate Max 18%
Polishing Polished Stone Value Min 55 BS:812-114
Water Water Absorption Max 2% IS: 2386 Part III
Stripping Coating and Stripping of Minimum retained IS:6241
Bitumen Aggregate Mix coating 95%
Water Retained Tensile Strength** Min 80% AASHTO
To determine this combined proportion, the flaky stone from a representative sample should first be separated out. Flakiness index is weight of flaky stone metal
divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index is weight of elongated
particles divided by total non-flaky particles. The values of flakiness index and elongation index so found are added up.
If the minimum retained tensile test strength falls below 80 percent, use of anti stripping agent is recommended to meet the requirement.
Fine Aggregates
Clause of Dense Bituminous Macadam (DBM) shall apply.
Clause of Dense Bituminous Macadam (DBM) shall apply.
Grading and Binder Content
When tested in accordance with IS.2386 Part 1 (wet sieving method), the combined grading of the coarse and fine aggregates and
filler for the particular mixture shall fall within the limits given in Table 24-2 for grading 1 &
Table 23-2 : Composition of Bituminous Concrete.
Nominal aggregate size* 19.0 mm 13.2 mm
Layer Thickness 50 mm 30 - 40 mm
IS Sieve1 (mm) Cumulative % by weight of total aggregate passing
Bitumen content % by mass of Min 5.2** Min 5.4**
* The nominal maximum particle size is the largest specified sieve size upon which any of the aggregate is retained.
** Corresponds to specific gravity of aggregates being 2.7. In case aggregate have specific gravity more than 2.7, the minimum bitumen content can be reduced
proportionately. However, the rate reduction/amount will be recovered due to the difference in binder content in the BC item. Also the Premium / discount of the
tender will be applicable in this rate reduction or the amount to be recovered due to reduced binder content. Further the region where highest daily mean air
temperature is 30°C or lower and lowest daily air temperature is - 10°C or lower, the bitumen content may be increased by 0.5 percent. No extra payment will be
done if the binder content is more than the minimum quantity specified in the table.
Bitumen content indicated in above Table is the minimum quantity. The quantity shall be determined in accordance with Clause of
Requirements for the Mix
Clause of Dense Bituminous Macadam (DBM) shall apply.
The binder content shall be optimized to achieve the requirements of the mix set out in Table.
Clause of Dense Bituminous Macadam (DBM) shall apply.
Job Mix Formula
Clause of Dense Bituminous Macadam (DBM) shall apply.
Permissible variation from job mix formula:
It shall be the responsibility of the Contractor to produce a uniform mix conforming to the approved job mix formula subject to the
permissible variations of the individual percentages of the various ingredients in the actual mix from the job mix formula to be used
within the limits as specified in below Table.
Table 23-3 : Permissible Variations in the Actual Mix from the Job Mix Formula
Description Base/binder Course
Aggregate passing 19 mm sieve or larger ±7%
Aggregate passing 13.2 mm, 9.5 mm ±6%
Aggregate passing 4.75 mm ± 5%
Aggregate passing 2.36 mm, 1.18 mm, 0.6 mm ±4%
Aggregate passing 0.3 mm, 0.15 mm ±3%
Aggregate passing 0.075 mm ±1.5%
Binder content ± 0.3%
Mixing temperature ± 10°C
Construction Operations
Preparation of Base
The base on which Bituminous Concrete is to be laid shall be prepared, shaped and conditioned to the specified lines, grades and
cross sections as directed by the Engineer. The surface shall be thoroughly swept clean free from dust and foreign matter using
mechanical broom and dust removed or blown off by compressed air. In portions where mechanical means cannot reach, other
approved method shall be used as per instruction of Engineer-in-Charge and/or his authorized representative.
Where the material on which the Bituminous Concrete is to be laid, tack coat shall be applied, as specified in the tender
specification or as directed by the Engineer.
Mixing and Transportation of the Mix
Clause of Dense Bituminous Macadam (DBM) shall apply.
Clause of Dense Bituminous Macadam (DBM) shall apply.
Clause of Dense Bituminous Macadam (DBM) shall apply.
Opening to Traffic
It shall be ensured that the traffic is not allowed on the surface until the bituminous concrete layer has cooled to the ambient
Surface Finish and Quality Control of Work
Surface evenness:
The surface finish of construction shall conform to the requirements of Clause In MoRTH.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table in DBM clause.
Arrangement for Traffic
Clause of Dense Bituminous Macadam (DBM) shall apply.
Measurements for Payment
Bituminous Concrete shall be measured as finished work in metric tonnes as indicated in the Contract documents, or as otherwise
directed by the Engineer. The rate shall be for a unit of one MT.
The contract unit rate shall be all as specified in Clause 504.9 of MoRTH 5 Revision, except that the rate shall include the provision
of bitumen at 5.2 percent & 5.4 percent for grading 1 and grading 2 by weight of total mix respectively. The variation in actual
percentage of bitumen used will be assessed and the payment adjusted plus and minus accordingly.
In addition to above, the contract unit rate of bituminous work shall also includes:
1. Finding of buried man hole during resurfacing activity if any
2. Cleaning of bitumen from all catch pits.
3. Submition of colored photographs of cleaned catch pits
4. Removal of all debris from site.
Note:- All aggregates used in the Hotmix material should be confirmed to the relevant standards and it should be procured from the
approved source/region specifically from the Sevaliya/Timba/Ankodiya area only. After completion of Bituminous concrete work,
90% amount of Bituminous concrete work will be released. Remaining 10% amount will be released after satisfactorily completion
of raising of all Machine holes & Catchpits of individual road included in the scope of work or tender.
Providing and laying Asphalt painting on B.T. surface immediately after laying work complete with all respect, using bitumen
grade 60/70 (VG-30) @ rate of 5 kg/10 smt by Mechanical sprayer and spreading the stone dust on prepared surface at the rate
of 0.03 cum/10 smt. and rolling with smooth wheeled and penumatic roller and brushing etc. comp.
For detailed specification refer the specification of IS Code & MoRTH except materials mentioned in said Items
The Bitumin grade 60/70 ( VG-40 & VG-30) at a rate of 0.5 Kg/ Smt instead of 80/100 ( VG-10 ) at a rate of 0.2 Kg/ Smt and
spreading the stone dust on prepared surface at the rate of 0.03 cum/10 smt. and rolling with smooth wheeled and pneumatic roller
and brushing etc. as directed by Engineer-in-Charge and/or his authorized representative.
The rate shall be for a unit of one sq. meter
Repairing damaged M.H. and raising M.H. up to road level incl. removing damaged brick work and repairing by brick masonry in
C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the debris from MH and carting the
same as directed.(a)upto 0.15mt.(@Two coarse)(b)upto to 0.35mt.(@Four coarse (c)upto 0.65 mt.(@seven Coarse) (d)upto
0.90mt.(@Ten Coarse)
This item relates to repairing work of above item of machine hole with fixing existing seat at top & fixing pre-cast FRC cover
(medium duty) repairing up to 2.00 mt. depth. This item relates to repairing existing machine hole of 1.40 x 1.00 or 1.00 x 0.75 mt.
size with removing first existing seat & cover including demolishing existing loose masonry work up to from GF level to depth if
specified & up to same height brick work in CM 1:5 shall be completed & after of that work plastering work in CM 1:3 shall also be
done. Rate including fixing existing or new (if not there) C.I. steps shall fixed at time of masonary work. After completion of brick
work & plastering same machine hole seat & cover fixing at top & casted it in C.C. 1:2:4 etc. Measurements shall be given on no. of
basis up to 2.00 mt. depth work.
For detailed specification refer R & B Department booklet for General Technical Specification for building works.
Items also includes:
1. Proper Barricading to avoid accidents.
2. Removal of debris from site.
3. Compaction of Bitumen by Roller.
4. Applying tack coat before laying of Hotmix material.
The mode of payment for this item shall be on No. Basis.
Raising of Existing machine hole. Item includes, cutting of existing road surround by Machine hole by diamond cutter machine,
dismantling of road in confined area by breaker machine and carting of dismantled material. Item also included necessary brick
work to raise the machine hole at road level in CM 1:3. Item also included fixing of Machine hole frame at exact road level by
using Master Emaco S 488 trowelable fibre reinforced thixotropic repair mortar material, Laying of concrete made from
MasterEmaco S 346 flowable micro concrete material in desired thickness and laying of hot mix bituminous material in upper
layer and compaction of hot mix bituminous material by Plate compactor machine. Rate also included necessary plaster at inside
of machine hole in CM 1:3 in 20 mm thickness on raised brickwork.
For relevant Specification of Item No. 27 shall be apply and as per item description & instruction of Engineer-in-Charge and/or his
authorized representative.
The mode of payment for this item shall be on No. Basis.
Providing & Supplying ISI Standard RCC pipes (of sulphate resisting cement) in a standard lengths of following class & dia meter
suitable for socket-spigot type including all taxes , insurance, transporation, freight charges, octroi, inspection charges, loading,
unloading, conveyance to departmental stores, staking etc complete (IS 458:1989) Class NP-3, test pressure 0.7/kg/sqcm. Rate
also includes supplying RCC collar for RCC pipes including taxes, carting, loading, unloading, etc complete. Including labour work
for lowering, laying, jointing, RCC pipes in CM 1:1 1/2 of following diameters in proper position, grade and alignent at all as
directed by engineer in charge. inlcuding conveyance from store to site of work labour giving hydraulic testing and all necessary
testing as per IS code .(GWSSB SOR-2022-23, page no:15, Item no:10.2.A & 10.3 & section part 1&2 B labour section, item
no:11.B) (RCC pipe Horizontal cast) (a) 300 mm internal diameter (b) 450 mm internal diameter (c) 600 mm internal diameter.
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or his authorized representative.
The mode of payment for this item shall be on RMT. Basis.
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
a. F.R.C. Extra Heavy Duty (EHD-35) Machine hole Covers. Cover : 728mm ø & 100 mm thick circular cover, 35.00 MT load design,
100x2mm MS flat allround, 16mm ø plain round bar for lifting the cover & should be fitted with plastic cups.
Cover shall be well casted and having good finishing. It shall be made from M300 grade.Concrete with more than 0.5% fiber by
weight of concrete as mention in IS:12592:2002. Three coats of Black bituminous / anticorrosive paint must be applied on back side
of covers. Each cover and frame shall be marked with manufactures trade mark / loading grade, month and year of manufacturing
(marking shown in IS:12592:2002). The cover should be embossed with chequered design. Transportation expenses will be borne by
the contractor. IS:12592:2002 shall be followed for Production and Testing of Frame and cover. The sectional weight of concrete of
each item should be 2400 to 2500 kg./cu.m.
The rate shall be for a unit of per Nos.
Providing and fixing cast iron machine hole frame of weight 80 to 85 kg suitable for existing EHD-35 FRC MH cover, rate also incl.
loading, unloading and fixing the frame in line and level to match existing road level in C.C. 1:2:4 and finishing smooth,
watering and protecting for 7 days etc. complete as per instruction by engg. in charge.
The Item shall be carried as per Item mentioned in tender document and as per instruction of Engineer-in-Charge and/or his
authorized representative.
The mode of payment for this item shall be on Kgs. Basis based on actual weight of Machine hole frame.
Constructing Bombay Pattern Type Catch Pit of size 600 mm x 600 mm & depth up to 1000 mm including excavation, B.B.C.C.
(1:5:10), 23 cms thick brick masonry wall in the prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and
mm thick cement plaster inside the catch pit in the proportion of CM (1:3) without jali etc. comp. as directed by E.I.C.
600mm x 600mm x 1000mm Depth
For detailed specification refer clause No. 24.44.1 of R & B Department booklet for General Technical Specification for building
• Extra Depth of Catch pit size 600mm x 600mm for every additional depth of 100 mm or Part thereof beyond
1000mm depth upto 1500 mm depth
For detailed specification refer clause No.24.46 of R & B Department booklet for General Technical Specification for building works.
Mode of measurement and payment
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He shall also be responsible for the
cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
Catch Pit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc. comp.. As directed by Engineer-in-Charge
and/or his authorized representative.
For detailed specification refer clause No. 24.35 of R & B Department booklet forGeneral Technical Specification for building works.
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He shall also be responsible for the
cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
Paver Block Providing and laying shot blasted Non - interlocking, Paver blocks of specified thickness, size,
grade of concrete and colour machine made and blasting by automatic shot blasting machine and high
density of as per approved sample of approved make for footpath, parking areas, service lanes,cross over and other
areas as mentioned in the drawing. Including providing and laying 50 mm thick averave bedding layer of coarse sand
below paver block as per required grading and specification. Laid paver block shall be mechanically compacted. The
work of the paving blocks shall be executed in line and level by skilled mason of flooring work only. Small size of paver
block with same specification shall be used at residue or at end. It should be laid in such a way that the no cutting of the
paver block to be necessary. If cutting of paver block shall be required , than cut by machine only and laying to
be done by skilled flooring mason. The finished surface of the paver block shall have coarse sand Texture Finish.
Pave blocks shall be compacted and shall be re- laid if necessary. Actual laid area shall be measured and
paid without any wastage. (A) 60 mm thick M-35 grade Grey Paver block of size
200mm x 200mm.(AMC approved rate)
1.0 The scope of work: It includes supplying and laying of Precast shot blasted by automatic shot blasting machine in factory (not on
site) paver blocks at footpath, parking area, service lane and other areas.
The work includes:
1.1 Paver block should be laid over prepared sub grade.
1.2 Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
1.3 Manufacturing of paver blocks by one of the approved suppliers as per requirements intechnical specification enclosed.
1.4 Supplying of paver blocks at site, including handling at both ends. The type of paver block may be interlocking or non-
1.5 Providing and laying average 50 mm coarse sand bedding for laying blocks.
1.6 Laying of paver blocks at site as per requirement in technical specification, within shortest possible time.
1.7 Testing of paver blocks through reputed Govt. /Non Govt. Test house and submission of test results as per requirements in
Technical Specifications. Client reserves the right to carryout test at random. Cost for such tests to be borne by contractor.
1.8 The contractor shall guarantee that all material and components designed, fabricated, supplied and laid by him shall be free
from any type of defect due to faulty material and/or workmanship/erection for a period of five year from the date of completion of
work at individual sites. However, the contractor for five years shall render free maintenance.
2.0 Technical Specifications:
2.1 Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of compaction by application of
hydraulic compaction and also by high intensity vibration to the moulds. The machine should have automatic control panel for
uniformity in strength.
Concrete Batching & Mixing Plant: (Not essential) The concrete Mix Design should be followed for each batch of materials. The
concrete ingredient should be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should
be equipped with automatic control panel for maintaining water cement ratio from batch to batch to obtain concrete of uniform
quality and strength.
The plant should be equipped with adequate mechanism for mechanized loading of raw materials into mixer and conveyor belt for
transportation of concrete from mixer to concrete block making machine to maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks. Steam curing facility of the paver
blocks is preferable.
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1) Systematic record of test results of various paver blocks manufactured in the factory.
(2) Concrete Mix Design for various grade of concrete used for making of paver blocks.
2.2 Specifications for Coloured Paver Blocks:
Colour concrete paver blocks shall be manufactured as per attached specifications using approved colour Pigment of iron oxide of
approved brand like Bayer, Tata etc. with minimum colour pigment of 3% by weight of cement. The colour shade shall be as selected
by Architect before commencement of the work. The job also includes providing 50 mm thick sand bedding to match the shade of
the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the date of laying of the
All other technical specifications & Procedure for testing, laying & sampling of Color pavers will be as per attachment.
2.3 Paver Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should be retained until the laying.
The surface should be reasonably smooth and of anti skid and anti glare type. The paver should have uniform chamfers to facilitate
easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after vibration on the paver
The concrete mix design should be followed for each batch of materials separately and automatic batching plant is to be used to
achieve uniformity in strength and quality.
The pavers shall be manufactured in Double layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of the surface and adequate
compaction of the sand in the joints.
2.4 Paver Block Dimensions:
Layers Double layered, top layer minimum 8 to 10 mm
Shape Irregular (Uniform Shape with no Hollow Or Cracks) / as per drawing
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey Colour without use of any pigment.
For Colour pavers refer “specifications for Colour pavers”
Dimensional (+/-) 2mm for length & width,
Tolerance (+/-) 3mm for Height (Thickness)
2.5 Testing of Paver Blocks:
* Sampling and testing procedure as per enclosed specifications
3.0 Sampling & Testing Procedures for Paver Blocks:
3.1 Sample Size:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and water absorption.
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
3.2 Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with Appendix-B. The average
compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per thickness.
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles).
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles).
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979: Part I (Specifications for Concrete
Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than 10000 blocks, shall be divided
into five approximately equal groups. One block shall be drawn from each group i.e. 3 for internal testing and 2 for external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way that the designated sections of
part thereof, and the consignment represented by the sample, are clearly defined.The sample shall be dispatched to the approved
test laboratory taking precaution to avoid damage to the paving in transit. Protect the paving from damage and contamination until
they have been tested. The testing shall be carried as soon as possible, after the sample has been taken. As soon as practicable after
sampling. The samples shall be stored in water at 20 degree C for 24 hours prior to testing.
SR.NO. * TEST SPECIFICATION Average Values
(Average of Minimum Five Samples/Site)
1. Compressive Strength Min. 30 N/Sq.mm for 60mm thick and Min. 40 N/Sq.mm
2. Flexural Strength Minimum 3.80 N/Sq.mm and 4.5 N/ Sq. mm for 60 and
mm thick paver block respectively.
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Content 380 Kg/Cum for M 30 concrete and 430 Kg/Cum for M 40 concrete
3.0 Sampling & Testing Procedures for Paver Blocks:
3.1 Sample Size:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and water absorption.
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
3.2 Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with Appendix-B. The average
compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per thickness.
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles).
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles).
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979: Part I (Specifications for Concrete
Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than 10000 blocks, shall be divided
into five approximately equal groups. One block shall be drawn from each group i.e. 3 for internal testing and 2 for external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way that the designated sections of
part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the paving in transit. Protect
the paving from damage and contamination until they have been tested. The testing shall be carried as soon as possible, after the
sample has been taken. As soon as practicable after sampling. The samples shall be stored in water at 20 degree C 5 degree C for
24 hours prior to testing.
Test For Compressive Strength:
Testing Machine: The testing machine shall be of suitable capacity for the test and capable of applying the load of the rate specified.
It shall comply, as regards repeatability and accuracy, with the requirements of clause 2.1 of BS: 1881-Part
Procedure: The sample specimen shall be tested in a wet condition after being stored for at least 24 hours in water maintained at a
temperature of 20 C + or – 5 C. Before thespecimens are submerged in water, the necessary area shall be determined.
The plates for testing machines shall be wiped clean and any loose grit or other material removed from the contact faces of the
specimen. Plywood, nominally 4 mm thick shall be used as packing between the upper and lower faces of the specimen and the
machine plates and these boards shall be larger than the specimen by the margin of at least 5 mm
at all points. Fresh Packing shall be used for every specimen tested.
The specimen shall be placed in the machine with the wearing surface in the horizontal plane and in such a way that the axes of the
specimen are aligned with those of the machine plates.
The load shall be applied without shock and increased continuously at the rate of approximately 15 N/ Sq.mm per minute until no
greater load can be sustained. The maximum load applied to the specimen shall be recorded.
Calculation of corrected strength for individual Blocks: The compressive strength of each block specimen shall be calculated by
dividing the maximum load by full cross section area of the block and multiplying with an appropriate factor of:-
a) For 100 mm thick blocks –
b) For 80 mm thick blocks –
c) For 60 mm thick blocks –
Compressive Strength Calculation: The average corrected compressive strength for the designed block section shall be calculated.
4.0 Method of laying:
Blocks shall be placed on the sand bedding etc. which were well rammed so as to act as firm bed. Blocks shall be laid in such manner
that no gap shall be left in between. Blocks so laid shall be compacted by means of mechanical compactor or equivalent compacting
method so as to obtain required finished surface. All the joints shall be matched and if any manufacturing defect is detected the lot
shall be replaced and relaying shall be done with out any extra cost up to satisfaction of Engineer in charge.
50 to 80mm thick coarse sand shall be laid as cushioning layer for arranging the paver blocks. Joints of the paver blocks shall be filled
The paver blocks shall be laid properly on the prepared sub-base as per manufacturer's specification and as per Architect and
Engineer-in-charge's instruction.
Paver block shall be laid by the approved agency only. If manufacturer of the paver block providing the laying services, then it shall
be laid through the supplying agency only. The labourers for paver block fixing shall be skilled flooring mason only. Only cutting tool
shall be used for cutting the paver block. Full depth cutting toll shall be used for proper finished surface after cutting. Manual
cutting or breaking of the paver block is not permitted.
After laying of the paver block fine sand shall be spread over it and paver block shall be compacted with mechanical compactor. Any
settlement or undulation in the laid area shall be repaired immediately.
5.0 Mode of Measurement and payment:
Measurement shall be done as per actual area laid without considering any wastage.
The Measurement of the item shall be in Sqmt basis.
Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed / Fair finish / texture finish kerb stones of
approved make as per approved sample of any size and any type. Kerbs shall be fixed on the foundation prepared as per
approved design. The rate shall also include for erecting and fixing the pieces in position for complete kerb system with
chamfered type of kerbs including necessary accessories of kerb like radius kerb, angles and quadrant kerbs, droplet kerbs etc.
complete as per drawing. Kerb shall be fixed as paper joint without any jointing material. However cement mortar shall be
provided at the backside of kerb stone joint. (Sample must be approved) Cost of excavation, cutting , base , side filling shall
includes as directed engineer - incharge in above item description as per BOQ (a) 450 mm high median kerb*600*150mm
Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed / Fair finish / texture finish kerb stones of
approved make as per approved sample of any size and any type. Kerbs shall be fixed on the foundation prepared as per
approved design. The rate shall also include for erecting and fixing the pieces in position for complete kerb system with
chamfered type of kerbs including necessary accessories of kerb like radius kerbs, angles and quadrant kerbs, droplet kerbs etc.
complete as per drawing. Kerb shall be fixed as paper joint without any jointing material. However cement mortar shall be
provided at the backside of kerb stone joint. (Sample must be approved) Cost of excavation, cutting , base , side filling shall
includes as directed engineer - incharge in above item description as per BOQ (b) 380 mm high Footpath kerb*600*150mm
Material: (1) Water shall conform to M-1. (2) Cement shall conform to M-3. (3) Sand shall
conform to M-6. (4) Stone aggregate shall conform to M-12 (5) Pre cast kerb shall be of
approved make and as per approved sample.
1.0 Workmanship :
2.1 All Precast exposed/ fare finish/ texture finish kerb stones shall be of approved make.Sufficient curing shall be done before
placement of the same.
2.2 The method of transporting and placing the precast members shall be as approved by theArchitect and Engineer-in-charge.
Members shall be so transported that no breakage orundue stresses are induced in them.
2.3 The pits of the size 0.15 M in width and 0.23 M. in depth or as per site condition shall first be excavated, true to line and level.
The specifications for excavation shall be followed as per relevant item.
2.4 The pits shall be filled with a layer of 0.15 M. thick lean concrete M15. The kerbs shall be laid on existing PCC base in true line
and plumb. The specifications for PCC work shall be followed as per relevant item.
2.5 The rate shall also include for erecting and fixing the pieces in position for complete Kerb systems with Chamfered type of kerbs
including all type of necessary accessories of kerb like Radius Kerbs, Angles and Quadrant Kerbs, inlet kerb etc complete as per
The rate shall also include the flush pointing in CM (1:2) for all joints of the kerb stones.
3.0 Mode of Measurement & Payment:
3.1 The rate shall include the cost of material and labour for fixing the kerb system including laying, jointing and finishing but
excluding the cost of excavation, bitumen cutting, base PCC, zari filling with bitumen material
3.2 The Measurement of the item shall be in Rmt basis.
Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10- graded brick bat aggregates 40mm nominal size) and
curing complete.
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials and watered and rammed as
directed. The proportion of cement, sand and hand broken stone aggregates shall be one part of cement, 5 parts of coarse sand,
parts of hand broken stone aggregates and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at the
site of work. Hand mixing may however be allowed for smaller quantity of work if approved by the Engineer-incharge. When hand
mixing is permitted by the Engineer-in charge in case of breakdown of machinery’s and in the interest of the work. it shall be carried
out on a water tight platform and care shall be taken to ensure that mixing is continued until the mass is uniform in colour and
consistency. The quantity of water shall be sufficient to produce a dense concrete of required workability for the purpose. The
concrete shall be handled from the place of mixing to the final position in not more than 15 minutes by the method as directed and
shall be placed into its final position, compacted and finished within 30 minutes of mixing with water i.e. before the setting
commences. The concrete shall be laid in layers of 15 cms. to 20 cms. The concrete shall be rammed with heavy iron rammers and
rapidly to get the required compaction and to allow all the gaps to be filled with mortar. After the final set, the concrete shall be
kept continuously wet, if required by pounding for a period of not less than 7 days from the date of placement The concrete shall be
measured for its length breadth and depth, limiting dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Road marking with hot applied thermoplastic paints with reflectorising glass beads on bitumin surface providing and laying a hot
applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250gms per sqm area, thickness of 2.5mm is
excluding of surface applied glass beds as per IRC:35-2015. The finished surface to be level, uniform and free from streaks and
holes.zebra patta /bump patta lane/center line/ edge line/cut patta. The white color marking should provide liminance
coefficinet on cement road shall be min 130 mcd/m2/lux and Asphalt road shall be min100mcd/m2/lux during the service life
during the daytime.The marking should meet the performance criteria for night time reflectivity,wet reflectivity and skid
resistance as mentioned in the section-15of IRC35-2015.Warranty for the Retro reflectivity should be two years.
The colour, width and layout of road markings shall be in accordance with the code of practice of Road Markings with paints, IRC:
35:1997 and specified in the drawings or as directed by the Engineer.
Road marking shall be of hot applied thermoplastic compound and reflectorised paint specified in the item and the material shall
meet the requirements as specified below.
1.3 Hot Applied Thermoplastic Road Marking
(i) The work under this section consists of marking traffic stripes using a thermoplastic compound meeting the requirements
specified herein.
(ii) The Thermoplastic compound shall be screeded /extruded or to the pavement surface in amolten state by suitable machine
capable of controlled preparation and laying with surface application of glass beads at a specific rate. Upon cooling to ambient
pavement temperature, it shall be produce an adherent pavement marking of specified thickness and width and capable of resisting
deformation by traffic.
(iii) The colour of the compound shall be white or yellow (IS colour no. 356) as specified in the drawings or as directed by the
1.3.2 Thermoplastic materials
1.3.2.1 General:
The thermoplastic material shall be homogeneously composed of aggregate, pigment, resins and glass reflectorizing beads.
1.3.2.2 Requirement:
I composition the pigment, beads and aggregate shall be uniformly dispersed in the resin. The material shall be free from all skins,
dirt and foreign objects and shall comply with requirements indicated in MoRTH Table 800:-3.
Table 800-3 PROPORTIONS OF CONSTITUTENTS OF MARKING MATERIAL
(Percentage by weight)
Component White Yellow
Binder 18.0 min. 18.0 min.
Glass Beads 30 - 40 30 -
Titanium dioxide 10.0 min. -
Calcium 42.0max. See
Yellow pigments - Note
Note: Amount of yellow pigment, calcium carbonate and inert fillers shall be at the option of the manufacturer, provided all other
requirement of this specification are
II Properties :
The properties of thermoplastic material, when tested in accordance with ASTM 036/IS-3262 (Part-I) shall be as below:
White: Daylight luminance at 45 degree 65 percent min. as per AASHTO M
B) Drying time:
When applied at a temperature specification by the manufacturer and to the required thickness, the material shall set to bear traffic
in not more than 15 minutes.
C) Skid resistance: not less than 45 as per BS
Cracking resistance at low temperature : The material shall show no cracks on application to concrete blocks.
E) Softening point: 102.5 + 9.5 C as per ASTM 0
F) Flow resistance: Not more than 25 percent as per AASHTO M
Yellowness index (for white thermoplastic paint) : not more than 0.12 as per AASHTOM
III Storage Life : The materials shall meet the requirement of there specifications for period of one year. The thermoplastic
material must also melt uniformly with no evidence of skins or un-melted particles for the one year storage period. Any material not
meeting the above requirements shall be replaced by the manufacturer I supplier I contractor.
IV Reflectorisation : shall be achieved by incorporation of beads the grading and other properties of the beads shall be as
specified in clause 803.4.3 of MORT&H specification.
V Marking: Each container of the thermoplastic material shall be clearly and indelibly marked with the following information.
The name, trademark or other means of identification of manufacturer. Batch number. Date of manufacture.(Colour (white
Maximum application temperature and maximum safe heating temperature.
VI Sampling and testing : The thermoplastic material shall be sampled and tested in accordance with the appropriate
ASTM/BS method. The contractor shall furnish to the employer a copy of certified test reports from the manufacturer of the
thermoplastic material showing results of all tests specified therein and shall certify that the materials meets all requirements of this
1.3.3 Reflectorizing glass beads:
1.3.3.1 General : The specification covers types of glass beads to be used for to production of reflectorised pavement markings.
Type 1 beads are those which are a constituent of the basic thermoplastic compound vide Table 800-3 and type-2 beads
are those which are to be sprayed on the surface vide clause 803.6.3
1.3.3.2 The glass beads shall be transparent, colourless and free from miliness, dark particles and excessive air inclusions. This shall
conform to the requirements spelt out in clause 803.4.3.3.
1.3.3.3 Specific requirements
Gradation : The glass beads shall meet the gradation requirements for the two types as given in Table 800-4.
TABLE 800-4 GRADATION REQUIREMENT FOR GLASS BEADS
Percent Retained
850 micron 5 to 20 0 to
600 micron - 5 to
425 micron 65 to 95 -
300 micron - 30 to
180 micron 0 to 10 10 to
Below 180 Micron 00 to
Roundness : The glass beads shall have a minimum of 70 percent true spires.
Refractive index: The glass beads shall have a minimum refractive index of 1.50.
Free flowing properties: The glass beads shall be free of hard lumps and clusters and shall dispense readily under any conditions
suitable for paints striping. They shall pass the free flow test.
1.3.3.4 Test methods : The specific requirement shall be tested with the following methods.
Free flow test: Spread 100 grams of beads evenly in a 100 mm diameter glass dish. Place the dish in a 250 mm inside diameter
desiccators which is filled within 25 mm of the top of a desiccators plate with sulphuric acid water solution (specific gravity 1.10)
cover the desiccators and let is stand for 4 hours at 20 to 29 degree C. Remove sample from desiccators, transfer beads to a pan and
inspect for lumps or clusters. Then pour heads into a clean dry glass funnel having a 100 mm stem and 6 mm orifice. If necessary,
initiate flow by lightly tapping the funnel. The glass spheres shall be essentially free of lumps and clusters and shall flow freely
through the funnel.
II. The requirements of gradation, roundness and refractive index of glass beads and the amount of glass beads obtained from
a reputed laboratory showing results of all tests specified therein and shall certify that material meets all requirements of this
specification. However, if so required, these tests may be carried out as directed by the engineer.
1.3.4 Application properties of thermoplastic material.
1.3.4.1The thermoplastic materials shall readily get screed/extruded at temperatures specified by the manufacturers for respective
method of application to produce a line of specified thickness which shall be continuous and uniform in shape having clear and
1.3.4.2 The materials upon heating to application temperatures shall not exude fume~, which are toxic, obnoxious or injurious to
persons property.
1.3.5 Preparation:
The materials shall be melted in accordance with the manufacturer's instruction~ in a heater fitted with a mechanical
stirrer to give a smooth consistency to the thermoplastic materials to avoid local overheating. The temperature of the mass shall be
within the range specified by the manufacturer and shall on no account be allowed to exceed the maximum temperature started by
the manufacturer. The molton material should be used as expeditiously as possible and for thermoplastic materials which has
natural binders or is otherwise sensitive to prolonged heating the materials shall be maintained in a molten condition for more than
ii) After transfer to the laying equipment the material shall be maintained within the temperature range specified by the
manufacturer for achieving the desired consistency for laying.1.3.6 Properties of finished road marking:
The stripe shall be note be slippery when wet.
The marking shall not lift from the payment in freezing weather.
After application and proper drying the stripe shall show no appreciable deformation of discoloration under traffic and under road
temperatures up to 60 C.
The marking shall be deteriorate by contact with sodium chloride calcium chloride or oil drippings from traffic.
The stripe of marking shall maintain its original dimension3 and position.
Cold ductility of the material shall be such as to permit normal movement with the road surface without chopping or cracking.
The colour of yellow marking shall conform to IS colour no. 356 as given in IS :
Reflectorised Paint: Reflectorised paint, if used, shall conform to the specification by the manufacturers and approved by the
engineer. Refleciorising glass beads for reflectorising paints where used shall conform to the requirements of MoRTH clause 803.4.3.
1.3.7 Marking shall be done by machine. For locations where painting cannot~ be done by machine, approved manual n~:lti1ods
shall be used with prior approval of the engineer. The contractor shall maintain control over traffic while painting operations are in
progress so as to cause minimum inconvenience to traffic compatible with protecting the workmen.
1.3.8 The thermoplastic materials shall be applied hot either by sereeding or extrusion process. After transfer to the laying
apparatus, the material shall be laid at a temperature within the range specified by the manufacturer for the particular method of
laying being used. The paint shall be applied using a screed or extrusion machine.
1.3.9 The pavement temperature shall not be less than 10 C during application.
All surfaces to be marked shall be thoroughly cleaned of all dust, dirt, grease, oil and all other foreign matter before
application of the paint.
The material, when formed into traffic stripes, must be readily renewable by placing on overlay of new material directly over an old
line of compatible material. Such new material shall so bond itself to the old line that no splitting or separation takes place.
Thermoplastic paint shall be applied in intermittent or continuous lines of uniform thickness of at least 2.5 mm unless specified
otherwise. Where arrows or letters are tobe provided, thermoplastic compound may be hand-sprayed. In addition to the beads
included in the material, a further quantity of glass beads of type-2, conforming to the above noted specification shall be sprayed
uniformly into a monolayer on to the hot paint line in quick succession of the paint spraying operation. The glass beads shall be
applied at the rate of 250 grams per square meter area.
1.4.4 The minimum thickness specified is exclusive of surface applied glass beads. The method of thickness measurement shall
be in accordance with appendices B and C of BS - 3262 (Part-3)
1.4.5 The finished lines shall be free from ruggedness on sides and ends and be parallel to the general alignment of the
carriageway. The: upper surface of the lines shall be level, uniform and free steaks.
1.5 Measurement for Payment:
1.5.1 The painted marking shall be measured in sq. meters of actual area marked (excluding the gaps, if any).
1.5.2 In respect of markings line directional arrows and lettering, etc. the measurement shall be by numbers.
1.6 Rate:The contractor unit rate for road markings shall be payment in full compensation of furnishing all labour, materials,
tools, equipment, including all incidental costs necessary for carrying out the work at the site confirming to these specification
complete as per the approved drawing(s) or as directed by the engineer and other incidental cost necessary' to complete the work
to these specifications.
1.7 SPECIAL TERMS AND CONDITIONS FOR THERMOPLAST PAINT WORK:
(1) Agency should carry out the such type of work by only of thermoplastic paint laying machine (power driven only) with
temperature controller and automatic mixing arrangement of glass beads in required proportion.
(2) After completion of the laying of thermoplastic paint work, two years guarantee for durability and reflectivity as per
M.O.R.T.H. specification for road and bridge works clause 803 should be given by the bidder in the writing.
(3) Guarantee security deposit shall be retained @ 10% of the cost of the item of thermoplast paint from the R.A. bills, which
will be released after expiry of guarantee period.
(4) Agency who carry out the such type of work shall have an experience of carrying out similar type of work.
(5) Test certificates as per M.O.R.T.H. specification for road and bridge works clause 803.3.2.2 (vi) should be furnished of
reputed laboratory before.
Mode of measurements shall be on SMT basis
Road marking with hot applied thermoplastic paints with reflectorising glass beads on bitumin surface providing and laying a hot
applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250gms per sqm area, thickness of 2.5mm is
excluding of surface applied glass beds as per IRC:35. The finished surface to be level, uniform and free from streaks and holes.)
Directional Arrow, Lettering.
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or his authorized representative.
Mode of measurements shall be on Nos. basis.
Cat Eye/ Road Stud/ RPM: Supplying of Molded Twin Shanks Raised Pavement Markers made of polycarbonate and ABS moulded
body and reflective panels with micro prismatic lens (No glass bed lens) capable of providing total internal reflection of the light
entering the lens face and shall support a load of 13635 kgs .tested in accordance to ASTM D 4280 Type Hand complying to
Specifications of Category A of MORTH Circular No RW/NH/33023/10-97-DO III Dt 11.06.1997 .The height, width and length shall
not exceed 20 mm, 130 mm and 130 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base
shall be 35 +/- 5 degree.The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2mm
and height not less than 30 +/-2 mm) from the body is to be a minimum value of 500 Kgf. Fixing will be by drilling holes on the
road for the shanks to go inside,without nails and using epoxy resin based adhesive as per manufacturers recommendation and
The color of the marker should be as per the IRC35-2015 and as directed by Engineer-in-charge.
The colour, configuration, size and location of Cat eye (stimsonite) reflector for highways other than Expressways shall be in
accordance with the code of Practice for Road Signs, IRC:67 or as shown on the drawings or as directed by the Engineer.
The Cat eye (stimsonite) reflector shall be reflectorised as shown on the drawings or as directed by the Engineer. It shall be of retro-
reflectorised type and made of encapsulated lens type reflective sheeting vide Clause 801.3, fixed over aluminium sheeting as per
these specifications.
In general, cautionary and mandatory signs shall be fabricated through process of screen printing. In regard to informatory
signs with inscriptions, either the message could be printed over the reflective sheeting, or cut letters of non-reflective black
sheeting used for the purpose which must be bonded well on the base sheeting as directed by the Engineer.
1.2 Materials :
The various materials and fabrication of the Cat eye (stimsonite) reflector shall conform to the following requirements.
The adhesive materials shall be of standard quality and it shall be high
resistance quality against heavy moving vehicles.
The materials shall be used for the body of the Cat eye (stimsonite) reflector is of high density PVC materials.
The dimensions and size of the Cat eye (stimsonite) reflector shall be as per IS standard. The retro-reflective sheeting used on the
cat-eye shall consist of the white or coloured sheeting having a smooth outer surface which has the property of retro reflection over
its entire surface. It shall be weather resistant and show colour fastness. It shall be new and unused and shall show no evidence of
cracking, scaling, pitting, blistering, edge lifting or curling and shall have negligible shrinkage or expansion. A certificate of having
tested the sheeting for these properties in an unprotected outdoor exposure facing the sun for two years and its having passed
these tests shall be obtained from a reputed laboratory, by the manufacturer of the sheeting. The reflective sheeting shall be either
of Engineering Grade material with enclosed lens or of High Intensity Grade with encapsulated lens. The type of the sheeting to be
used would depend upon the type, functional hierarchy and importance of the road.
High intensity grade sheetings : This sheeting shall be of encapsulated lens type consisting of spherical glass lens, elements adhered
to a synthetic resin and encapsulated by a flexible, transparent water-proof plastic having a smooth surface. The retro-reflective
surface after cleaning with soap and water and in. dry condition shall have the minimum co-efficient of retro-reflection
determined in accordance with ASTM Standard E:810).
ACCEPTABLE MINIMUM CO-EFFICIENT OF RETRO-REFLECTION FOR HIGH INTENSITY GRADE SHEETING
[CANDEL AS PER LUX PER SQUARE METRE]
Observa- Entrance White Yellow Orange Green/ Blue
tion (in angle (in Red
degree) degree)
When totally wet, the sheeting shall not show less than 90 percent of the values of retro reflective indicated in Table 800-1. At the
end of 7 years, the sheeting shall retain at least 75 percent of its original retro-reflectance.
Engineer grade sheetings : This sheeting shall be of enclosed lens type consisting of microscopic lens elements embedded beneath
the surface of a smooth, flexible, transparent, water proof plastic, resulting in a non-exposed lens optical reflecting system. The
retro-reflective surface after cleaning with soap and water and in dry condition shall have the minimum co-efficient of
retro-reflection determined in accordance with ASTM Standard E:810) as indicated in Table 800.2.
ACCEPTABLE MINIMUM CO-EFFICIENT OF
RETRO-REFLECTION FOR HIGH INTENSITY GRADE SHEETING
[CANDEL AS PER LUX PER SQUARE METRE]
Observa- Entrance White Yellow Orange Green Red Blue
tion (in angle (in
degree) degree)
When totally wet, the sheeting shall not show less than 90 percent of the values of retro reflective indicated in Table 800-2. At the
end of 5 years, the sheeting shall retain at least 50 percent of its original retro-reflectance.
1.3 Processed and applied in accordance with recommended procedures, the reflective material shall be weather resistant and,
following cleaning, show no appreciable discolouration, cracking, blistering or dimensional change and shall not have less than
percent of the specified minimum reflective intensity values (Table800-l and 800-2) when subjected to accelerated weathering for
1000 hours, using type E or EH Weatherometer (AASHTO Designation M 268).
1.4 INSTALLATION:
The Cat eye (stimsonite) reflector shall be installed directly on road surface, after cleaning completely by removing all dust
and other foreign materials from the surface of the road.
1.5 MEASUREMENT FOR PAYMENT :
The measurement Cat eye (stimsonite) reflector shall be in numbers, these shall be measured in No.
The Contract unit rate shall be payment in full for the cost of making Cat-Eye, including all materials, installing it at the site
and incidentals to complete the work in accordance with the specifications.
Pre cast Cylindrical Bollard
Providing, hoisting, and arranging in position exposed fair finish, factory made pre-cast bollard of approximately size
800mm high and 280mm Dia as per design intent, of approved make, made of minimum M-30 grade reinforced
cement concrete. The rate shall also include for erecting and fixing the bollard in position as per drawing, curing,
finishing, cost of excavation, base PCC M15 grade and finish good, rendering (if required), transportation,
loading and unloading charges, etc complete as directed by Engineer in charge. Precast bollard shall be with
provision with MS Hook & fixing safety chain between two bollard. Weight of hook and chain shall be paid in
relevant tender items. Contractor shall submit methodology for erection of bollard and get approved from
Engineer in charge. Location and type of each liffting hook shall be as per design intent and approved from engineer
incharge. Sample shall be approved by Architect and Engineer in charge before mass production. Architect
reserves right to reject part or all work of sub standard or not in confirmation to approved sample as per mock
up. Sample and mock shall not be payble if rejected or casted in other location (not in scope of work area). ( Law
The Item shall be carried as per Item Description in tender document and as Per prevailing latest IS & IRC Code & Genral
Specification booklet and As per instruction of Engineer-in-Charge and/or his authorized representative.
The mode of payment for this item shall be on No. Basis
Providing and Casting in situ ordinary cement concrete M200 for R.C.C. Raft and cutt off walls including necessary
shuttering laying, vibrating, ramming and curing complete.(B) Walls, fom top of foundation level upto floor two level (upto
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or his authorized representative.
Mode of measurements shall be on CMT basis.
Fabricating, supply and erecting in position Standard Structural steel sections conforming to IS 2062 for railing , skywalk, stair, or
other works using ISMB, ISA, ISMC, MS plate, flat, square bars, pipe, square pipe, rectangular sections, square section, tube, etc.
including welding, cutting, wastage, etc. complete. The rate is inclusive of welding rod, supply & fixing of correct size nut, bolts,
washers, including one primer coat of red lead paint conforming IS:102 Zinc chromate paint conforming to IS:104 followed by two
coat of aluminium paint as per IS:2339 OR enamel paint of color as selected by engineer incharge, with all contractor's materials,
labour, tools & plants, in bolted/welded construction as directed by Engineer-in Charge. The waste cut pieces shall not be included
in the paying quantity. The work shall be done as per drawing and specification. The work shall be carried out as per IS:800, IS:816
Mode of measurements shall be on MT basis.
Providing & Fixing 75 mm thick Tree Grating 950*950*75 mm as per design and Drawing . The rate shall be inclusive of providing
and Laying 50 to 80 mm thick average bedding layer of coarse sand below tree grating as per required grading and specification . the
centre of grating to be same as the centre of the tree trunk. The grating to be 8 pieces as per drawing. the work of the grating blocks
shall be executed in line and level; by skilled mason of flooring work only .(Sola Science City Road tender Rate)
Mode of measurements shall be on No basis.
Pre cast concrete water table drain
Paver Block providing and laying, Dished Channel specified thickness, size, grade of concrete and colour machine made and
blasting by automatic shot blasting machine and high density as per approved sample of approved make for suite drain besides
parking area and other areas as mentioned in drawing. Including providing and laying 50mm thick average bedding layer of
coarse sand below dished channel as per required grading and specification. Laid dished channel shall be mechanically
compacted. The work of the dished channel shall be executed in line and level by skilled mason. Small size of dished channel
with same specification shall be used at residue or at the end. If cutting of dished channel shall be required, than cut by
machine only and laying to be done by skilled flooring mason. Actual laid area shall be measured and paid without any
wastage. (A) 600mm X 300mm X 100mm thick M-25 grade grey dished curved channel. Make VYARA or Equivalent
1. Work shall be carried out as directed by engineer in charge.
2. The measurement shall be in RMT.
3. The rate for this item includes cost of all materials, labour. plants and everything required to execute this item etc.
complete and maintain till completion of the work and as directed by engineer in charge.
Paver Block Providing and laying Paver blocks of specified thickness, size, grade of concrete and colour machine made and
blasting by automatic shot blasting machine and high density of as per approved sample of approved make for footpath,
parking areas, service lanes,cross over and other areas as mentioned in the drawing. Including providing and laying 60 mm thick
averave bedding layer of coarse sand below paver block as per required grading and specification. Laid paver block shall be
mechanically compacted. The work of the paving blocks shall be executed in line and level by skilled mason of flooring work
only. Small size of paver block with same specification shall be used at residue or at end. It should be laid in such a way that the
no cutting of the paver block to be necessary. If cutting of paver block shall be required , than cut by machine only and laying to
be done by skilled flooring mason. The finished surface of the paver block shall have coarse sand Texture Finish. Pave blocks
shall be compacted and shall be re-laid if necessary. Actual laid area shall be measured and paid without any wastage. (A)
Automatic Machine Made Hydraulic Prees Paver Block (60 mm thick M-35) Supplied By AEP Rate Approved By MC Res. no.1374
Mode Of measurements smt basis.
Supplying and fixing for central verge 230 mm L x 235 mm Width x 680 mm H Supplying & Fixing in M-20 grade using 20 mm
nominal size black trap aggregate of sevaliya/timba or equivalent quality for pre-cast blocks,reasonably exposed
finish/formwork,mould with well equipped with vibratory system for kerb stones of approved design including
curing,etc.complete,including the cost of formwork etc.complete.THe rate shall also include necessary cutting of asphalt,fixing
the kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and materials.The rate shall also include
the flush pointing in CM(1:3)for all joints of the kerbstones.Filling of Zari alone the sides of the kerb stone fixed with bituminous
concrete mixed in proper position as directed by engineer in charge to form a portable mixture.In any case gravel or such type of
materials shall not be allowed for production.
Work shall be carried out as per item description including cost of all labour and materials etc. complete as directed. General
standard practice of work is applicable.
The measurements shall be on Rmt basis.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any size ; shape (Usually Uni-
Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for footpath, parking areas, service lanes and other
areas as mentioned in the drawing / instruction of Engineer-in-Charge and/or his authorized representative. Cost includes
formworks using rubber mould, Rate providing and laying paver blocks as per required grading and specification. The paver block
shall be mechanically compacted. The work of paving blocks shall be executed in line and level by skill mason of flooring work
only. It should be laid in such a way that the no cutting of the paver block to be necessary. if cutting of paver block necessary
then it should be cut by machine only and carting. The finished surface of the paver block shall have resonably good, plain
finished. Paver blocks shall be compacted and shall be relaid if necessary. Gravel or such type of materials shall not be allowed
for production. Laying on 50 mm thick sand bedding.
• Laying on 50 mm thick sand bedding.
Scope of work :
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil murrum including sorting outs and
stacking of useful materials stuff up to 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various Retail outlets. The work includes:
Verification of the existing site condition and advising our project in charge to lay suitable base course if required. Contractors are
required to satisfy themselves with quality of sub grade, sub-base course before the paver blocks are laid and suggest strengthening
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks. Manufacturing of paver blocks in
your plant as per requirements in technical specification enclosed. Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand bedding, within shortest possible
time the site is public place hence care should be taken to ensure that the routine activities should not be disturbed. The job of
laying may required to be carried out during night also.
Testing of paver blocks shall through reputed Govt. /Non Govt. Test house only and submission of test results as per requirements in
Technical Specifications. AMC reserves the right to carryout test at random. Cost for such tests to be borne by party. The contractor
shall guarantee that all material and components designed, fabricated, supplied, and laid by him shall be free from any type of
defect due to faulty material and/or workmanship/erection for a period of One year from the date of completion of work. However,
the contractor one year's shall render free maintenance.
TECHNICAL SPECIFICATIONS:
Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of compaction by application
of hydraulic compaction and also by high intensity vibration to the moulds. The machine should have automatic control
for uniformity in strength.
Concrete Batching & Mixing Plant: (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient should be mixed in
concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should equipped with automatic
control panel for maintaining water cement ratio from batch to batch to obtain concrete of uniform quality and strength.
The plant should be equipped with adequate mechanism for mechanized loading of raw materials into mixer and conveyor
belt for transportation of concrete from mixer to concrete block making machine to maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks.
Laboratory (Desirable but not essential) :
The testing equipment should have required in the Laboratory as per the following:
A Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
Systematic record of test results of various paver blocks manufactured in the factory.
Concrete Mix Design for various grade of concrete used for making of paver blocks.
Specifications For Coloured Paver Blocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or equivalent approved colour
Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour pigment of 3% by weight of cement.
The colour shade shall be “RED” as selected by AMC before commencement of the work. White cement shall be used for
colored pavers to obtain the desired colour shade. The job also includes providing 50 mm thick sand bedding to match the
shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the date of laying
of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as per attachment.
Pavers Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should be retained until the
laying. The surface should be reasonably smooth and of anti skid and anti glare type. The paver should have uniform
chamfers to facilitate easy drainage surface run off. The pavers should have uniform interlocking space of 2mm to 3mm to
ensure compacted sand filling after vibration on the paver Surface. The concrete mix design should be followed for each
batch of materials separately and automatic batching plant is to be used to achieve uniformity in strength and quality. The
pavers shall be manufactured in single layer only. Skilled labour should be employed for laying blocks to ensure line and
level of laying, desired shape of the surface and adequate compaction of the sand in the joints. The pavers shall be of
cement gray colour without any pigment & for coloured pavers refer “specifications for coloured pave`” The pavers are to
be skirted all round with kerbing using solid concrete blocks of size 150mm X 250mm X 380mm. The kerbing should be
embedded for 100mm depth. The concrete used for kerbing shall be cured properly for 7 days minimum.
Paver Block Dimensions:
Thickness 60 mm
Shape Unipaver, I shape or directed by Addl.C.E.
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of any pigment.
For coloured pavers refer “specifications for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
Testing of Paver Blocks :
* TEST Average Values Frequency
1. Compressive Min. 35 N/Sq mm for 250 Smt / 1 Test
Strength 60mm thick
Minimum 4.5 N/Sq
2. Flexural Strength
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
* Sampling and testing procedure as per enclosed specifications
Sampling and Testing Procedure for Paver Blocks
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Sampling for Testing
Sampling of Paver blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall be divided into ten
approximately equal groups. Three blocks shall be drawn from each group.
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated section of part thereof, and
the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the paving in transit.
Protect the paving from damage and contamination until they have been tested. The testing shall be carried as soon as
possible, after the sample has been taken. As soon as practicable after sampling. The samples shall be stored in water at
degree C 5 degree C for 24 hours prior to testing.
The item is to be executed as per instructions and to the entire satisfaction of Engineer-in-Charge and/or his authorized
representative using Rubber mould and Table vibrator for Kerb instead of mechanical press system.
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet, metal, soling etc.
complete with stacking the materials as directed. The road surface of asphalt shall carefully be opened to full width as
directed by the Engineer-in-Charge and/or his authorized representative.
Excavation area shall be properly identified and marked in rectangular shape. The road crust shall be opened up to entire
depth i.e. including soling. All the materials shall be separately deposited in such a way and in places as may be determined
by the Engineer-in-Charge and/or his authorized representative. In case rubble not being so deposited or being mixed up
with the excavated materials will not be allowed for refilling. The cost of materials shall be charged from the contractor.
The decision of the C.E. shall be final and binding to the contract
For detailed specification for Laying of Paver Block on sand bedding, refer R & B Department booklet for General Technical
Specification for building works.
The rate shall be for a unit of SMT
Labour charges for hand laying hotmix material DBM/BC on the road surface in line & level incl. cleaning the surface
with Air Compressor and if require re carting material by JCB at necessory place of work also rolling with 8-10 Tonnes Vibratory
Roller and Dust spreading on BC after rolling, rate also includes re- carting of Hotmix material from place of Work/AMC store to
Location of laying having narrow width like chawls, poles, gamtal roads etc. complete. (As Per Road Tender)
Rolling : - Bituminous materials shall be laid and compacted in layers, which enable the specified thickness, surface level, regularity
requirements and compaction to be achieved. Compaction of Bituminous materials shall commence as soon as possible after laying.
Compaction shall be substantially completed before the temperature falls below the minimum rolling temperatures. Rolling of
longitudinal joints shall be done immediately behind the paving operation. After this, rolling shall commence at the edges and
proceed towards the center longitudinally except that on super elevated and unidirectional cambered portions, it shall progress
from the lower to the upper edge parallel to the center line of the pavement. Rolling shall be continued until all the roller marks are
removed from the surface. All the deficiencies in the surface after laying shall be corrected by the attendants behind the
paver, before initial rolling is commenced. The initial or Break down rolling shall be done with 8-10 tones dead weight smooth-
wheeled rollers. The intermediate rolling shall be done with 8-10 tones or vibratory roller. The finishing shall be done with 6 to
8 tones smooth wheel tandem rollers. At least two number of roller on site. Where compaction is to be determined by density of
cores, the requirements to prove the performance of rollers shall apply in order to demonstrate that the specified Density can be
achieved. In such cases the contractor shall nominate the plant, and the method by which he intends to achieve the specified level of
compaction and finish at temperatures above the minimum specified rolling Temperature. Bituminous material shall be rolled in
longitudinal directions, with the driven rolls nearest the pavers. The roller shall first compact the materials adjacent to the joints and
then work from the lower to the upper side of the layer, overlapping on successive passes by at least one third of the width of the rear
roll or, in case of Pneumatic tyre roller, at least the nominal width of 300 mm. Roller should move at a speed of not more than 5 km/
hr. the roller shall not be permitted to stand on pavement which have not been fully compacted and necessary precautions shall be
taken to prevent dropping of oil, Grease, Petrol or other foreign matters on the pavement either when the roller are operating or
standing. The wheels of rollers shall be kept damp with water, and the spray system provided with the machine should be in
good working condition, to prevent the mixture from adhering to the wheel. Only sufficient moisture to prevent the adhesion
should be used. Surplus water shall not be allowed to stand on the partially compacted pavement.
The rate shall be for a unit of MT
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
SealandSignatureoftheBidder Add.CityEngineer(WestZone)
AmdavadMunicipalCorporation
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – œrûtK vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj fhJtle
hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t,
ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ
yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk ytJNu.
œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu
ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt
MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt
MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytu zoh fu
ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe mcbex
fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. dwsht< mhfth ©b,ftuiNÕg ylu htusdth rJCtd îtht XhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2 mraJtjg ,dtk^eldh
<t.15.02.24 lt XhtJ v{btKu yusLme/¢tuLx[fxhtulu îtht ©bgtude ftgœtle studJtR vhevqKo &tg <u mwrlµ< fhJtlwk hnNu.
16. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto ctœ
fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu ftbdehe fhtJJtbtk
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb NY
fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk vwKo fhJtbtk
lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-97,
but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall be
placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form a part
of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to comply with
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through its
website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
Clause : 5 SCHEDULE OF MAINTENANCE
To keep paver blocks and footpaths durable, safe, and aesthetically pleasing, a structured maintenance schedule is essential. Pavers are
"interlocking" systems, meaning their strength relies on the sand in the joints; if the sand disappears, the blocks move and eventually
Below is a comprehensive maintenance and repair schedule categorized by frequency.
1. Common Defects & Repair Actions
When inspections reveal issues, use this guide to determine the repair method:
A. Sunken or Uneven Blocks (Settlement)
Cause: Poor base compaction or water washing away the bedding sand.
Repair: 1. Carefully lift the affected blocks using a flat-head screwdriver or paver extractor.
2. Add additional bedding sand to the base and compact it.
3. Re-install the blocks and sweep new sand into the joints.
B. Missing Joint Sand (The "Linchpin" of Pavers)
Cause: Rain, wind, or aggressive power washing.
Repair: Sweep Polymeric Sand into the joints. This sand contains a binder that hardens when misted with water, making it
resistant to washouts and weeds.
C. Cracked or Chipped Blocks
Cause: Heavy vehicle impact or freeze-thaw cycles.
Repair: Individual blocks should be replaced. This is why it is recommended to keep "attic stock" (extra blocks) from the
original installation to ensure a color match.
2. Checklist for Footpaths
Contractor shall execute maintenance works as directed by the client and through self-inspection under the instruction of
Engineer-In-Charge.
Surveying of footpaths and paver blocks shall be undertaken as and when required on the designated roads and chawls, as
instructed by Engineer-In-Charge.
The inspection schedule shall be aligned with the following categories of complaints, with priorities determined by the Engineer-
o CCRS complaints
o Complaints from MLSs/ Councilors
o Complaints from Officials
The specific roads and chawls shall be surveyed as per below schedule as specified.
o The contractor shall visit the ward office once a week to obtain details of the roads scheduled for inspection and
conduct a survey of footpaths and paver blocks, as directed by the Engineer-in-Charge (EIC)
The Contractor shall adhere to the maintenance schedule outlined in the tender documents and comply with the prevailing AMC
circulars of SOM issued from time to time.
Contractor's Sign Addl.C.E.(westzone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 101.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .