Loading…
Loading…
Tender Value
₹9.0 L
EMD Value
₹10,000
Closing Date
11 Jun 2026, 6:00 pm6d left
Executive Engineer, Und Irrigation Division, Jamnagar
WAGADIA WATER RESOURCES PROJECT Construction of Fencing from Gamtal Wagadia-1 to Wagadia-2 of village Wagadia of Taluka & District Jamnagar.
309120
04 of 2026-27
Open
Civil Works
Jamnagar
7 documents required · 7 mandatory
₹900
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹10,000
27 May 2026
27 May 2026
27 May 2026
11 Jun 2026
27 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : WAGADIA WATER RESOURCES PROJECT
Construction of Fencing from Gamtal Wagadia-1 to Wagadia-2 of
village Wagadia of Taluka & District Jamnagar.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Providing & fixing 1.20 Metre high 2300.00 Rmt. 391.93
fencing with 2.0 Metre long M.S. Angle
posts 40 mm x 6 mm and oil painting
coats fixed at 2.5 Mt., C/c with five
horizontal lines and two diagonals of
galvanized steel barbed wire weighting
9.38 Kg. per 100 Metre, Strained and
fixed to posts with G.I., Staples including
fixing the posts in ground with 0.5 M x
0.5 M x 0.5 M. block in C.C. 1:5:10 etc.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 9,01,439=00 Estimated Amount Rs. 9,01,439=00
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Deputy Executive Engineer
Irrigation Project Sub Division No.6/1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
7.pdf
BOQ.pdf
Tender Notice No.4.pdf
Download all tender documents and submit your bid