Tender ID
Tender Value
₹62.1 L
EMD Value
₹63,000
Closing Date
13 Apr 2026, 6:00 pmClosed
Executive Engineer N. P. Canal Division No.4A,Dabhoi
Special Repair to Phulwadi Branch Minor and Steel Aqueduct structure at ch.580 m of Phulwadi Branch minor Ex. Alwa-2 Minor of block No.2 (G.R. No - 42 / 2017 Kasundar Vasahat)
292327
07 of 2025-26
Open
Civil Works - Canal
Works
Vadodara
12 documents required · 11 mandatory · 1 optional
₹2,832
Executive Engineer, N P Canal Division No.4A, Dabhoi
₹63,000
1 Apr 2026
1 Apr 2026
1 Apr 2026
13 Apr 2026
1 Apr 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name of Special Repair to Phulwadi Branch Minor and Steel Aqueduct structure at
Work ch.580 m of Phulwadi Branch minor Ex. Alwa-2 Minor of block No.2 (G.R. No -
42 / 2017 Kasundar Vasahat)
Item No Description of Item (with brief Quantity Uni Rate In Amount
specification and reference to book t figures
of specifications)
'Dismantling the brick lining from
canal/Drain bed and slope including sorting
out and stacking of the useful material on 3277.82 Sqmt. 56.80
site including removing the rubbish etc.
complete as directed.
Trimming of the canal section manually for
preparing sub grade for laying cement
concrete (C.C.) lining in all sorts of soil and 3277.82 Sqmt 44.38
murrum including watering and compacting
bed etc. complete.
Scrapping out the old plaster & cleaning the
surface including racking out the joints 20 594.64 Sqmt 50.49
mm deep etc. complete.
Providing and laying plain/ reinforced
cement concrete lining of M-15 grade in bed,
side slopes and curvature including
Item batching, mixing, transporting, placing,
No. 4 vibrating, smooth finishing, curing including
dewatering where required.
7.5 cm. Thick lining in Bed & Slope (With
Water Curing) (Cement Level 300 kg)
Providing & fixing MS welded mesh of size
as specified below including cutting in
required sizes,fixing in canal prism etc. 1916.96 Sqmt 95.50
completed as directed.
2.8 mm dia of 100 mm x 100 mm
Earth work in embankment using selected
soil, soft & hard murrum excavated from
approved borrow area / village tanks etc.
Including conveying, spreading in uniform 838.91 Cum 62.50
layers, breaking clods and dressing to the
designed canal section etc. with lead upto
km and all lift .
Compaction of earth work in embankment in
uniform layers at optimum moisture content
to required dry density including watering 838.91 Cum 7.37
with hand compaction etc. complete. (as and
where required).
Dismentalling the existing brick masonry
including sorting out and satacking the
useful materials and renoving the debries 16.38 Cum 656.36
and making good the damage etc. complete
as directed. (Cement Mortar)
Dismentalling the existing foundation
concrete including the dismentalled stuff
including sorting out and satacking the 2.52 Cum 1009.78
useful materials andrenoving the debries
and making good the damage etc. complete
(a) In cement concrete
Providing & laying plain / reinforced
ordinary portland cement concrete of
various grades with cement, sand, and
coarse aggregates including centering,
shuttering, batching, mixing, transporting,
placing, vibrating, smooth finishing, curing 13.56 Cum 3869.00
etc. complate. ( MANNUALLY WITH
CONVENTIONAL MIXER ) (EXCLUDING
(ii) M 10 grade.(Cement level-220 kg)
(B) Raft, Bottom slab of barrel, bottom slab
Item of sump, approach slab and chute floor slab,
( I ) M 15 grade.(Cement level-300 kg)
Providing and laying burnt brick masonary
for super structure with ordinary portland
cement mortar 1:5 proportion including 33.50 Cum 4719.38
providing scaffolding racking out joints
curing etc. complete for all leads and lifts.
Providing cement plaster in thickness and
proportion as under including, smooth
finishing, curing, scaffolding etc. complete
Item No - 12 156.84 Sqmt 177.66
for all leads and lifts.
Cement mortar 1:3 proportion.
( b ) 12 mm thick.
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soil, soft &
hard murrum etc. including depositing the
Item No - 13 excavated stuff in uniform layers in banks or 81.90 Cum 74.55
as and where directed etc. complete for lead
upto 1 km and all lift. (By machinery)
(a) Above water table
Back filling the foundation trenches around
the structures etc with selected excavated
Item No - 14 31.05 Cum 26.70
stuff including watering, ramming,
compacting etc. complete.
'Providing 230 mm thick pucca rubble
pitching in C.M. 1:5 proportion over 10mm
bedding of same mortar with the surface
Item No - 15 1646.00 Sqmt 658.75
pointed with cement mortar of 1:3
proportion etc. complete for all leads and
Clearing silt/ deris form the pipe type Csy/
Box type CSY/ Pipe Drain/ Drainage Syphon
for drain/ Canal by Digging the same
Item No - 16 including depositing the excavated earth 4.31 Cum 546.25
debris etc. for all lead and lift.
(A) For Dry condition ( Up to 900 mm dia
'Providing, Supplying , Laying & Lowering
and Clamping standard length ISI mark
high density Polyethylene H.D.P.E. Pipe as
per IS 4984:2016 – Material and specials of
following class and diameter Jointing By
butt fusion welding method including cost of
all local and central taxes, transportation,
freight charges octroi, irepection charges,
loading, unloading, conveyance to the site of
works at all level including cost of labour,
material, giving satisfactory hydraulic
testing etc. comp.
Pipe- 630 mm (O.D)
'Steel work, welded in built up sections
framed work including cutting, hoisting,
fixing in position and applying a priming
coat of red lead paint. (A)In beams and
Item No - 18 joists, channels angles Tees, flats, with 50.68 Q 11646.00
connecting plates or angle cleats as in main
and cross beams. Hip the like and jack
rafters, purlins connected to common
rafters on Existing Steel truss Aqueduct.
'Applying priming coat and Painting two
coats over Existing Aqueduct Structure with
Size of 1.15 × 1.20 m including preparing
the surface by throughly cleaning, oil,
Item No.19 396.63 Sqmt 158.00
grease, dirt and other foreign matter and
scoured with brushes fine steel wood,
scrapers and sand paper with ready mixed
priming paint brushing red lead.
'Providing temporary motarable service
road during construction including cleaning
Item No.20 the site in 7 m width, cutting undulations, 1.50 Km 13679.95
filling depressions, watering & maintaining
the same etc. complete.
Removing of existing pipeline incl. removal
of specials, valves jointing material
including carting and stacking of removed
material from site of work to the
Item No.21 35.00 Rmt 120.00
department store as directed excl.
excavation and refilling
RCC/Pre-stressed concrete pipes -Dia.
'Providing and fixing in position canal data
boards of standard size 1.20 m x 0.90 m
with M.S. angle 40mm x 40mm x 6mm with
Item No.22 3mm thick iron plate, 3 m height in 1:5:10 2.00 Nos 4531.55
proportion concrete block size 40cm x 40cm
x 75 cm including painting existing data on
the board etc. complete as directed.
Total amount without GST
Total amount without GST
I/We am/are willing to carry out the work at… ....................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) fipgur Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Standard Cement Consumption will be considered as per
મુ.ઈ.(ગુ.િન.)/પીબી/મી ડઝાઈન/૪તા.૨૦.૦૧.૨૦૨૪(Refer. Annexure - A),therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption shall
be deducted from the rate of original item at the rate of “*Rs. 5234.00 – as per R & B
Bharuch District Civil SOR for year 2023-24” in all the tender.
Note: If the bidder submits bid above/below the estimated rate put to tender, the *rate
of cement shall be adjusted accordingly.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Phulwadi Br Mr Final.pdf
BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .