Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC RAR 107A GROUND FLOOR RAJENDRA ARIHANT TOWER B1 COMMUNITY CENTRE JANAKPURI NEW DELHI 110058 | WEST | DELHI | 110058 | ₹20.2 L | L1 | Accepted-AOC L-1 bidder |
| 2 | L2₹21.8 LRejected-Finance S 79 OKHLA INDUSTRIAL AREA PHASE II NEW DELHI 110020 | SOUTH EAST | DELHI | 110020 | ₹21.8 L | L2 | Rejected-Finance L-2 bidder |
| 3 | L3₹27.5 LRejected-Finance 1001 SHIVALIK ABAISE 100 FEET ROAD OPP ANANDNAGAR APARTMENT PRAHALADNAGAR AHMEDABAD AHMEDABAD GUJARAT 380015 UDYAM GJ 01 0027029 24AGPPP8172K1ZP R M MII STATUS AS VERIFIED | AHMADABAD | GUJARAT | 380015 | ₹27.5 L | L3 | Rejected-Finance L-3 bidder |
| 4 | L4₹28.5 LRejected-Finance | ₹28.5 L | L4 | Rejected-Finance L-4 bidder |
| 5 | L5₹37.0 LRejected-Finance HOUSE NO 2246 SECTOR 15 C CHANDIGARH | NA | NA | 160001 | ₹37.0 L | L5 | Rejected-Finance L-5 bidder |
| Sl No | Description | Qty | Unit | Modern Agencies L5 | Nexus Fire And Security Systems L1 | PYROGUARD ENGINEERS PRIVATE LIMITED L2 | CENTRE TAP ENGINEERING L3 | Kalpataru Industries L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Design, Supply,Installation ,Testing & commissioing of Gas Suppression System including fire gas (FK-5-1-12) of 4.5% concentration, flooding system comprising of the following as per NFPA 2001 & Upto date amendments standards consisting of Cylinder PESO Approved, complete with UL / VDS / PESO Approved valve assembly and arrangement for supervisory switch connection for monitoring cylinder pressure,a pressure guage with a safety burst disc ,electronic control head / Solenoid, pressure operated control, head, flexible hose, strap, NRV, Pressure Switch and a safety cap, required nos of Nozzles (UL / VDS listed), Piping, Manifold etc. complete as required. Gas. Design & drawings of clean agent /gas suppression ( Total flooding) system (FK-5-1-12) of 4.5% concentration in compliance to NFPA 2001 & Upto date amendments including design of Cylinder capaity, volume of Gas, Nos. of Nozzles, piping design and pressure calculations using certified (PESO/BIS/UL/VDS) design software suitable for seamless steel cylinder for the rooms with following dimensions duly vetted by manufacturer (OEM) shall be submitted prior to starting of the works. Note: RV: Room Void, CV- Ceiling void & m3- cubic mtrs | ||||||||
| 1.10 | UPS room -1 +Server room (RV-22 m3 & CV-5 m3) | 1 | Job | 8,000 ₹8,000 | 8,000 ₹8,000 | 2,000 ₹2,000 | 20,000 ₹20,000 | 50,000 ₹50,000 |
| 1.20 | Automation room (RV-58 m3 & CV-14 m3) | 1 | Job | 8,000 ₹8,000 | 8,000 ₹8,000 | 2,000 ₹2,000 | 20,000 ₹20,000 | 50,000 ₹50,000 |
| 1.30 | Equipment room-1 RV-54 m3 & CV-13 m3) | 1 | Job | 8,000 ₹8,000 | 7,000 ₹7,000 | 2,000 ₹2,000 | 20,000 ₹20,000 | 50,000 ₹50,000 |
| 1.40 | Equipment room-2 (RV-64 m3 & CV-15 m3) | 1 | Job | 8,000 ₹8,000 | 7,000 ₹7,000 | 2,000 ₹2,000 | 20,000 ₹20,000 | 50,000 ₹50,000 |
| 1.50 | UPS room -2 +Battery room (RV-28 m3 & CV-7m3) | 1 | Job | 8,000 ₹8,000 | 8,000 ₹8,000 | 2,000 ₹2,000 | 20,000 ₹20,000 | 50,000 ₹50,000 |
| 1.60 | UPS room-3 (RV-23 m3 ) | 1 | Job | 8,000 ₹8,000 | 7,000 ₹7,000 | 2,000 ₹2,000 | 20,000 ₹20,000 | 50,000 ₹50,000 |
| 2.00 | SITC of UL & PESO approved Seamless storage 80L cylinder of Novac 1230 agent complete with valve assembly, pressure switch with safety burst disk & safety cap and other standard accessories including suitable size mounting Straps (2 nos. of straps for each cylinder) . | 4 | Each | 1,05,000 ₹4.2 L | 88,000 ₹3.5 L | 1,06,930 ₹4.3 L | 1,00,000 ₹4 L | 85,000 ₹3.4 L |
| 3.00 | SITC of UL & PESO approved Seamless storage 34 L cylinder of Novac 1231 agent complete with valve assembly , pressure switch with safety burst disk & safety cap and other standard accessories including suitable size mounting Strap (2 nos. of straps for each cylinder) . | 2 | Each | 88,000 ₹1.8 L | 59,000 ₹1.2 L | 83,120 ₹1.7 L | 80,000 ₹1.6 L | 70,000 ₹1.4 L |
| 4.00 | Supply, filling & handing over of clean, odourless, colour less, UL listed and suitable for fire class - A, B & C fire suppression agent (FK-5-1-12 fire suppresion fluid) for item no 1.2 & 1.3. etc. complete as per tender specification, as per site requirment & as per direction of Engineer Incharge.(Gas shall be UL Listed and Chromatography Report is required) | 275 | Kg | 2,200 ₹6.0 L | 1,250 ₹3.4 L | 1,550 ₹4.3 L | 3,000 ₹8.3 L | 2,050 ₹5.6 L |
Tender Value
₹40.4 L
EMD Value
₹1.2 L
Closing Date
10 Jun 2025, 6:00 pmClosed
AGM(E-E) Derhadun Airport
O/o The Airport Director, AAI, Dehradun Airport, Dehradun
Provision of Fire Suppression System for critical CNS and Electrical installations at Dehradun Airport
2025_AAI_235601_1
AAI/DDN/E-E/ENIT-02/25-26/
Open Tender
Electrical Works
120 days
Dehradun Airport
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,180
₹1.2 L
11 Feb 2026
19 May 2025
12 Jun 2025
20 May 2025
10 Jun 2025
20 May 2025
20 May 2025 - 30 May 2025
Amount
Design, Supply,Installation ,Testing & commissioing of Gas Suppression System including fire gas (FK-5-1-12) of 4.5% concentration, flooding system comprising of the following as per NFPA 2001 & Upto date amendments standards consisting of Cylinder PESO Approved, complete with UL / VDS / PESO Approved valve assembly and arrangement for supervisory switch connection for monitoring cylinder pressure,a pressure guage with a safety burst disc ,electronic control head / Solenoid, pressure operated control, head, flexible hose, strap, NRV, Pressure Switch and a safety cap, required nos of Nozzles (UL / VDS listed), Piping, Manifold etc. complete as required. Gas. Design & drawings of clean agent /gas suppression ( Total flooding) system (FK-5-1-12) of 4.5% concentration in compliance to NFPA 2001 & Upto date amendments including design of Cylinder capaity, volume of Gas, Nos. of Nozzles, piping design and pressure calculations using certified (PESO/BIS/UL/VDS) design software suitable for seamless steel cylinder for the rooms with following dimensions duly vetted by manufacturer (OEM) shall be submitted prior to starting of the works. Note: RV: Room Void, CV- Ceiling void & m3- cubic mtrs
UPS room -1 +Server room (RV-22 m3 & CV-5 m3)
Automation room (RV-58 m3 & CV-14 m3)
Equipment room-1 RV-54 m3 & CV-13 m3)
Equipment room-2 (RV-64 m3 & CV-15 m3)
UPS room -2 +Battery room (RV-28 m3 & CV-7m3)
UPS room-3 (RV-23 m3 )
SITC of UL & PESO approved Seamless storage 80L cylinder of Novac 1230 agent complete with valve assembly, pressure switch with safety burst disk & safety cap and other standard accessories including suitable size mounting Straps (2 nos. of straps for each cylinder) .
SITC of UL & PESO approved Seamless storage 34 L cylinder of Novac 1231 agent complete with valve assembly , pressure switch with safety burst disk & safety cap and other standard accessories including suitable size mounting Strap (2 nos. of straps for each cylinder) .
Supply, filling & handing over of clean, odourless, colour less, UL listed and suitable for fire class - A, B & C fire suppression agent (FK-5-1-12 fire suppresion fluid) for item no 1.2 & 1.3. etc. complete as per tender specification, as per site requirment & as per direction of Engineer Incharge.(Gas shall be UL Listed and Chromatography Report is required)
Supply, Installation, Testing & Commissioning of following UL listed accessories of master cylinder suitable to the cylinders as per item no-1.1 & 1.2 complete as per tender specification, as per site requirment: 1. Electrically cum Manual acctuator to operate the gas manually from the cylinder with all accessories 2. Pneumatic actuator valve - For triggering the cylinder assembly as per system requirement 3. Flexible Discharge Hose of Suitable size with approporiate pressure rating made of Braided reinforce rubber Hose fitted with Carbon steel fittings 4. Pressure gauge.
Supply , installation,Testing & commissioing of Manifold supervisory switch for indication of discharge of system complete as required.
Supply , installation,Testing & commissioing of MS seamless Piping conforming to ASTM A-106 Schedule-40 complete with all fittings as per flow calculations for the specific hazard volume and stand to hold,position & support the manifold and piping properly with MS suspended supports, clamps anchor fastners including painting with one coat of red oxide/yellow zinc cromate and 2 coats of enamel paint ( post office red) and cutting/ chases / holes in ceiling/wall and making good the same as required.
UPS room -1 +Server room (RV-22 m3 & CV-5 m3)
Automation room (RV-58 m3 & CV-14 m3)
Equipment room-1 RV-54 m3 & CV-13 m3)
Equipment room-2 (RV-64 m3 & CV-15 m3)
UPS room -2 +Battery room (RV-28 m3 & CV-7m3)
UPS room-3 (RV-23 m3 )
Supply, Installation, Testing & Commissioning of Discharge nozzles designed to provide the proper flow and distribution of gas for total flood of hazard area at - 360 degrees or as per design & site requirment.
SITC of microprocessor based dual function Detection cum Gas/Agent Release Panel fully compliant with PESO/UL/BIS/VDS/EN listed & NFPA-72 having minimum 4 detection & minimum 2 nos release circuits (RAC) with programable function. Panel shall have minimum 16x2 character LCD Display suitable to operate on 120-220V /50Hz AC power supply with standby(battery) backup 24V DC supply with builtin charger along with audio visual indication of status/warnings. Other Features comprising of following: i) All zones configuration as Alarm /Supervisory zone. ii) Notifiation Appliance circuits iii)Programmable relays for fire/Fault/supervisory /gas released. iv) Auto /Manual Modes v) Walk test vi) Programable RAC with count down timer vii) Event history Logging viii) All field wiring circuits supervision. ix) Auto dialer interfacing compatibility.
Supply & installation of LPCB certified/complient Manual Abort Stations Semi Flush Mounting Re-settable (Non-Breaking Glass), Supplied with Special Reset Tool including integration with gas release panel
Supply & installation of LPCB certified/complient Manual Release Stations Semi Flush Mounting Re-settable (Non-Breaking Glass), Supplied with Special Reset Tool including integration with gas release panel
Supplying, installation , testing and commissioning of conventional photoelectric type Smoke detector, conforming to UL/LPCB/FMI/EN-54, with all accessories viz : indicator, base, base box etc. to be installed on ceiling / false ceiling etc. complete as per site requirment
Supply , Installation & comissioning of Hooter cum strobe confirming to UL/LPCB/EN-54.
Supply , Installation & comissioning of Response indicator as required
Supply and laying of 2 core x 1.5 sqmm, 1.1 KV grade, stranded copper conductor, XLPE insulated with fire-rated glass mica tape, LSZH outer sheathed, Armoured Fire Survival Cable confirming to BS 7846:2015, Fire Resistance as per BS 8434-2:2003, RED in Colour, laid on surface with GI saddle Complete with GI Junction Box, lugs, cable compression glands, cable tags and Ferruling.
Following capacity Seamless storage cylinder of Novac 1230 agent complete with all necessary fire suppression agent (FK-5-1-12 fire suppresion fluid) including , fittings, valve assembly, pressure gauge and other standard accessories as required approved by LPCB/UL/VDS/FM:
1 Kg Capacity
2 Kg Capacity
Supply, installation, testing & commissioning of FireTraceTube (Heat detection tube) for automatic fire detection and suppression system made by special modified Polyamide (PA), Color Red RAL300, High grade quality, Inner diameter 4mm, OuterDiameter 6 MM, bursting temperature-195oC UL approved as per UL 521- STANDARD FOR HEAT DETECTORS FOR FIRE PROTECTIVE SIGNALING SYSTEMS.
Supply, installation, testing & commissioning of FireTrace End of Line adapter with Pressure gauge for Automatic fire suppression tube used for fitting at the end of the tube for pressurizing and re-pressurising the tube used for fitting at the end of the tube for pressurizing and re pressurizing the tube includes check Valve, Pressure Gauge and fitting to connect to sensor tubing. Tube connection 6mm.
Supply, installation, testing & commissionong of FireTrace Pressure Switch ( UL Listed) to monitor Pressure drop in the tube, switch point 5 Bars.
Supply, installation, testing & commissioning of FireTrace T Connection, Brass, Nickle plated, for 4x6 mm Sensor Tube, quick and easy disassembly using special tool, External Diameter tube 6mm.
Supply, installation, testing & commissioning of FireTrace End of Line Plug for Automatic fire suppression tube used for fitting at the tube end to terminate the point. Fitting made by brass nickel plated material.
Supply, installation, testing & commissioning of MASTER CONTROL UNIT.
PYROGUARD ENGINEERS PRIVATE LIMITED (BID ID -859284)
CENTRE TAP ENGINEERING (BID ID -859742)
Kalpataru Industries (BID ID -859846)
Modern Agencies (BID ID -853438)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid