RAJEEV KUMAR RATHI, EXECUTIVE ENGINEER NAGAR
NAGAR NIGAM BAREILLY
In Ward 30, Swale Nagar, in Raza Colony, on Rampur Road, from Sonalik Agency to Navadiya Mod beyond the railway crossing, construction of side pavements and a concrete road using interlocking tiles, and construction of a concrete road from the railwa
2026_DOLBU_1164544_1
269/PA/NCAP/NNB/26-27 (1 To 6) Sr No 3 Tender List 6 Date-
Open Tender
Civil Works
180 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Bareillye-tender.com
₹3.4 L
29 Jun 2026
29 Jun 2026
9 Jul 2026
29 Jun 2026
9 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART-A | |||||
| 1.01 | Dismantling manually/ by mechanical Bituminous road means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge | 843.38 | SQM | 320.83 | ₹2,70,581.61 |
| 1.02 | Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. excluding royalty.( S.I. No.251) | 87.63 | CUM | 195 | ₹17,087.85 |
| 1.03 | Supply of Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceefing 0.5m in depth and earthwork in embankment to be in 20cm layers, including ramming and dressing the surface to required levels & slope & also including 1.50m lift & 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the Engineer-in-Charge. (Excluding Royalty) S.I. No. 253 | 281.35 | CUM | 346.27 | ₹97,423.06 |
| 1.04 | Providing and laying cement concrete in 1:6:12 (1 cement : 6 Fine sand : 12 Brick ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 273) | 46.74 | CUM | 3,600 | ₹1,68,264 |
| 1.05 | First class brick work in 1:4 cement and fine sand of 1.25 FM. Mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | 178.73 | CUM | 5,350 | ₹9,56,205.5 |
| 1.06 | Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I. | 29.21 | CUM | 7,645 | ₹2,23,310.45 |
| 1.07 | 12 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc S.I.No. 584(i) | 381 | SQM | 210 | ₹80,010 |
| 1.08 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceefing 0.5m in depth and earthwork in embankment to be in 20cm layers, including ramming and dressing the surface to required levels & slope & also including 1.50m lift & 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the Engineer-in-Charge. (Excluding Royalty) S.I. No. 253 | 285.75 | CUM | 165 | ₹47,148.75 |
| 1.09 | P/L of Granular sub base with coarse graded materials (Table 400-2 ) in granular sub base by providing coare graded materials, spreading in uniform layer with motor grader on preparing surface mixing by mix in place method with rotovator O.M.C. and compacting with power vibratory roller to achieve the desired density complete as per clause 401compected incluing lighting, guarding, barricating and maintance of diversion etc | 509.73 | CUM | 4,059 | ₹20,68,994.07 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 27.94 MB
BOQ_2183720.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid