Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹1.2 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | l2₹1.5 Cr+₹22.1 L (17.9%)Rejected-Finance 17 6 FLAT NO 06 SAROJ MANSION BUILDING 6TH STREET NANDANAM EXTENSION NANDANAM CHENNAI TAMIL NADU 600035 | CHENNAI | TAMIL NADU | 600035 | ₹1.5 Cr+₹22.1 L (17.9%) | l2 | Rejected-Finance L2 |
| 3 | l3₹1.5 Cr+₹25.4 L (20.6%)Rejected-Finance 320 NAWADA BAZAR GALI CHHWALIYAN NAJAFGARH SOUTH WEST DELHI 110046 | NEW DELHI | DELHI | 110046 | ₹1.5 Cr+₹25.4 L (20.6%) | l3 | Rejected-Finance L3 |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
26 Sept 2022, 2:00 pmClosed
GM,KTPS
KTPS Admin Building Second Floor
Overhauling of Boiler Pressure Parts at Unit 5 During Jan Feb2023
2022_WBPDC_398418_1
GMOH-5(K)/CC/BM/3470/E2201
Open Tender
Support/Maintenance Service
Item Rate
60 days
KTPS
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.6 L
Yes
KTPS
6 Feb 2023
1 Sept 2022
29 Sept 2022
1 Sept 2022
26 Sept 2022
23 Sept 2022
9 Sept 2022
Amount
Overhauling of Boiler drum
Scaffolding of FSH, PLSH, R/H
Cleaning of boiler pr. parts ( PLSH, RH by HP water jet )
Insertion of tube for FSH, PLSH, RH ( & LTSH, Joint )
Lifting & refitting of LTSH Coil
Removal, fabrication & fitting ( of guard tube & guard plate for PSH, RH,LTSH, Economizer,Cage wall, Baffle wall )
Removal & fitting of guard tube ( & guard plate for PSH, RH,LTSH, Economizer, Cage wall,Baffle wall )
Skin casing welding
Scaffolding of Economizer zone ( and cleaning of LTSH & Economizer Zone )
Repairing of Economizer hopper
Lifting of eco. Coil and refitting ( after repairing )
Insertion of Economizer tube, Joint
Fabrication of different size bends
Scaffolding of Furnace zone
Cleaning of Furnace zone by HP water jet
Insertion of furnace wall tubes, Joint
Deposition of weld metal ( on tubes/stubs/headers etc )
Stress Relieving for Pressure Welding jt
Welding of fins for boiler tubes
Fabrication of fins for boiler tubes
Sealing at top of bottom hopper ( by wooden planks, GI sheets & gunny bags )
Repairing/Replacement of Corner ( Buck-stay )
Inspection of Pent house
Repairing of Pent house
Cleaning & resetting sling at Pent house
Roof loose tube proper clamping
D-Metering of pressure parts ( (Minimum 5000 spots) )
DP test of Stub joints
Radiography of pressure welding joints ( Per snap )
Servicing of Drum / SH safety valve
Servicing of soot Blower safety valve
Replacement of HP valve ( size up to 2" (50mm) )
Replacement of HP valve ( size above 2" (50mm) to 4" (102mm ) )
hanger support OH work(cold setting)
hanger support OH work(hot setting)
Hiring of Escort crane with operator ( & fuel. )
Servicing of Wall blowers
Engagement of Expert for Hanger ( (cold & hot setting) )
Boiler External Cleaning
removal and reapplication of refractory
BROTHERS ENGINEERING AND ERECTORS LIMITED
Universal Construction Co.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .