Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance F 17 JIN KUSHAL SURI COMPLEX 230 A MASJID MOTH SOUTH EX II SOUTH EX II SOUTH DELHI DELHI 110049 | SOUTH DELHI | DELHI | 110049 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
3 Jan 2024, 2:00 pmClosed
DIRECTOR
OFFICE OF THE DIRECTOR, DAIRY DEVELOPMENT, ASSAM KHANAPARA, GUWAHATI-22
Engagement of a firm for NABL Accreditation of Milk Testing Laboratory, Khanapara
2023_AHVD_34737_1
DD/APART/108/2022/ECF No -347374/209
Limited
Miscellaneous Services
Item Rate
Guwahati
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
24 Jan 2024
20 Dec 2023
3 Jan 2024
20 Dec 2023
3 Jan 2024
20 Dec 2023
Amount
Phase 1
Study existing Laboratory infrastructure and recommendation of changes requirement accordingly. Conduct total GAP analysis as per the requirement of Accreditation body specific criteria
Phase 2
The Consultant (consultancy service provider) shall act as facilitator in development and approval of documentation suitable to Milk Testing Laboratory for its implementation and meeting requirements of ISO/IEC 17025:2017. Provide external training (4 Day online) on ISO 17025:2017 in compliance to the NABL requirement to concerned officers and the cost of the training shall be borne by the consultant. Providing awareness to our officers & chemists on ISO/IEC 17025:2017 in the form of workshop/seminar/in-house training in fulfilling the overall process of system development, implementation in line with NABL. Preparation of Quality Manuals, Management System Procedures (MSP), Formats and Registers. The consultant shall implement the Quality Management system, Document & Record control. Verification of Personnel, Environment conditions and Equipment. The consultant shall facilitate for calibration of all the instruments in the laboratory including measurements of uncertainty etc. as per NABL requirement. Verification of Handling of samples, Test methods, method validation, Test finding registers and Reporting of Results. The consultant shall assure the quality of Test Results. Implementation for Corrective and preventive action.
Phase 3
Internal Audit, Management Review meeting and preparation of minutes. Submission of Quality Manual to NABL for adequacy by Lead Assessor. Submission of application for accreditation to NABL. Facilitation in participation in inter laboratory comparison. Closure of Non-conformance by Assessor. Consultant shall be present at the time of pre Assessment Audit and final Audit by accreditation body and guide for closing the observations given by accreditation body. Also guide for submission of any corrective action to NABL. Any other jobs relevant for obtaining NABL accreditation.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .