Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.0 LAccepted-AOC | 1 | Accepted-AOC Agreement executed by him | |
| 2 | 2₹34.0 L+₹6.0 L (21.5%)Rejected-AOC | 2 | Rejected-AOC Second lowest |
Tender Value
₹31.2 L
EMD Value
₹46,800
Closing Date
14 Oct 2022, 2:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Sabarimala Development Project, TDB Building, Kumbazha Road, Pathanamthitta
SDP Pamba-M and M Festival 1198 ME-Overhauling and operation of Sewage Treatment Plant at Cheriyanavattom Pamba by Engaging Labour and, Supply of Spares-reg
2022_TDB_514415_1
SDP/EE/ET-108/22-23
Open Tender
Civil Works - Others
Item Rate
90 days
Pamba
Please refer NIT
5 documents required · 5 mandatory
₹2,950
₹46,800
11 May 2023
10 Oct 2022
15 Oct 2022
10 Oct 2022
14 Oct 2022
10 Oct 2022
Amount
Appendix-A -Overhauling of STP including Supply of spares & desludging B-56 type V belt.
Ball bearings SKF No-22308-E
Ball bearings SFK NO- 6307
Rubber gasket (6mm thick)
Love joy and spider bush set machined and matched for coupling 5 HP motor and pump.
Spider bush for 5HP pump set.
Love joy coupling for 20 HP pump set.
Rubber flap SPGL for 20HP pump set
Mk-1 DOL starter 230/ 440 V.
Mk-1 contractor 230/440 V.
MK-1 Spark Kit.
MK-1 Over load relay.
HRC fuse 80 /1100 A.
MK-1 coil 230/440V.
Terminal changing of 5HP electric motor Including labour charges.
Engaging Scavenger(Man coolies) for complete de-sludging of the four chambers of Parallel Plate Separator,2 nos of chambers of grit chamber, 2 nos of equalization Tank, chlorine chamber, sump of sludge drying bed.
Engaging Electrician(Technician) for the complete overhauling of pump sets,electric motor and panel boards at Sewage pumping Stations etc;
Engaging plumber(Fitter Grade 1) for the complete overhauling of pump sets,electric motor and panel boards at Sewage pumping Stations etc;
Hydraulic oil 68 for filter press.
Servicing of the Motors and reconditioning – Motors Having 5 HP , removing the damaged bearings , burnt winding and recondition the pump & motor ,re-winded the motor by using best quality winding materials, fixing the new bearings and assembling the motor and fix on the original position after painting of the Motors ( Primer and 2 coat epoxy )
Dismantling the defective motor part by part, removing burnt winding, recondition the care and rewind by using best quality winding materials and assembling the motor in its original position : - 3H P Motor
do 2HP Motor
Appendix-B- Engaging labour for the operation of STP for 67 days Plumber grade -I. (1 no./Shift for 3 shifts per days.1x3x67=201 days)
Electrician Grade -I(1 no /shift for the 3 shifts per day. for 67 days)
Scientist (1 no /shift for 2 shift per day)
Skilled Mazdoor (Bandhani)(1 no.per shift for 3 shift s per day. 1x3x67=201 days)
Pump operators (7 nos . Per shift for 3 shift s per day.)
Scavangers(7 nos .per shift for 3 shifts per day.)
man mazdoor (1 no /shift for 3 shift per day)
Appendix-C-Installation and Operation Of Departmental Pump Set. Conveyance charges of departmentally supplied diesel.
Rubber gloves 14 '' (disposable)
Rubber gloves 18'' (do)
Industrial leather gloves (14'')
Industrial leather gloves (18'')
cloth mask
HARILAL P.V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_737634.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .