Tender Value
₹24.2 L
EMD Value
₹48,449
Closing Date
12 Oct 2026, 3:00 pm4d left
Executive Engineer Sonamura Division PWD(RandB)
O/o the Executive Engineer Sonamura Division PWD(RandB) Sonamura Sepahijala Tripura
ofMelaghar PWD(RandB) SubDivision duringthe FY2026 27 SH Retaining Wall and allied works
2026_CEPWD_77618_1
62/EE/SNM /PWD (RandB) /2026-27
Open Tender
Civil Works - Roads
Percentage
120 days
Sonamura
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
₹48,449
6 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
6 Oct 2026 - 11 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Patch repairing / Maintenance of bituminous surface road using Jhama brick aggregate & Viscosity Graded bitumen (VG-30) Repairing pot-holes and making up small depressions with ramming or power rolling after removal/ disposal of disintegrated materials within a lead of 50 m, cutting pot holes to regular shapes with vertical edges and levelling the bottom, cleaning the same with compressed air or any other appropriate method including screening, cleaning of aggregates; and filling up with with jhama chips using bitumen of VG-30 @ 54 kg per m3 of loose volume of jhama brick chips, after applying tack coat of bitumen on sides and bottom @ 0.75 kg/ sqm and finishing the top of repaired surface levelled with adjoining area in proper grade and camber including spreading of sand @ 0.006 cum/ sqm of prepared road surface as per direction of the Engineer-in- Charge and all as per MoRD technical specification Clauses 1900, 502, 503 and 504 | 23.58 | cum | 11,464.03 | ₹2,70,287.44 |
| 2 | Excavation for Structures A.Without dewatering. Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, dewatering, construction of shoring, shuttering & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. i) ordinary soil upto 3 mtr depth. | 344.85 | cum | 458.2 | ₹1,58,010.27 |
| 3 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. I. Sand Filling. | 15.68 | cum | 1,253.13 | ₹19,642.81 |
| 4 | Providing concrete for plain concrete (Using Jhama Brick aggregate) in open foundations complete including formwork as per drawings & Mord Technical Specification Clause 802, 803, 900,1202 and 1203 ( including centering , Shuttering , staging etc. but excluding reinforcement) I.P.C.C Grade M10( Using Jhama Brick Aggregate ) I. Nominal Mix 1:3:6 | 15.68 | cum | 9,322.43 | ₹1,46,129.09 |
| 5 | Plain/Reinforced cement concrete in substructure complete including formwork as per drawings & MORD technical specification Clauses 802,804,805,806,807,900,1202 & 1204 ( including centering, shuttering, staging etc. but excluding reinforcement ) I. RCC Grade M25 i) upto 5 m height | 74.66 | cum | 13,019.4 | ₹9,72,067.46 |
| 6 | Supplying, Fitting & placing Thermo - Mechanically Treated Bar / Cold twisted deformed steel bar in substructure complete as per drawing & MoRD Technical Specification Clause 1002, 1005, 1010, and 1202. | 7.47 | T | 91,869.5 | ₹6,85,897.69 |
| 7 | Providing Weepholes in Brick masonry / stone masonry, plain / reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm OD of 6.0 kg/cm2 pressure ) extending through the full width of the structure with slope of 1(V) : 20(H) towards drowing face complete as per drawing and MORD Technical Specificaton Clause 614, 709, 1204.3.7. | 33 | m | 392.2 | ₹12,942.6 |
| 8 | Providing & laying filter media with jhama brick aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil & bigger size towards the wall & providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and MoRD technical specification clause 1204.3.8. | 26.4 | cum | 4,723.36 | ₹1,24,696.7 |
| 9 | Construction of Embankment with Material Obtained from Borrow Pits. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical
Specification Clause 301.5. | 133.65 | cum | 245.4 | ₹32,797.71 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.35 MB
DNIeT62EE.pdf
Tender Documents • 2.91 MB
BOQ_79005.xls
BOQ • 0.28 MB
Addl62EE.pdf
Additional Documents • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .