Tender Value
₹84.0 L
EMD Value
₹84,032
Closing Date
29 Sept 2026, 5:00 pm6d left
Divisional Officer
RURAL WORKS DIVISION, BANSPAL
Construction of RW rest shed building at RW Division Banspal for the year 2026-27_building
2026_CERWI_141332_1
Building Online NCB No.07
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
BANSPAL
2 documents required · 2 mandatory
₹10,000
₹84,032
Yes
21 Sept 2026
21 Sept 2026
30 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
21 Sept 2026 - 28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK- Earth work in Excavation in hard soil or gravelly soil within 50m intial lead and lifts 1.5 M intial lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site including cost of all labour, T&P and dewatering if required for the work etc. complete as per drawing and Technical specification and as directed by the Engineer-in-Charge. | 117.07 | cum | 282.88 | ₹33,116.76 |
| 2 | Supplying and filling in foundation and plinth with sand, laying in layers, well watered and rammed including cost, conveyance, royalties and taxes of all materials, cost of all labour and T&P etc. complete in all respect as per direction by the Engineer in charge. | 150.42 | cum | 1,074.07 | ₹1,61,561.61 |
| 3 | Providing and laying PCC (1:3:6) in foundation and floors using 4cm size crushed stone granite aggregates including laying in layers ramming watering and curing etc. complete including cost conveyance royalties taxes of all materials and cost of all labours T&P etc complete as per the direction of the Engineer in charge. | 36.33 | cum | 6,540.84 | ₹2,37,628.72 |
| 4 | Fly ash brick masonry in Foudation of all floors with cement mortar (1:6) using bricks of 25cm size, after immersing Bricks before use with watering, curing etc. complete including cost, conveyance, royalties, taxes of all materials, cost of all labour, all T&P etc. complete in all respect as directed by the Engineer-in-charge. (Ground Floor) | 9.3 | cum | 5,830.58 | ₹54,224.39 |
| 5 | Super Structure (Ground Floor) | 49.78 | cum | 5,868.92 | ₹2,92,154.84 |
| 5.01 | Super Structure (First Floor) | 67.61 | cum | 6,254.89 | ₹4,22,893.11 |
| 5.02 | Super Structure (Second Floor) | 19.3 | cum | 6,698.76 | ₹1,29,286.07 |
| 6 | Fly ash brick masonry in all floors with cement mortar (1:4) using bricks of 23cm size, after immersing Bricks before use with watering, curing etc. complete including cost, conveyance, royalties, taxes of all materials, cost of all labour, all T&P etc. complete in all respect as directed by the Engineer-in-charge. (Super Structure) | 2.04 | cum | 6,104.03 | ₹12,452.22 |
| 6.01 | Super Structure (First Floor) | 2.04 | cum | 6,490 | ₹13,239.6 |
| 7 | Back Filling of surplus excavated earth at work site by initial lead and lift of 1.50mtr including cost of all labour T&P required for the work etc. complete as directed by Engineer-In-Charge | 117.07 | cum | 157.16 | ₹18,398.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.50 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_610233.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .