Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹279 CrAccepted-AOC | ₹279 Cr | 1 | Accepted-AOC Lowest bidder |
| 2 | 2₹284.7 CrRejected-Finance 302 3 FLOOR DLF TOWER B JASOLA NEW DELHI 110025 | ₹284.7 Cr | 2 | Rejected-Finance Not the lowest bidder. |
| 3 | 3₹286.2 CrRejected-Finance | ₹286.2 Cr | 3 | Rejected-Finance Not the lowest bidder. |
| 4 | 4₹287.3 CrRejected-Finance | ₹287.3 Cr | 4 | Rejected-Finance Not the lowest bidder. |
| 5 | 5₹291.2 CrRejected-Finance DEE VEE HOUSE MAULSHREE VIHAR IN FRONT OF HOTEL BABYLON INTERNATIONAL VIP ROAD RAIPUR 492006 CHHATTISGARH | ₹291.2 Cr | 5 | Rejected-Finance Not the lowest bidder. |
Tender Value
₹310.1 Cr
Closing Date
17 May 2021, 6:00 pmClosed
AGM. (Civil)
Rajiv Gandhi Bhawan, Safdarjung Airport New Delhi
Construction of Passenger Terminal Building and Allied works for New Greenfield Airport at Hirasar Rajkot, Gujarat, India
2021_AAI_68792_1
AAI/CHQ/ENGG/WR/HIRASAR/TB
Open Tender
Construction Works
540 days
Hirasar, Rajkot
Please refer Tender Document
13 documents required · 13 mandatory
₹11,800
Exempted
23 Aug 2021
16 Feb 2021
19 May 2021
16 Feb 2021
17 May 2021
19 Mar 2021
16 Feb 2021 - 30 Mar 2021
Amount
Detailed designing, Engineering, Procurement and Construction (EPC) of Passenger Terminal Building, ATC cum Technical Block & Allied Works for New Greenfield Airport at Hirasar Rajkot for Domestic and International operations with earth work, RCC / Steel structures, etc. as set forth in Schedule - A and as specified in Schedule - B together with provision of project facilities as specified in Schedule - C and in-conformity with the specifications and standards set forth in Schedule - D, including performance and fulfillment of all other obligations of the contractor and ensuring compliances to all provisions contained elsewhere in the contract and in accordance with the provisions of this tender and matters incidental there to necessary for the performance of any and all the obligations of the contractor under this tender. Scope of work shall also cover operation for period of 7 years including DLP of 2 years and maintenance for period of 7 years including AICMC for period of 5 years after DLP. Bidder shall include cost of maintenance for 7 years (including AICMC for period of 5 years after DLP) in this quote as set forth in Schedule -N (PART - B). However, bidder shall not include cost for operation in this quote. Cost of operation like applicable minimum labour wages, PF, ESIC etc. for period of 7 years shall be reimbursed by AAI on actual basis after submission of duly verified documentary evidence as set forth in Schedule - N (PART - A). The bidder shall quote the offer excluding GST.
Swadeshi Civil Infrastructure Private Limited
DEEPAK BUILDERS AND ENGINEERS INDIA PRIVATE LIMITED
KEC International Ltd
DEE VEE PROJECTS LIMITED
National Projects Construction Corporation Limited
ISGEC Heavy Engineering Ltd
Capacite Infraprojects Limited
CUBE CONSTRUCTION ENGINEERING LIMITED
URC CONSTRUCTION PVT LTD
Ahluwalia Contracts (India) ltd.
Kunal Structure (India) Pvt. Ltd.
VASCON ENGINEERS LTD
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid