| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.6 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹23.7 L+₹10,781 (0.46%)Rejected-Finance | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹30.1 L+₹6.4 L (27.2%)Rejected-Finance DOOR NO 15 1 141 BHAVANA ENCLAVE 1 NEAR HOTEL GRAND BAY MAHARANIPETA NOWAROJI ROAD VISAKHAPATNAM 530002 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530002 | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹30.4 L+₹6.8 L (28.7%)Rejected-Finance | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹31.3 L+₹7.7 L (32.6%)Rejected-Finance | L5 | Rejected-Finance Not Being L1 |
Tender Value
₹28.5 L
EMD Value
₹57,040
Closing Date
16 Mar 2020, 6:00 pmClosed
GE I DM
GE I DM DOCKYARD VISAKHAPATNAM 530014
REPAIR /REPLACEMENT OF VARIOUS TYPES CONTROL VALVES/CONDENSERS AND MISC WORKS OF AC PLANTS AT NAVAL DOCKYARD VISAKHAPATNAM
2019_MES_304862_2
SSGE/8199/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
DOCKYARD VISAKHAPATNAM
As per tender documents
6 documents required · 6 mandatory
₹500
GE I DM
₹57,040
Yes
30 Apr 2020
2 Mar 2020
18 Mar 2020
2 Mar 2020
16 Mar 2020
2 Mar 2020
Amount
Supply and fix stainless steel ball valves (ball of stainless steel) for liquid line of size 50 mm dia with necessary modification work as required at site including dismantling existing unserviceable valves complete all as specified and as directed.
All as per item No 1.00 above but for 40 mm dia
All as per item No 1.00 above but for 25 mm dia Make for item Nos. 1 to 3 :- Audco/Shakti/Zoloto
Supply & fix medium grade ISI marked GI pipes of 150 mm bore as in condenser water line of following sizes with fittings and fixed complete to walls and ceilings or laid in floors including taking down the corroded pipes complete all as specified and as directed.
All as per item No 4.00 above but for 100 mm bore
All as per item No 4.00 above but for 80 mm bore
All as per item No 4.00 above but for 40 mm bore
All as per item No 4.00 above but for 25 mm bore
All as per item No 4.00 above but for 20 mm bore Make for item Nos. 4 to 9 :-Tata/Jindal/Oswal/Kalinga
Supply and fix butterfly valves of 80 mm bore in pipe lines of AC plants with necessary modification to flanges, welding, nuts & bolts as required at site including dismantling existing unserviceable valves complete all as specified and as directed
All as per item No 10.00 above but for 100 mm bore
All as per item No 10.00 above but for 150 mm bore
All as per item No 10.00 above but for 200 mm bore Make for item Nos. 10 to 13 :-Audco/Shakti/Zoloto
S & F for VVE-70 model expansion valve of Sporlon make with necessary modification, brazing ,leak testing and commissioning including taking out old unserviceable expansion valve complete all as specified and as directed.
All as per item No 14.00 above but for VVE- 52 model
Material and labour for provision of insulation on supply air duct with 25 mm thick fiber glass having factory aluminum foil on external face of the insulation complete all as specified and as directed.
Material and labour for insulation with 50 mm thick (TF quality) fire resistant thermocole duly fixed with approved quality adhesive including applying a coat of bituminous paint, necessary hardware for fixing thermocole on return air duct duly wrapped and secured with vapour barrier made out of alkathene sheet of 0.05 mm thick wound with 24 SWG GI chicken wire mesh and plastering in CM (1:4) 10 mm thick to the wire mesh surface complete all as specified and as directed.
Material and labour for removing perished acoustic insulation and providing new acoustic insulation with 12 mm thick fiber glass rigid board covered with 26 gauge perforated aluminum sheet fixed to the duct with approved quality adhesive including necessary hardware complete all as specified and as directed.
Material and labour for checking the complete refrigerant system of the AC plant of 10 to 20 TR capacities, leak testing with Nitrogen gas under constant pressure of 250 PSI after complete transfer of refrigerant gas from the entire system, rectification of leakages including cutting and brazing the refrigeration system wherever required, replacement of ‘O” rings, Teflon washers of valves, copper tubing, flare nuts etc., neutralizing after the pressure holds good for at least 24 hours, vacuumization, charging the system with refrigerant gas, testing and commissioning of AC plant complete all as specified and as directed :- Note:- Refrigerant gas will be measured and paid for separately as supply only under relevant item.
All as per item No 19.00 above but for 30 TR capacity
All as per item No 19.00 above but for 75 to 120 TR capacity
Material and labour for taking out the defective pressure cut-outs of any range and model and supply & fix new HP/LP pressure cut-out MP-15 , connecting the pressure lines/control wiring, leak testing and commissioning complete all as specified and as directed
All as per item No 22.00 above but for Water pressure cut-out IPS-70
All as per item No 22.00 above but for Low pressure cut-out MP-1
All as per item No 22.00 above but for High pressure cut-out MP-5
All as per item Ser No 22.00 above but for Oil pressure cut-out MP-55 Make for item Nos. 22 to 26 :-Indofoss/Danfoss/Ranco
Material and labour for preparation of surfaces by scrapping and removing rusted portion with wire brush and applying one coat of synthetic enamel paint for complete refrigeration system, in-let/out-let pipe lines, compressor unit, condenser pump set, control LT panel board duct covers, cooling tower stand including lettering & numbering and applying one coat of white/colour wash to chiller pipe line complete all as specified and as directed.
Material and labour for complete checking, servicing/ rectification of electrical circuits for all units and control wiring showing phase sequence with proper lugging of AC plant control panel including replacement of fused indication lamps with new ones, cleaning of all power contacts, rectification of minor defects in Ammeters and Voltmeters, testing and commissioning complete all as specified and as directed.
Material and labour for repairs and servicing of blowers including dismantling and re-building the shaft at worn-out places, machining to it’s original size, replacement of worn out bearings and checking of alignment complete all as specified and as directed.
Supply and charging of R-22 gas complete all as specified and as directed. Make:- Refron 22/Floron 22/Mafron 22
VENKATESWARA TECHNOLOGY
SRIESWARI ENTERPRISES
HARSHITHA INFRA
M/s SIRI INFRA
LAKSHMI SAI CONSTRUCTIONS
sri sai ram constructions
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .