Superintending Engineer
(132/33 KV Campus), Gauriganj, Distt. Amethi.
68/E.D.C.(G.)/2025-26
2026_MVVNL_1117673_1
68/E.D.C.(G.)/2025-26
Open Tender
Electrical Works
Lump-sum
365 days
EDSD-Jagdishpur, Distt. Amethi.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE
₹2,463
18 Feb 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Superintending Engineer, EDC, Gauriganj
Name of Work: Line related different work of Deposit Scheme/ Vidhayak Nidhi/Sansad Nidhi in the area of EDSD-Jagdishpur under EDD-Jagdishpur, Distt. Amethi. (Running Contract)
Tender No: 68/E.D.C.(G)/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Work Description Item Code / Make Quantity Unit Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category PERIOD IN month
1 Loading, carriage of following items from Store Centre, Gauriganj/Sultanpur to dump store including unloading and proper stacking (distance 0-70 km.) (Sl. No. 2 - 18)
2 STP/PCC pole. 27 No. Excess(+) Full Conversion INR
3 ACSR Weasel Conductor 2.5 Km. Excess(+) Full Conversion INR
4 V type X Arm 20 No. Excess(+) Full Conversion INR
5 25/63/100 KVA Transformer 2 No. Excess(+) Full Conversion INR
6 Pilfer proof metering cubical 1 No. Excess(+) Full Conversion INR
7 11 KV cable box indoor/outdoor 2 No. Excess(+) Full Conversion INR
8 11 KV pin/disk insulator with nuts & bolts 30 No. Excess(+) Full Conversion INR
9 Top Channel. 5 No. Excess(+) Full Conversion INR
10 G.I. wire 20 Kg. Excess(+) Full Conversion INR
11 Stay Set complete 15 No. Excess(+) Full Conversion INR
12 Earthing complete 25 No. Excess(+) Full Conversion INR
13 Dropper Angle 10 No. Excess(+) Full Conversion INR
14 T-off channel 10 No. Excess(+) Full Conversion INR
15 S/S base angle 15 No. Excess(+) Full Conversion INR
16 L.T. ABC Three phase/Single Phase 50 Mtr. Excess(+) Full Conversion INR
17 Other Line Materials 27 Ls./Pole Excess(+) Full Conversion INR
18 Dragging of STP/PCC Pole from dump store to pit site. 27 No. Excess(+) Full Conversion INR
19 Digging of pits up to the depth of 1650/2200 mm. as per site requirement. Fabrication & erection of single pole support on PCC/STP pole support including digging of pit & fixing of all accessories and clamps as per RESPO norms. 21 No. Excess(+) Full Conversion INR
20 Digging of pits up to the depth of 1650/2200 mm. as per site requirement.Fabrication & erection of double pole support on P.C.C./STP pole including digging of pit & fixing of all accessories and clamps as per RESPO norms. 3 No. Excess(+) Full Conversion INR
21 Grouting of STP/PCC pole in ratio 1:4:8 with cement stone ballast, coarse sand and plinthing 300 mm above ground level as well as muffing of plinth. 27 No. Excess(+) Full Conversion INR
22 Spreading, laying & stringing of ACSR weasel conductor for construction of 11 KV line as per RESPO norms. 0.8 Ckt./Km. Excess(+) Full Conversion INR
23 Spreading, Laying & Stringinging of AB cable Three phase/Single Phase 50 Mtr. Excess(+) Full Conversion INR
24 Ordinary earthing by 11 KV MS earth rod 2500 mm long as per RESPO norm. 25 No. Excess(+) Full Conversion INR
25 Concreting & nuzzling of stay complete including fixing of necessary clamps with the help of nuts & bolts other accessorise required for completing the work as well as its grouting by civil material viz. Sand, stone ballast and cement. The contractor will provide all civil material as well as stay insulator 15 No. Excess(+) Full Conversion INR
26 Guarding of line as per RSPO norms. 1 Span. Excess(+) Full Conversion INR
27 Installation of 25/63/100 KVA Transformer on newly constructed Double/single pole making proper connections from 11 KV system and proper testing as well as commissioning of Transformer. 2 No. Excess(+) Full Conversion INR
28 Installation and commissioing of pilfer proof metering cubical in metering room. 1 No. Excess(+) Full Conversion INR
29 Installation of 11 KV indoor/outdoor cable Box as per RESPO norms. 2 No. Excess(+) Full Conversion INR
30 Tree cutting for clearance of 11 KV/LT line. 2 Job. Excess(+) Full Conversion INR
31 Providing and fixing of Holding Clamp for PCC/ST Pole (Cross Arm) 10 No. Excess(+) Full Conversion INR
32 Providing and fixing of Holding Clamp for top channel (STP/PCC) 15 No. Excess(+) Full Conversion INR
33 Providing and fixing of F Braket 10 No. Excess(+) Full Conversion INR
34 Providing and fixing LT shakle Insulator on PCC/ST Pole 5 No. Excess(+) Full Conversion INR
35 Providing and fixing Stay Insulator on PCC/ST Pole 7 Job. Excess(+) Full Conversion INR
36 Dismentaling of 11 KV/33 KV/LT Line 1 Job. Excess(+) Full Conversion INR
37 Note: Any quantity of item from sl no. 1 to sl no. 37 may vary to any limit within the financial value of agreement against this tender.
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
TDN_68.pdf
Tender Documents • 0.83 MB
BOQ_2076854.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .