Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.5 L
EMD Value
₹12,520
Closing Date
14 Oct 2026, 6:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, panchayat, R & B Division, Surat.
Package No. 1 /BAR/80-20/ER to BT/3-RD/25-26 (1)Const. of Bitumin Road At Orgam Village Bhil Faliya from Vishal Halpati house towards Jayantibhai Lallubhai Patel farm ,Ta: Bardoli Dist: Surat. (2) Const. of Bitumin Road At Palsod Village from char rasta towards Dineshbhai Sharma house kolivad faliya ,Ta: Bardoli Dist: Surat. (3)Const. of Bitumin Road At Zarimora Village from Kunvarjibhai Halpati house to Ketanbhai house ,Ta: Bardoli Dist: Surat(4TH TIME)
349710
09 OF 2026-27
Open
Civil Works - Others
Works
Surat
5 documents required · 5 mandatory
₹900
Executive Engineer, panchayat R & B Division, surat
₹12,520
28 Sept 2026
28 Sept 2026
28 Sept 2026
14 Oct 2026
28 Sept 2026
Name of work: Package No. 1 /BAR/80-20/ER to BT/3-RD/25-26 (1)Const. of Bitumin Road At Orgam Village Bhil Faliya
from Vishal Halpati house towards Jayantibhai Lallubhai Patel farm ,Ta: Bardoli Dist: Surat. (2)
Const. of Bitumin Road At Palsod Village from char rasta towards Dineshbhai Sharma house kolivad
faliya ,Ta: Bardoli Dist: Surat. (3)Const. of Bitumin Road At Zarimora Village from Kunvarjibhai
Halpati house to Ketanbhai house ,Ta: Bardoli Dist: Surat.
Memorandum showing items of works to be carried out
It. No. Quantities Item of work Estimated Total Amount
It. No. Quantities Item of work Estimated Total Amount
estimated but may In figures according to estimated
be more or less Rs. Ps. quantities
1 Hect. Clearing and grubbing road land, including uprooting rank
vegetation, grass bushes, shrubs, saplings, and trees girths up to
mm, removal of stumps of trees cut earlier, and disposal of
0.20 unserviceable materials(D) By mechanical means in area of thorny 34889.38
2 Cu.mt Supplying, Stacking, Spreading & rolling of G.S.B-II on road side
for hard side shoulder of work as per specification including filling
58.40 the mesure boxes of standard size etc. complete. 649.43
3 Cu.mt. Earthwork in cuting in all sorts of soil and soft murrum including
conveying and spreading the stuff, embankment as and where
directed within 200meters from the end of the cutting with all
required lead and lift.
4 M.Ton Providing, laying 25mm thick compacted bituminous carpet
considering 0.66 cmt./10Smt. Stone chips for one M.ton as per
specification, using the asphalt at VG-30 rate 33.60 Kg/M.ton (i.e.
3.36% by weight of total mix)and asphalt for tack coat at RS-1 rate
2.5 Kg/ 10sq.mt. including heating and mixing the asphalt and stone
41.00 aggregates by continuous batching of drum mix plant and 3794.90
transporting and spreading the same by paver finisher and consoli-
dation with vibratory roller with necessary equipments oil,
kerosene,fire wood labour charges etc comp.with contractor's own
machineries and equipment tools etc. complete in accordance with
the requirement.
5 M.Ton Providing, laying 37.50 mm thick compacted Bituminous Macadam
considering 0.66 cmt./10Smt. Stone chips for one M.ton as per
specification,VG-30 using the asphalt at rate 34.00 Kg/M.ton (i.e.
3.40% by weight of total mix) for mixing and VG-30 for tack coat at
rate 2.5 Kg/ 10sq.mt. including heating and mixing the asphalt and
stone aggregates by continuous batching of drum mix plant and
74.00 transporting and spreading the same by paver finisher and consoli- 3764.47
dation with vibratory roller with necessary equipments oil,
kerosene,fire wood labour charges etc comp.with contractor's own
machineries and equipment tools etc. complete in accordance with
the requirement.
6 Cu.mt. Providing and laying speading and compacting graded stone
aggregate to Wet Mix Macadam(WMM) in One layer as per
specification and drawing including premixing the Material with
water at OMC in mechanical mix plant carriage by tipper to
25.00 site,laying in unifrom layer with paver in sub-base/base course on 797.00
well prepare surface and compacting with vibrator rollar to achive
the desired density as per MORTH fifth revision clause-406.
7 Sq.mt. Providing and applying evenly Priming coat with emulsion asphalt at
the rate of 7.50 Kg/ 10 Sq.m on road surface using emulsion SS-1
(Himcol Made) pressure spreayer etc. complete including the cost of
8 M.Ton Providing and laying seal coat with B.T. aggregate as specified
using aggregate at the rate of 0.18 Cu.mt./10 Sq. mt. and bitumen
grade VG-30 for mixing with aggregate at the rate of 4.5 % i.e.
Kg. / M.T. of total mix including heating and mixing in drum mix
plant and transporting and spreading the same by paver finisher and
consolidation with vibratory roller including necessary fire wood , oil
, lubricant , labour charges using contractor's own drum mix plant,
machineries and equipment tools etc. complete in accordance with
the requirement of specification
Rs. Twelve Lack Fifty One Thousand Five Hundred Eighty One and Paise Eighty Seven Only.
I/We am/are willing to carry out the work at ________________ % above/below ( percent should be written in figures and in
words ) of the estimated rates mentioned above. Amount of my/our tender works out as under.
*Estimated amount *Estimated amount
put to tender Rs. 1251581.87 put to tender Rs.
Deduct ____ % below Rs. _________ Add ____ % above Rs. _________
Net Rs. _________ Total Rs. _________
*( Please strike out which ever is not applicable )
Note : Credit Amount of Rs.41070 of Serviceable Material shall be deducted from 1st Running Bill.
Note 1:- The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
Charge for which no extra payment shall be made.
Note 2 :- The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3:- GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4:- In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Signature of Bidder
Deputy Executive Engineer Executive Engineer
Panchayat (R&B) Sub Division Panchayat (R&B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3.Cement Standards -11-05-17 GR 2 Side.pdf
4.Tender Negotiation.pdf
5.Laboratory GR.pdf
6.GST GR.pdf
7.Steel Lap.pdf
11. Other GR.pdf
8.Clause 47 48.pdf
14 Building Booklet civil.pdf
Cement consumption gr.pdf
GST GR 1.pdf
Inspection 1.pdf
Laboratory GR 1.pdf
Steel Lap 1.pdf
5.GR.pdf
4.0 tender booklet.pdf
GR.pdf
Environment GR_11zon (1).pdf
Performance Bond and Bitumen date.pdf
6SBD GR.pdf
00-FRONT PAGE.pdf
03.final SBD cc road.pdf
04- SPECIFICATION 4 Road.pdf
05-GR.pdf
Schedule-BOQ PKG-1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .