Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹53.0 LAccepted-Finance | L-1 | Accepted-Finance Admitted | |
| 2 | L-2₹55.5 L+₹2.5 L (4.79%)Accepted-Finance | L-2 | Accepted-Finance Admitted | |
| 3 | L-3₹60.2 L+₹7.2 L (13.5%)Accepted-Finance | L-3 | Accepted-Finance Admitted |
Tender Value
₹69.4 L
EMD Value
₹70,000
Closing Date
8 Feb 2021, 4:00 pmClosed
Sjuperintending Engineer
Electricity Transmission Circle Pathrahiya Road Mirzapur
Construction of extended part of 132 KV Aurai(400)-Raja Talab SC line up to 220 KV GI sub-station Bhadohi, under Electricity Transmission Division-IV, Varanasi
2021_UPTCL_543219_1
27/2020-21/ETC/Mzp
Open Tender
Electrical Works
Fixed-rate
150 days
Bhadohi
As per tender specification
2 documents required · 2 mandatory
₹8,260
Executive Engineer, ETD, Mirzapur
₹70,000
10 Feb 2021
4 Jan 2021
9 Feb 2021
4 Jan 2021
8 Feb 2021
4 Jan 2021
Amount
[A] Supply
Tower Accessories
Earthing material (Pipe type)
Number plate
Danger plate
phase plate(set of three color red, blue and yellow)
Anchor Bolt with Double Nut & washer
Conductor Accessories for Panther Conductor
Single Suspension fitting complete in all respect for ACSR Panther conductor
Single tention fitting complete in all respect for ACSR Panther conductor
Double tention fitting complete in all respect for ACSR Panther conductor
Vibration damper
Mid Span Compression Joint
Repair Sleeve
Perforated Armour Rod
GI Earth Wire & Accessories
7/10 SWG Earth Wire
Single Tension Fitting for 7/10 SWG E/W
Single Suspension Fitting for 7/10 SWG E/W
Vibration damper for 7/10 SWG E/W
Copper Bond
MSC Joint for 7/10 SWG Earth Wire
[B] Work
Detailed survey using GPS, total station machine long range scanner and digital theodolites including route alignment, profiling, optimization of tower location, preparation of tower schedule, preparation of proposal for power line crossing, NH crossing, Railway crossing, forest clearance etc and all other required details.
Check survey and final peg marking.
Cost of excavation of 132 KV DC tower foundation pits including all earth work, back filling, levelling etc. Normal soil Dry/wet/PS/FS
Installation of steel reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting, bending, placing and binding including all cost of men, material and T&P.
Setting of stubs of following 132 KV DC towers (setting of foundation bolt of gantries shall not paid extra) rate includes carriage of stubs from UPPTCL store to site.
Cost of concreting for all types of tower foundation with ratio 1:2:4 including cost of cement, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars.
Erection of super structure of all type of towers and their extensions wherever required and all work above ground level including fitting of danger board, phase plate and punching of bolts.(weight of tower is excluding the weight of stub,washer, nut&bolts etc including all cost of T&P, labour charges and carriage of structure of towers from UPPTCL store to site.
Tack welding of all the bolts up to the height of one section of tower or 5 meter from the ground level whichever is higher with 3 tacks at 120degree seperation of minimum 10 mm thickness and application of zinc rich aluminium paint on the affected surface including cost of all material and T&P.
Pipe type earthing at required towers (rates includes cost of coke, salts, digging, lug pressing, back filling, ramming &leveling etc.) but excluding the cost of pipe type earthing set including all cost of labour and T&P.
Laying, tensioning, stringing, clamping and jointing etc. complete with ACSR Panther conductor of all phases of D/C line including hoisting of insulator, fitting of all necessary hardwares and accessories etc. of all six phases including all cost of labour, T&P and carriage of conductor from UPPTCL store to site (clearing of line corridor etc.)
Laying, stringing, tensioning, clamping, jointing, including fitting of all necessary hardware and accessories for one no. 7/10 SWG Earth Wire including carriage of earth wire from UPPTCL store to site.
shiv shankar enterprises
M/S SHEKHAR ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .