Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹74.0 LAdmitted-Fee/PreQual/Technical/Finance | -35.67% | ₹74.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹74.2 L+₹19,548.76 (0.26%)Admitted-Fee/PreQual/Technical/Finance | -35.50% | ₹74.2 L+₹19,548.76 (0.26%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹80.0 L+₹6.0 L (8.15%)Admitted-Fee/PreQual/Technical/Finance | -30.43% | ₹80.0 L+₹6.0 L (8.15%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹87.8 L+₹13.8 L (18.7%)Admitted-Fee/PreQual/Technical/Finance | -23.65% | ₹87.8 L+₹13.8 L (18.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹88.5 L+₹14.6 L (19.7%)Admitted-Fee/PreQual/Technical/Finance | -23.00% | ₹88.5 L+₹14.6 L (19.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
9 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Ganderbal
Executive Engineer RnB Division Ganderbal
Repairs/Restoration and conservation of Remains at Jarokhabagh Manasbal Ganderbal.
2026_PWDJK_323407_2
NIT No.62-2026-27
Open Tender
Civil Works
Percentage
365 days
Ganderbal
as per NIT
2 documents required · 2 mandatory
₹2,600
Executive Engineer RnB Division Ganderbal
₹2.3 L
17 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairs/Restoration and conservation of Remains at Jarokhabagh | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 892.19 | Sqm | 12.49 | ₹11,143.45 |
| 1.02 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto50 meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil | 446.1 | Sqm | 91.75 | ₹40,929.68 |
| 1.03 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in- Charge. ( All kinds of soil :) | 22.89 | Cum | 592.9 | ₹13,571.48 |
| 1.04 | P/L, Supplying and filling of dry stone soling duly hand packed for foundation ,footings, floors etc with ramming, dressing, and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved finished work to be measured complete. | 20.71 | Cum | 950 | ₹19,674.5 |
| 1.05 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) complete. | 7.76 | Cum | 5,202.9 | ₹40,374.5 |
| 1.06 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In lime mortar | 214.1 | Cum | 820.4 | ₹1,75,647.64 |
| 1.07 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar all complete. | 6.83 | Cum | 1,740.45 | ₹11,887.27 |
| 1.08 | Raking out joints of stone masonry surface to the required width and depth, with due care and precaution by mechanical/manual means including preparing and cleaning the surface for re-pointing / refilling of joints, including disposal of rubbish to the dumping ground within 50 mtrs lead all complete | 1,325.58 | Sqm | 51.45 | ₹68,201.09 |
| 1.09 | Flush pointing on white sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio 1:1.5:1/2 one lime : 1.5 surkhi (50% red and 50% light yellow surkhi):1/2 marble dust ( the rate is inclusive of all materials and labours involved except scaffolding) | 2,172.98 | Sqm | 284.7 | ₹6,18,647.41 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1088245.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .