Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹2.0 Cr
EMD Value
₹2 L
Closing Date
26 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Minicipal Commissioner - West Zone
MAKING RCC ROAD & PAVER BLOCK WORK AT GAMTAL AREA,KIRANPARK ,SORABAJI COMPUND AREA AND DIFF PLACES & RANIP,NIRNAYNAGAR,CHANDLODIYA AREA AND DIFF PLACES UNDER M.P SHREE/MLA SHREE/COUNCILLOR SHREE,CHAIRMAN SHREE/MAYOR SHREE/SWARNIM /CAPITAL/REVENUE BUDGET IN NAVA VADAJ WARD OF WZ(ARC)(SHEDULE OF MEINTANANCE TYPE WORK)
367570
3/26-27 (T.N. 14)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹3,600
Municipal Commissioner, Ahmedabad
₹2 L
23 Nov 2026
23 Nov 2026
23 Nov 2026
26 Nov 2026
23 Nov 2026
120 days
2. Tender Estimated Cost Rs.1,99,99,999.68 /-
1% of the Tender Cost in the form (Rs.200000/-)
3. Earnest Money
(D.D./Pay Order /B.G.)
4 Tender Fee Rs Demand Draft of Rs.3600.00
6. Time-Limit 12 months
7. Validity Period 120 Days
(i) Last Date of Submission of the
a) In Sealed cover in duplicate copies byRegistered
(ii) Mode of Sending Post A.D, or by Courier.or handdelivery
b) Tendersentbyordinarypostwillberejectedoutright.
(iii) Description essential to be
a) Nameofwork,TenderNoticeNo.&TenderNo.
made on sealed cover b) DateofreceivingtenderbyCorporations.
(iv) Mode of quoting rates in
ThePricebidshallbesubmittedonlineonly.
Schedule of Quantities and Rates ItshallnotbesubmittedPhysically.
9. Date of Opening AS PER NIT
Submission of EMD. Tender fee and other
Place of Submission & Opening of Documentsduringofficehours: AS PER NIT
10. WestZone,2ndFloor,A.M.Office,Stadium Sub Zonal Office , Nr.
Tender Panchshil Water Tank, Naranpura Railway Crossing Ahmedabad
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and
11. Penalty Due to Delay of work
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
3 YEARS AFTER COMPLITION OF EVERY WORK &
12. Defect Liability
SECUIRITY DEPOSIT WILL BE RELEASED AFTER
COMPLITION OF DLP PERIOD
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
to start the works within 48 hours of intimation of work.
Communication done telephonically via SMS, Via Whatsapp and
through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
Time permitted to start parts of as above by contractor the contractor shall be levied penalty of (1)
work Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk Ítulj ytuVem/v.J.yu./«tusufx
rJCtd îtht htuz/rcÕzekd/jtRx/c{es Ft<tytu îtht cnth vtzJtbtk
ytJujt xuLzh sulw mcbeNl <t.01.07.2017 vAe fhJtlw &tg
GST Au.<uJt <btb xuLzhtubtk <&t nJu vAe cnth vtzJtbtk ytJlth
14. ltKt Ft<w vhevºt lkch -31,<t.07.07.2017 Wvhtuf< rJCtd/Ft<tltk <btb xuLzhtubtk (bxehegÕm+juch mÃjtg
bwsc mt&u) GST lt ltuxeVefuNl bwsc GST sgt jtdw vz<tu ntug
ðgt.mœhnw ftblt Bidder yu GST ltuxeVefuNl bwscle
yuÃjefucejexe ægtlbtk htFelu huxlw cezekd fhJtlw hnuNu.
mœh ftb rNzgwj ytuV buRLxulLm «fthlwk Au subtk ytJuj ytuljtRl me.me.yt.yum Vhegtœlt SLA (
Service Level Agreement) rvhegzbtk rlftj VhSgt< fhJtltu &tg Au.stu ytJuj ytuljtRl
me.me.yt.yum Vhegtœltu <ult SLA ( Service Level Agreement) rvhegzbtk rlftj fhJtbtk lne
ytJu <tu leau bwscle vulÕxe fhJtbtk ytJNu.
Sr no Deparmntent Category Problem SLA Period Penalty per
1. Engineering Footpath Road- 168 Hours
Contractor's Sign Addl.C.E.(west zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (WEST ZONE)
NAME OF WORK MAKING RCC ROAD & PAVER BLOCK WORK AT GAMTAL
AREA,KIRANPARK ,SORABAJI COMPUND AREA AND DIFF PLACES
& RANIP,NIRNAYNAGAR,CHANDLODIYA AREA AND DIFF PLACES
UNDER M.P SHREE/MLA SHREE/COUNCILLOR SHREE,CHAIRMAN
SHREE/MAYOR SHREE/SWARNIM /CAPITAL/REVENUE BUDGET
IN NAVA VADAJ WARD OF WZ(ARC)(SHEDULE OF
MEINTANANCE TYPE WORK)
Qty Item Unit Per Rate Amount
1 Dismantling the following including loading,
unloading and disposal of unserviceable
material for all lead or as directed by
Engineer-In-Charge and stacking the
serviceable material and backfilling the
resulting trenches and pits complete.
a 500 Dismentaling tiledof stone floors laid inmortar Smt 47.25
including stacking of serviceable materilas and
disposalofunserviceablematerialswithall
leadand lift.(R & B SOR-24-25,PAGE N0-
b 500 Demolition & disposal of unservisable Cmt 603.23
material with all lead and lift for
unreinforeced concrete. (R & B SOR-24-
25,PAGE N0-149,I.CODE-20001B5)
c 200 Demolition of Brick work and stone masonry Cmt 544.95
including stacking of serviceable materilas and
disposalofunserviceablematerialswithall
leadand lift.(ii) In Cement Mortar.(R & B SOR-
24-25,PAGE N0-149,I.CODE-20003B)
d 150 Demolition including stacking of serviceable Cmt 1047.38
materilas anddisposal of
unserviceablematerials with all lead and lift.
(i) R.C.C. work(R & B SOR-24-25,PAGE N0-
2 Extra Rate Over Item of Excavation of Earth
for excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including
demolishing the asphalt carpet, metal,s
oiling/cutting Reinforcement etc.comp. with
stacking the material as directed.
a 150 up to 0.20 meter thickness (By Manual) (AMC
ROAD WORK TENDER APPROVED RATE) Smt
b 500 0.20 to 0.30 meter (By any type of Breaker
Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc
complete. (AMC ROAD WORK TENDER
APPROVED RATE) Smt
3 1500 Box cutting the road surface to proper slope
and camber for making a base
for road work including removing the
excavated stuff and depositing on the
road side slope as directed upto
Mt.lead.(AMC ROAD WORK TENDER
APPROVED RATE) Smt
4 Conveyance charge of earth, lime, murrum,
building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any kind
executed outside the road site. Rate also
includes spreading & levelling etc complete.
Internal conveyance above 50 mt done within
the work site is not payable. ((AMC ROAD
WORK TENDER APPROVED RATE)
1800 d) Lead From 3 Km to 4 Km. Cmt 45.52
300 e) Lead From 4 Km to 5 Km. Cmt 52.42
200 f) Lead From 5 Km to 10 Km. Cmt 78.54
100 g) Lead From 10 Km to 15 Km. Cmt 104.65
5 100 Providing and laying cement concrete 1:5:10 Cmt 2457.01
(1Cement : 5- fine sand : 10- graded brick bat
aggregates 40mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth (R & B SOR-24-25,PAGE
N0-53,I.CODE-05009A)
6 Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base
course on well prepared surface and
compacting with vibratory roller to achieve
the desired density as per Codal
Provision.(AMC ROAD WORK TENDER
300 Production & Supply of WMM Cmt 1975.00
300 Laying of WMM Cmt 35.00
7 1500 Providing and Laying of Rubber Moulded Smt 501.60
Paver Block Grey/Coloured 60 mm thick, M-35
Grade of any size ; shape (Usually Uni-Paver
Blocks) using black trap good quality
aggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other
areas as mentioned in the drawing /
instruction of engineer in charge. Cost
includes formworks using rubber mould, Rate
providing and laying paver blocks as per
required grading and specification. The paver
block shall be mechanically compacted. The
work of paving blocks shall be executed in
line and level by skill mason of flooring work
only. It should be laid in such a way that the
no cutting of the paver block to be necessary.
if cutting of paver block necessary then it
should be cut by machine only and carting.
The finished surface of the paver block shall
have resonably good, plain finished. Paver
blocks shall be compacted and shall be relaid
if necessary. Gravel or such type of materials
shall not be allowed for production. Laying
on 5cms thick sand beddding.(AMC approved
8 1500 Providing and laying of interlocking grey Paver Smt 572.00
Blocks of high density 80mm thick made from
M-40 grade concrete using 6 mm to 20 mm
machine crushed well graded stone aggregate,
sand of approved quality, OPC 53 grade
cement with contractor's own concrete mix
design as approved by AMC, for parking, road.
Cost Includes formwork, using rubber/FRP
mould, laying paver block as per required
grading and specification laid paver block shall
be mechanically compacted. The work of the
paving blocks shall be executed in line and
level by skilled mason of flooring work only. It
should be laid in such a way that the no
cutting of the paver block to be necessary.
Cutting of paver block by machine cut only
and carting to be done. The Finished surface
of the Paver Block shall have reasonably good
plain finish. Paver blocks shall be compacted
and shall be re-laid if necessary. Gravel or
such type of materials shall not be allowed for
production. Laying on 5 Cms thick sand
9 1000 Paver Block Providing and laying shot blasted Smt 669.65
Non - interlocking, Paver blocks of specified
thickness, size, grade of concrete and colour
machine made and blasting by automatic shot
blasting machine and high density of as per
approved sample of approved make for
footpath, parking areas, service lanes,cross
over and other areas as mentioned in the
drawing. Including providing and laying
mm thick averave bedding layer of coarse
sand below paver block as per required
grading and specification. Laid paver block
shall be mechanically compacted. The work of
the paving blocks shall be executed in line and
level by skilled mason of flooring work only.
Small size of paver block with same
specification shall be used at residue or at
end. It should be laid in such a way that the no
cutting of the paver block to be necessary. If
cutting of paver block shall be required , than
cut by machine only and laying to be done by
skilled flooring mason. The finished surface of
the paver block shall have coarse sand Texture
Finish. Pave blocks shall be compacted and
shall be re-laid if necessary. Actual laid area
shall be measured and paid without any
wastage. (A) 60 mm thick M-35 grade Grey
Paver block of size 200mm x 200mm.
10 1000 Supplying and fixing of 300 mm-L x 150 mm-B
x 380 mm-H Kerb Block for Footpath in M-20
grade using 20 mm nominal size black trap
aggregate of Sevaliya/Timba or equivalent
quality for pre-cast blocks, reasonably
exposed finish/ formwork , mould with well
equipped with vibratory system for kerb
stones of approved design including curing,
etc. complete, including the cost of formwork
etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb
stones in line and level on 5 cm thick sand
bedding with necessary equipments and
materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of
the kerb stone fixed with Bituminous concrete
mixed in proper position as directed by
Engineer in change to form a portable
mixture. In any case Gravel or such type of
materials shall not be allowed for production.
a) Laying o(AMC approved Rate )n 5 cm thick
Sand Bedding. Rmt 350.89
11 1000 Supplying and fixing of 380 mm H x 300 mm L Rmt
x 200 mm B Kerb Block for Central Verge in M-
20 grade using 20 mm nominal size black trap
aggregate of Sevaliya/Timba or equivalent
quality for pre-cast blocks, reasonably
exposed finish/ formwork, mould with well
equipped with vibratory system for kerb
stones of approved design including curing,
etc. complete, including the cost of formwork
etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb
stones in line and level on 5 cm thick sand
bedding with necessary equipments and
materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of
the kerb stone fixed with Bituminous concrete
mixed in proper position as directed by
Engineer in change to form a portable
mixture. In any case Gravel or such type of
materials shall not be allowed for
productiona) Laying on 5 cm thick Sand
12 1000 Pre cast concrete kerb Providing and fixing Rmt
M25 Grade of concrete precast exposed / Fair
finish / texture finish kerb stones of approved
make as per approved sample of any size and
any type. Kerbs shall be fixed on the
foundation prepared as per approved design.
The rate shall also include for erecting and
fixing the pieces in position for complete kerb
system with chamfered type of kerbs
including necessary accessories of kerb like
radius kerb, angles and quadrant kerbs,
droplet kerbs etc. complete as per drawing.
Kerb shall be fixed as paper joint without any
jointing material. However cement mortar
shall be provided at the backside of kerb
stone joint. (Sample must be approved) Cost
of excavation, cutting , base , side filling shall
includes as directed engineer - incharge in
above item description as per BOQ (a)
hight x 600x 150 mm high median kerb.
13 1000 Pre cast concrete kerb Providing and fixing Rmt
M25 Grade of concrete precast exposed / Fair
finish / texture finish kerb stones of approved
make as per approved sample of any size and
any type. Kerbs shall be fixed on the
foundation prepared as per approved design.
The rate shall also include for erecting and
fixing the pieces in position for complete
kerbsystem with chamfered type of kerbs
including necessary accessories of kerb like
radius kerbs, angles and quadrant kerbs,
droplet kerbs etc. complete as per drawing.
Kerb shall be fixed as paper joint without any
jointing material. However cement mortar
shall be provided at the backside of kerb
stone joint. (Sample must be approved) Cost
of excavation, cutting , base , side filling shall
includes as directed engineer - incharge in
above item description as per BOQ (b) 380 x
600 x 150 mm high Footpath kerb.
14 50 Constructing Bombay Pattern Type Catch Nos
Pit of size 0.60 x 0.60 depth up to 1 mt
including excavation, B.B.C.C. (1:5:10),
cms thick brick maso. wall in the prop. of
CM (1:6) with 40 mm thick IPS flooring in
the prop M15 at bottom and 15 mm thick
cement plaster inside the catch pit in the
proportion of CM (1:3) with out jali etc.
comp. as directed.
15 50 CatchPit Jali (Heavy duty) Fixing P/F FRC Nos
catch pit jali with frame 600mm x 600mm
clear opening etc. comp.. As directed by
engineer in charge.
16 Providing and supplying,and jointing ISI mark
only standard length stoneware pipes of
following class and diameter including
excavation for laying of pipes, insurance,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to departmental stores, stacking
etc. compl. (IS651/1989 or its latest revision)
including labour work for lowering, laying,
joiting with cement mortar (1:1) proportion,
proper postion, grade and alignment
and all level as directed by engineer in charge
including store
to site of work jointing material etc complete
27 100 mm dia Rmt 211.05
30 150 mm dia Rmt 288.23
20 230 mm dia Rmt 400.54
17 Repairing damaged M.H. and rasing M.H. up
to road level incl. removing damaged brick
work and repairing by brick masonry in C.M.
1:5 and plaster in C.M. 1:3 and fixing C.I. steps
and existing MH sheet cover, removing the
debris from MH and carting the same as
70 (A) up to 0.15 mt. (@ Two Coarse) Nos 728.82
70 (B) up to 0.35mt. (@ Four Coarse) Nos 1155.44
18 1000 Labour work for fixing interlocking blocks / Smt 68.64
any kind of pavement on up to 50 mm th sand
bedding, levelling, watering and fixing in line
& level as well cleaning the site etc.comp. as
19 10000 Painting Two Coats on divider and footpath Smt
curb surface / New Concrete Surface (
Painting two coats after filling the surface with
synthetic enamel paint in all shades on new
plastered concrete surfaces)
20 Providing and laying cement concrete 1:4:8
(1Cement : 4- coarse sand : 8-
handbrokenstone aggregates 40 mm nominal
size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth (R & B
SOR-24-25,PAGE N0-52,I.CODE-05004A)
21 Providingand laying inposition
ReadyMixedM150gradeconcreteforreinforcedc
ementconctere work , using cement content as
per approved Design Mix manufactured in fully
automatic batchingplant
andtransportedtositeofwork in transit mixer for
a lead up to 10 kms having continuous
agitatedmixer, manufactured as per
mixdesignofspecifiedgradeforreinforcedcement
concretework includingpumpingof R.M.C. from
300.00 transitmixertositeof laying,excludingthecostof Cmt
centering shuttering finishing and
reinforcement including cost of admixtures in
recommended proportions asper IS:
toaccelerate/ retard setting of concrete,
improveworkabilitywithout
impairingstrengthanddurabilityasperdirectionof
theEngineer- in- charge.Without FlyAsh (Min
cement level as per latest IS 456 shall be
maintained) (R & B SOR-24-25,PAGE N0-
66,I.CODE-5054)
22 Providing and laying in position Ready Mixed
M200 grade concrete for reinforced cement
work , using cement content as per approved
Design Mix manufactured in fully automatic
batching plant and transported to site of work
transit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as
mix design of specified grade for reinforced
500 cement concrete work including pumping of Cmt
R.M.C. from transit mixer to site of laying,
excluding the cost of centering shuttering
and reinforcement including cost of admixtures
recommended proportions as per IS: 9103 to
accelerate/ retard setting of concrete, improve
workability without impairing strength and
durability as per direction of the Engineer - in -
charge. Without Fly Ash (R & B SOR-24-
25,PAGE N0-67,I.CODE-5055)
23 Providingand laying inposition ReadyMixedM
250gradeconcreteforreinforcedcementconctere
work , using cement content as per approved
Design Mix manufactured in fully automatic
batchingplant andtransportedtositeofwork in
transit mixer for a lead up to 10 kms having
continuous agitatedmixer, manufactured as
mixdesignofspecifiedgradeforreinforcedcement
concretework includingpumpingof R.M.C. from
500 transitmixertositeof laying,excludingthecostof Cmt
centering shuttering finishing and
including cost of admixtures in recommended
proportions asper IS: 9103 toaccelerate/ retard
setting of concrete, improveworkabilitywithout
impairingstrengthanddurabilityasperdirectionof
theEngineer- in- charge.Without FlyAsh (Min
cement level as per latest IS 456 shall be
maintained) (Cement level 450 kg (R & B
SOR-24-25,PAGE N0-67,I.CODE-5056)
24 Providingand laying inposition ReadyMixedM
300gradeconcreteforreinforcedcementconctere
work , using cement content as per approved
Design Mix manufactured in fully automatic
batchingplant andtransportedtositeofwork in
transit mixer for a lead up to 10 kms having
continuous agitatedmixer, manufactured as
mixdesignofspecifiedgradeforreinforcedcement
concretework includingpumpingof R.M.C. from
600 transitmixertositeof laying,excludingthecostof Cmt
centering shuttering finishing and
including cost of admixtures in recommended
proportions asper IS: 9103 toaccelerate/ retard
setting of concrete, improveworkabilitywithout
impairingstrengthanddurabilityasperdirectionof
theEngineer- in- charge.Without FlyAsh (Min
cement level as per latest IS 456 shall be
maintained) (Cement level 475 kg ) (R & B
SOR-24-25,PAGE N0-67,I.CODE-5057)
25 Providingand laying inposition ReadyMixedM
350gradeconcreteforreinforcedcementconctere
work , using cement content as per approved
Design Mix manufactured in fully automatic
batchingplant andtransportedtositeofwork in
transit mixer for a lead up to 10 kms having
continuous agitatedmixer, manufactured as
mixdesignofspecifiedgradeforreinforcedcement
concretework includingpumpingof R.M.C. from
250 transitmixertositeof laying,excludingthecostof Cmt
centering shuttering finishing and
including cost of admixtures in recommended
proportions asper IS: 9103 toaccelerate/ retard
setting of concrete, improveworkabilitywithout
impairingstrengthanddurabilityasperdirectionof
theEngineer- in- charge.Without FlyAsh(Min
cement level as per latest IS 456 shall be
maintained) (Cement level 500 kg (R & B
SOR-24-25,PAGE N0-67,I.CODE-5058)
26 Providingformworkofordinarytimberplankingso
as to give a rough finish including centering
shuttering strutting and propping etc. Height of
proppingandcenteringbelowsupporting floor to
300.00 ceiling not exceeding 4M. and removal of the Smt
same for in situ reinforced concrete and plain
concreteworkin.(A)FoundationsFootingsBases
of Columns etc. and Mass concrete.( R & B
SOR-24-25,PAGE N0-81,I.CODE-09001AA)
27 Hiring of Tractor with trolley considering 8 hrs. 2104.09
50.00 as working day hours incl. Driver.(GWSSB Days
SOR 2022-23,PAGE NO-105,ITEM NO-7)
28 Supplying Unskilled Labour( R & B SOR-24-
25,PAGE N0-43,I.CODE-L036 )
29 Hiring of Three wheeler carrier (Chakado
Rickshaw) considering 10 hrs. as working day
hours incl. Driver.(GWSSB SOR 2022-
23,PAGE NO-105,ITEM NO-7
30 Filling of Zari along the sides of the kerbstone
fixed, prepared with Bituminous Concrete
mixed in proper proportion as directed by
Engineer- In -Charge to form a pourable
mixture. (Street Devlopment of Dehgam Road
From Devi Cinema road tender)
ProvidingTMTBarFE550DreinforcementforR.C.
work including bending, binding and placing in
position complete upto floor two level ( R & B
SOR-24-25,PAGE N0-26,I.CODE-M689 )
32 Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto 50 Meter lead.(B) Dense or Hard soil( R
& B SOR-24-25,PAGE N0-50,I.CODE-
33 Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto 50 Meter lead.(A) Loose or soft soil( R
& B SOR-24-25,PAGE N0-50,I.CODE-
34 Filling in foundation and plinthwithmurrumor
selectedsoil inlayersof20cm. thickness
watering, ramming and consolidating etc.
complete( R & B SOR-24-25,PAGE N0-
50,I.CODE-04008A )
Contractor's Sign Addl.C.E.(west zone).
AHMEDABAD MUNI CIPAL CORPO RATI ON ENGI NEER DEP ARTMENT
NAVA VADAJ WARD
TECHNICAL SPECIFICATION
Name of Work :- MAKING RCC ROAD & PAVER BLOCK WORK AT GAMTAL
AREA,KIRANPARK ,SORABAJI COMPUND AREA AND DIFF PLACES &
RANIP,NIRNAYNAGAR,CHANDLODIYA AREA AND DIFF PLACES UNDER
M.P SHREE/MLA SHREE/COUNCILLOR SHREE,CHAIRMAN SHREE/MAYOR
SHREE/SWARNIM /CAPITAL/REVENUE BUDGET IN NAVA VADAJ WARD
OF WZ(ARC)(SHEDULE OF MEINTANANCE TYPE WORK)
Item No: 1 Dismantling the following including loading, unloading and disposal of unserviceable
material for all lead or as directed by Engineer-In-Charge and stacking the serviceable material and
backfilling the resulting trenches and pits complete..
a.Dismentaling tiledof stone floors laid inmortar including stacking of serviceable materilas and
disposalofunserviceablematerialswithall leadand lift.(R & B SOR-24-25,PAGE N0-149,I.CODE-
b. Demolition & disposal of unservisable material with all lead and lift for unreinforeced concrete.
(R & B SOR-24-25,PAGE N0-149,I.CODE-20001B5)
c. Demolition of Brick work and stone masonry including stacking of serviceable materilas and
disposalofunserviceablematerialswithall leadand lift.(ii) In Cement Mortar.(R & B SOR-24-25,PAGE N0-
149,I.CODE-20003B)
d. Demolition including stacking of serviceable materilas anddisposal of unserviceablematerials with all lead
and lift. (i) R.C.C. work(R & B SOR-24-25,PAGE N0-149,I.CODE-20002).
The rate shall be for a unit of Cmt. Basis
Item No.2 : Extra Rate Over Item of Excavation of Earth for excavation of asphalt pavement / RCC
of thickness up to 0.20 meter including demolishing the asphalt carpet, metal,s oiling/cutting
Reinforcement etc.comp. with stacking the material as directed. ( a. up to 0.20 meter thickness (By
The rate shall be for a unit of Smt. Basis.
a. up to 0.20 meter thickness (By Manual) (AMC ROAD WORK TENDER APPROVED RATE)
b. 0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine including cost
of operator, fuel, & transportation etc complete. (AMC ROAD WORK TENDER
APPROVED RATE).
The rate shall be for a unit of Smt. Basis.
Item No.3 : Box cutting the road surface to proper slope and camber for making a base
for road work including removing the excavated stuff and depositing on the
road side slope as directed upto 200 Mt.lead.(AMC ROAD WORK TENDER APPROVED RATE)
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any
such ordinary excavating implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls under
this category. For materials and workmanship for earthwork and excavation, relevant specification IS:
3764 & IS 1200 (Part I) shall be followed.
To protect persons from injury and to avoid damage to property, adequate barricades, construction
signs, red lanterns and guards as required shall be placed and maintained during the progress of the
construction work and until it is safe for the traffic to use the roadways. The relevant Indian standards and
the rules and regulations of local authorities in regards to safety provisions shall be observed.
The depth of the excavation shall be as required. The site shall be cleared and all obstructions,
loose stones, materials and rubbish of all kind, bush; wood and all type trees shall be removed, as directed.
The materials so obtained shall be the property of AMC and shall be conveyed and stacked as directed,
within 50-m. lead. The roots of the trees coming in the sides of the trenches shall be cut and coated with
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority /
Municipal Commissioner, before cutting shall be cut after obtaining such permission from them. The rate
of site clearance is deemed to be included in the rate of earthwork.
The excavation shall be carried out in true line and level and having width and depth, as shown in
the drawings or as directed. The Contractor shall do the necessary shoring and strutting or shall provide
necessary slopes to a safe angle or steps, as required or directed, at his own cost. No extra payment shall
be made for such precautionary measures, taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely, as directed, by removing excess soil and watering, as required. No earth
filling will be allowed for bringing it to level, if by mistake or any other reason, excavation is made deeper
or wider than shown on the drawings or as directed. The extra depth or width shall be made up with sand
filling, as specified for the bottom level of the subsequent finishing at the cost of the Contractor or as
directed by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of supporting all
utility services, lighting the excavated areas, separating and stacking serviceable materials neatly, shoring,
timbering, strutting, bailing out water either sub-soil or rainwater, including pumping at any stage of the
work. Excavated areas shall be kept free of water while masonry or concrete or relevant base works are in
progress and till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in backfilling the excavated areas wherever
required in layers, including ramming and watering, ensuring proper compaction etc. complete up to lead
of 50mt. The Contractor shall remove the balance of the excavated quantity from the site of work, to a
place, as directed by engineer in charge. The lead is the shortest practical route and not necessarily the
route actually taken. The decision of Engineer-In-charge shall be final in this regard. The measurement of
excavation of excavated area shall be made according to the sections shown on the drawing or as per
sections given by the Engineer-in-charge. The rate shall include for clearing the site, surface dressing,
making layout for road.
ITEM NO:- 4 : Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage,
sludge, excavated rock, fly ash, aggregates of any kind executed outside the road
site. Rate also includes spreading & levelling etc complete. Internal conveyance
above 50 mt done within the work site is not payable. ((AMC ROAD WORK TENDER
Lead From 3 Km to 4 Km.
Lead From 4 Km to 5 Km.
Lead From 5 Km to 10 Km.
Lead From 10 Km to 15 Km.
All the surplus earth etc. shall be carried away immediately from the site of work to a place within 5km. distance or as
directed and ordered by the Engineer, so as not to cause any inconvenience to the public traffic finding which in view
of public safety and traffic convenience. The corporation shall carry out the work by any other agency at the
contractor’s risk and cost. If the instructions are not completed within 7 days from the date of order to cart the surplus
materials and clear the site, the said work shall be carried out by the Municipal Corporation at the risk and cost of the
contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be carried out
by the contractor without asking any extra rate. The contractor shall have to cart the surplus earth after the trenches we
will watered and refilled with the sand. The rate of carting including carting of brickbats, metal, rubble vegetable and
garbage, if necessary to clear the road surface.
The rate shall be for a unit of one cubic meter.
as per requirement in site in cmt
Item No: 5 Providing and laying cement concrete 1:5:10 (1Cement : 5- fine sand : 10-
graded brick bat aggregates 40mm nominal size) and curing complete
excluding cost of formwork in (A) Foundation and Plinth (R & B SOR-24-
25,PAGE N0-53,I.CODE-05009A)
1.1 Water shall conform to M-1, Cement shall conform to M-3. Sand shall conform to M-6. Stone
aggregate 40 mm. nominal size shall conform to M-12.
2.0 Workmanship :
2.1 The relevant specification of item No 5.3.2.(A) shall be followed for the work except that the work is
to be carried out in cement concrete 1:5:10.
3.0 Mode of measurement and payment :
3.1 The concrete shall be measured for its length, breadth and depth. limiting dimensions to those
specified on plans or as directed.
The rate shall be for a unit of one cubic meter.
Item No: 6 Providing, laying, spreading and compacting graded stone aggregate to wet
mix macadam specification including premixing the Material with water at
OMC in mechanical mix plant carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base course on well prepared surface
and compacting with vibratory roller to achieve the desired density as per
Codal Provision.(AMC ROAD WORK TENDER APPROVED RATE)
Production & Supply of WMM
as per requirement in site in cmt
Item No: 7 Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35
Grade of any size ; shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm
nominal size for footpath, parking areas, service lanes and other areas as mentioned in the
drawing / instruction of engineer in charge. Cost includes formworks using rubber mould, Rate providing
and laying paver blocks as per required grading and specification. The paver block shall be mechanically
compacted. The work of paving blocks shall be executed in line and level by skill mason of flooring
work only. It should be laid in such a way that the no cutting of the paver block to be necessary. if cutting
of paver block necessary then it should be cut by machine only and carting. The finished surface of the
paver block shall have resonably good, plain finished. Paver blocks shall be compacted and shall be relaid
if necessary. Gravel or such type of materials shall not be allowed for production. Laying on 5cms thick
sand beddding.(AMC approved Rate )
. as per requirement in site in Smt
. Item No :- 08 Providing and laying of interlocking grey Paver Blocks of high density 80mm thick made
from M-40 grade concrete using 6 mm to 20 mm machine crushed well graded stone aggregate, sand of
approved quality, OPC 53 grade cement with contractor's own concrete mix design as approved by AMC,
for parking, road. Cost Includes formwork, using rubber/FRP mould, laying paver block as per required
grading and specification laid paver block shall be mechanically compacted. The work of the paving blocks
shall be executed in line and level by skilled mason of flooring work only. It should be laid in such a way
that the no cutting of the paver block to be necessary. Cutting of paver block by machine cut only and
carting to be done. The Finished surface of the Paver Block shall have reasonably good plain finish. Paver
blocks shall be compacted and shall be re-laid if necessary. Gravel or such type of materials shall not be
allowed for production. Laying on 5 Cms thick sand bedding.
as per requirement in site in smt
Item No :- 09 Paver Block Providing and laying shot blasted Non - interlocking, Paver blocks of specified
thickness, size, grade of concrete and colour machine made and blasting by automatic shot blasting
machine and high density of as per approved sample of approved make for footpath, parking areas,
service lanes,cross over and other areas as mentioned in the drawing. Including providing and laying
mm thick averave bedding layer of coarse sand below paver block as per required grading and
specification. Laid paver block shall be mechanically compacted. The work of the paving blocks shall be
executed in line and level by skilled mason of flooring work only. Small size of paver block with same
specification shall be used at residue or at end. It should be laid in such a way that the no cutting of the
paver block to be necessary. If cutting of paver block shall be required , than cut by machine only and
laying to be done by skilled flooring mason. The finished surface of the paver block shall have coarse sand
Texture Finish. Pave blocks shall be compacted and shall be re-laid if necessary. Actual laid area shall be
measured and paid without any wastage. (A) 60 mm thick M-35 grade Grey Paver block of size 200mm x
as per requirement in site in smt
Item No :- 10 Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb Block for Footpath in
M-20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba or equivalent quality for
pre-cast blocks, reasonably exposed finish/ formwork , mould with well equipped with vibratory system
for kerb stones of approved design including curing, etc. complete, including the cost of formwork etc.
complete. The rate shall also include necessary cutting of asphalt, fixing the Kerb stones in line and level
on 5 cm thick sand bedding with necessary equipments and materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb stone fixed
with Bituminous concrete mixed in proper position as directed by Engineer in change to form a portable
mixture. In any case Gravel or such type of materials shall not be allowed for production. a) Laying
o(AMC approved Rate )n 5 cm thick Sand Bedding.
as per requirement in site in Rmt
Item No :- 11 Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Kerb Block for Central Verge
in M-20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba or equivalent quality for
pre-cast blocks, reasonably exposed finish/ formwork, mould with well equipped with vibratory system for
kerb stones of approved design including curing, etc. complete, including the cost of formwork etc.
complete. The rate shall also include necessary cutting of asphalt, fixing the Kerb stones in line and level
on 5 cm thick sand bedding with necessary equipments and materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb stone fixed
with Bituminous concrete mixed in proper position as directed by Engineer in change to form a portable
mixture. In any case Gravel or such type of materials shall not be allowed for productiona) Laying on
cm thick Sand Bedding
as per requirement in site in Rmt
Item No :- 12 Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed / Fair
finish / texture finish kerb stones of approved make as per approved sample of any size and any type.
Kerbs shall be fixed on the foundation prepared as per approved design. The rate shall also include for
erecting and fixing the pieces in position for complete kerb system with chamfered type of kerbs including
necessary accessories of kerb like radius kerb, angles and quadrant kerbs, droplet kerbs etc. complete as
per drawing. Kerb shall be fixed as paper joint without any jointing material. However cement mortar shall
be provided at the backside of kerb stone joint. (Sample must be approved) Cost of excavation, cutting
base , side filling shall includes as directed engineer - incharge in above item description as per BOQ (a)
450 hight x 600x 150 mm high median kerb.
as per requirement in site in Rmt
Item No :- 13 Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed / Fair
finish / texture finish kerb stones of approved make as per approved sample of any size and any type.
Kerbs shall be fixed on the foundation prepared as per approved design. The rate shall also include for
erecting and fixing the pieces in position for complete kerbsystem with chamfered type of kerbs including
necessary accessories of kerb like radius kerbs, angles and quadrant kerbs, droplet kerbs etc. complete as
per drawing. Kerb shall be fixed as paper joint without any jointing material. However cement mortar shall
be provided at the backside of kerb stone joint. (Sample must be approved) Cost of excavation, cutting
base , side filling shall includes as directed engineer - incharge in above item description as per BOQ (b)
380 x 600 x 150 mm high Footpath kerb.
as per requirement in site in Rmt
Item No :- 14 Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt
including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with
mm thick IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the catch pit in
the proportion of CM (1:3) with out jali etc. comp. as directed.
as per requirement in site in Nos
Item No :- 15 CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear
opening etc. comp.. As directed by engineer in charge..
as per requirement in site in Nos
Item No :- 16 Providing and supplying,and jointing ISI mark only standard length stoneware pipes of
following class and diameter including excavation for laying of pipes, insurance, transportation, freight
charges, octroi, inspection charges, loading, unloading, conveyance to departmental stores, stacking etc.
compl. (IS651/1989 or its latest revision) including labour work for lowering, laying, joiting with cement
mortar (1:1) proportion, proper postion, grade and alignment
and all level as directed by engineer in charge including store
to site of work jointing material etc complete..
as per requirement in site in Rmt
Item No :- 17 Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing
MH sheet cover, removing the debris from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
as per requirement in site in Nos.
Item No :- 18 Labour work for fixing interlocking blocks / any kind of pavement on up to 50 mm th
sand bedding, levelling, watering and fixing in line & level as well cleaning the site etc.comp. as directed..
as per requirement in site in Smt
Item No :- 19 Painting Two Coats on divider and footpath curb surface / New Concrete Surface (
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered
concrete surfaces)
as per requirement in site in Smt
Item No :- 20 Providing and laying cement concrete 1:4:8 (1Cement : 4- coarse sand : 8-
handbrokenstone aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A)
Foundation and Plinth (R & B SOR-24-25,PAGE N0-52,I.CODE-05004A)
as per requirement in site in Cmt
Item No :- 21 Providingand laying inposition Ready Mixed M150 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully automatic
batchingplant andtransportedtositeofwork in transit mixer for a lead up to 10 kms having continuous
agitatedmixer, manufactured as per mix design of specifiedgradeforreinforcedcement concretework
includingpumpingof R.M.C. from transit mixer to site of laying,excluding the cost of centering shuttering
finishing and reinforcement including cost of admixtures in recommended proportions asper IS:
toaccelerate/ retard setting of concrete, improveworkabilitywithout
impairingstrengthanddurabilityasperdirectionof theEngineer- in- charge.Without FlyAsh (Min cement level
as per latest IS 456 shall be maintained) (R & B SOR-24-25,PAGE N0-66,I.CODE-5054)
as per requirement in site in Cmt
Item No :- 22 Providing and laying in position Ready Mixed M200 grade concrete for reinforced cement
concterework , using cement content as per approvedDesign Mix manufactured in fully automatic
batching plant and transported to site of work intransit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as permix design of specified grade for reinforced
cement concrete work including pumping ofR.M.C. from transit mixer to site of laying,excluding the cost of
centering shuttering finishingand reinforcement including cost of admixtures inrecommended proportions
as per IS: 9103 toaccelerate/ retard setting of concrete, improveworkability without impairing strength
anddurability as per direction of the Engineer - in -charge. Without Fly Ash (R & B SOR-24-25,PAGE N0-
67,I.CODE-5055)
as per requirement in site in Cmt
Item No :- 23 Providingand laying inposition Ready Mixed M250 grade concrete for reinforced cement
work , using cement content as per approvedDesign Mix manufactured in fully automatic
batchingplant andtransportedtositeofwork intransit mixer for a lead up to 10 kms having
continuous agitatedmixer, manufactured as permixdesignofspecifiedgradeforreinforcedcement
concretework includingpumpingof R.M.C. fromtransitmixertositeof laying,excludingthecostof
centering shuttering finishing and reinforcementincluding cost of admixtures in recommended
proportions asper IS: 9103 toaccelerate/ retardsetting of concrete, improveworkabilitywithout
impairingstrengthanddurabilityasperdirectionoftheEngineer- in- charge.Without FlyAsh (Min
cement level as per latest IS 456 shall bemaintained) (Cement level 450 kg (R & B SOR-24-25,PAGE N0-
67,I.CODE-5056)
as per requirement in site in Cmt
Item No :- 24 Providingand laying inposition ReadyMixedM
300gradeconcreteforreinforcedcementconctere
work , using cement content as per approved
Design Mix manufactured in fully automatic
batchingplant andtransportedtositeofwork in
transit mixer for a lead up to 10 kms having
continuous agitatedmixer, manufactured as per
mixdesignofspecifiedgradeforreinforcedcement
concretework includingpumpingof R.M.C. from
transitmixertositeof laying,excludingthecostof
centering shuttering finishing and reinforcement
including cost of admixtures in recommended
proportions asper IS: 9103 toaccelerate/ retard
setting of concrete, improveworkabilitywithout
impairingstrengthanddurabilityasperdirectionof
theEngineer- in- charge.Without FlyAsh (Min
cement level as per latest IS 456 shall be
maintained) (Cement level 475 kg ) (R & B SOR-24-25,PAGE N0-67,I.CODE-5057)
as per requirement in site in Cmt
Item No :- 25 Providingand laying inposition ReadyMixedM
350gradeconcreteforreinforcedcementconctere
work , using cement content as per approved
Design Mix manufactured in fully automatic
batchingplant andtransportedtositeofwork in
transit mixer for a lead up to 10 kms having
continuous agitatedmixer, manufactured as per
mixdesignofspecifiedgradeforreinforcedcement
concretework includingpumpingof R.M.C. from
transitmixertositeof laying,excludingthecostof
centering shuttering finishing and reinforcement
including cost of admixtures in recommended
proportions asper IS: 9103 toaccelerate/ retard
setting of concrete, improveworkabilitywithout
impairingstrengthanddurabilityasperdirectionof
theEngineer- in- charge.Without FlyAsh(Min
cement level as per latest IS 456 shall be
maintained) (Cement level 500 kg (R & B SOR-24-25,PAGE N0-67,I.CODE-5058)
as per requirement in site in Cmt
Item No :- 26 Providingformworkofordinarytimberplankingso as to give a rough finish including
centering shuttering strutting and propping etc. Height of proppingandcenteringbelowsupporting floor to
ceiling not exceeding 4M. and removal of the same for in situ reinforced concrete and plain
concreteworkin.(A)FoundationsFootingsBasesof Columns etc. and Mass concrete.( R & B SOR-24-25,PAGE
N0-81,I.CODE-09001AA)
as per requirement in site in Smt
Item No :- 27 Hiring of Tractor with trolley considering 8 hrs.
as working day hours incl. Driver.(GWSSB SOR 2022-23,PAGE NO-105,ITEM NO-7)
as per requirement in site in Per Days
Item No :- 28 Supplying Unskilled Labour( R & B SOR-24-25,PAGE N0-43,I.CODE-L036 )
as per requirement in site in Nos
Item No :- 29 Hiring of Three wheeler carrier (Chakado
Rickshaw) considering 10 hrs. as working day
hours incl. Driver.(GWSSB SOR 2022-23,PAGE NO-105,ITEM NO-7
as per requirement in site in Days
Item No :- 30 Filling of Zari along the sides of the kerbstone fixed, prepared with Bituminous Concrete
mixed in proper proportion as directed by Engineer- In -Charge to form a pourable mixture. (Street
Devlopment of Dehgam Road From Devi Cinema road tender)
as per requirement in site in Rmt
Item No :- 31 ProvidingTMTBarFE550DreinforcementforR.C.C.
work including bending, binding and placing in
position complete upto floor two level ( R & B SOR-24-25,PAGE N0-26,I.CODE-M689 )
as per requirement in site in Kgs
Item No :- 32 Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto 50 Meter lead.(B) Dense or Hard soil( R & B SOR-24-25,PAGE N0-50,I.CODE-04B001B )
as per requirement in site in Cmt
Item No :- 33 Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto 50 Meter lead.(A) Loose or soft soil( R & B SOR-24-25,PAGE N0-50,I.CODE-04B001A )
as per requirement in site in Cmt
Item No :- 34 Filling in foundation and plinthwithmurrumor
selectedsoil inlayersof20cm. thickness including
watering, ramming and consolidating etc. complete( R & B SOR-24-25,PAGE N0-50,I.CODE-04008A )
as per requirement in site in Cmt
Contractor’s Signature ADD. C.E
AHMEDABAD MUNICIPAL CORPORATION
EN G I N E E R I N G D E PA RTM E N T
Na m e of W o rk : - MAKING RCC ROAD & PAVER BLOCK WORK AT GAMTAL AREA,KIRANPARK
,SORABAJI COMPUND AREA AND DIFF PLACES &
RANIP,NIRNAYNAGAR,CHANDLODIYA AREA AND DIFF PLACES UNDER M.P
SHREE/MLA SHREE/COUNCILLOR SHREE,CHAIRMAN SHREE/MAYOR
SHREE/SWARNIM /CAPITAL/REVENUE BUDGET IN NAVA VADAJ WARD OF
WZ(ARC)(SHEDULE OF MEINTANANCE TYPE WORK)
T he wor k s ha l l be c o mp l e ted wi t h 1 2 M o nt hs a ft e r t he o rd er to sta rt t he wo r ks .
T he de tai l s o f r ei n for ce me n t o f R. C. C. wo r k s ha l l b e a s p er de s ig n a nd i nst r uc t io ns o f C i t y
E n g i neer / Add l . C i t y E ng ine er a nd hi s o r d e r wi l l b e co n si d er ed fi na l .
T he co nt ra cto r s h al l ha v e t o ma i nt a i n a cco u n t o f s tee l, ce me n t a nd o t her ma te r i a l s t hat ma y be br oug ht
b y h i m o n s it e. T h i s a cc ou n t s hal l b e re g u l ar l y ma i nt a i n ed a nd kept op e n fo r i ns pe ct i o n b y M u ni cip al
St a f f. W a te r i ng o f al l t h e i te ms s h a l l b e a s p e r i n s tr u ct io n s . M i xi ng of co ncr e t e s ha l l be do ne b y
co ncr e t e mi xe r mac h i ne . Ar ra n ge me n t s o f b i nd i n g vi b r ato r fo r R. C. C. wo r ks i f r eq uir ed s h al l ha ve to
be made b y t he co nt rac t or.
T he co nt rac to r s ha l l be r e ma i n re sp o n si b l e fo r W o r k me n ’s co mp e ns a t i o n i f a ny whe n s uc h c as e o cc ur s .
T he c o n tra c t or s ha l l ar r a ng e fo r me d a mp ers a n d in ni g h t a nd h e s ha l l b e r esp o n sib le f or a n y d a m age o f
li fe a nd l i mb o r p ro p er t y i f a n y hap p e n, d ur i n g t h e e xe c u t io n o f wor k. I n c a s e o f d is p ut e for u nse e n or
ov er l oo ked it e ms t h e de ci si o n o f t he ci t y E n g i n e er/ Ad d l. C it y E n g i n eer s ha ll b e fi na l. T he co nt r act or
s ha l l ha v e to gi v e s i t e cle a n o f a l l r ub b i s h o n co mp le ti o n o f wor k a nd ha ve ove r t h e bui ld i n g wi t h
fi na l fi n i s hi ng o f t he wo rk a s d ir ec t ed . Al l t h e r ej ect ed ma t er ia l s s h al l b e r e mo ve d fro m si te wi t hi n
ho ur s b y co ntr a ct or at t h is ri s k a nd co st.
Fo r mi xi ng mor ta r ei t he r fo r ma so n r y o r fo r p la st er o r fo r a n y o t her p ur pose c o nt ra cto r s h al l h ave to
pr epa re t hr o u gh o f b i g ger s iz e a nd mi x t he mo r t ar i n t he r eq ui r e d pro p o rti o n. I n o n c a se he s h al l b e
al lo wed to mi x t h e mor t ar e i t her o n fl o o r o r a n y f i ni s hed s ur fa ce s .
T he co ntr ac to r s h al l h a v e to ma k e h i s o wn a rr a n ge me n t fo r wa ter re q u ir ed for t he wo r k a nd s ha ll pa y
th e wa t e r c har ge s a s p e r wa te r me te r .
If a ny e x tr a i te m c ro p s up d ur i n g t he p ro g r e ss o f wo r k t he s a me s ha l l b e car r i ed o ut b y t h e co n tr ac tor
and he s ha l l b e p a i d a t t he ra t e fi xed b y C.E . / Ad d l. Ci t y E n gi n ee r a s per t he r a t e a na l ys i s ba sed o n
cur r e nt mar ke t r a t e s.
If i n t he i n ter e s t o f t h e Co r p o ra tio n i t i s ne c es sar y to c ha n g e e it her a ny s i t e o r t he d e s i gn of t he
pr op ose wo r k t he c o n tra ct or s h al l car r y o u t t he s a me at h i s q u o t ed rat e s wit ho u t c ha r g es a n y e xt ra a nd
th e co n tr ac tor wi l l ha ve to ca r r y o ut t he wo r k s a nd h e wi l l b e p ai d at t he ra t e q uot ed b y hi m a nd no
cl a i m fo r e xtr a fo r s ub se q ue n t c h a n g e s ma y b e e nt e rt ai n ed .
T he c ub i c al c o n te n t s of t he c e me n t b a g s ha ll b e ta ke n a s 1 -2 0 c f t. P e r b ag a nd t he co nt rac to r s s ha l l
ha ve t o p rep ar e t h e me a s ur e s b o x e s acc o rd i n g t o t hi s me a s ure .
T he R .C . C. o r s p ec i f ie d wo r k s ha ll no t b e d o ne o n S u nd a y a nd ho l i da y ex cep t i ng e me r ge nc y o r whe n
te c h nic a l r eq ui re me nt s a re s u c h t hat co n t i n ui t y o f wo r k s ho u l d b e mai nt ai ned a nd t ha t t o wi ll b e wi t h
Re te nti o n mo ne y a t t he rat e o f 2 % s h al l b e d e d uc t ed fro m e ver y r u nni ng bi ll o f t he co ntr ac t o r a nd
whi c h wi l l be p a id a t t he t i me o f fi na l b i ll .
Co nt r ac tor wi l l be ful l y re sp o n s ib le fo r co mp l i a nc e o f t h e va r i o u s pr e v i si o n und er co ntr a c t Ac t. 1 97
and t he R ule s fr a med fo r to u nd er .
T he t e nd er for t h e wo r k s h a l l r e ma i n o p e n fo r a p eri o d (1 2 0 ) d a ys fr o m t he da te o f op e ni n g o f t he
te nd e r s fo r t hi s wo r k a nd t h e t e nd er er s h a l l no t b e a llo wed to wi t hd ra w on mod i f y t he o ffer o n h is o wn
du r i ng t he pe ri o d. I f a n y t e nd ere r wi t hd r a w o r m ak es a n y mo d i f ic a t io n s ( s) or ad d i tio n ( s) i n t he ter ms
and c o nd it i o ns o f hi s te nder no t a cce p t ab le to t he M u n i c i p al C o rp ora ti on, t he M u nic ip a l Co rp ora ti o n
s ha l l wi t ho ut pre j ud ic e t o a n y r i g ht o r r e me d y b e at l i b er t y to for fe it i n f ul l t he sa id e ar nes t mo ne y
As pe r C ir c u lar N o . M C R 2 1 7 6 ( 9 6 ) 2 4 1 8 ( i i ) G HH d a t ed 3 1 -0 3 -7 7 is s ue d b y Go ve r n me n t o f G uj ar a t
co ntr a c to r s a re r eq ues t e d to p ro d uc e t he ir q ua r r y ma t er ia l s fo r co ns tr uct io n wor k t hro ug h le g al
so urc es . i. e . o nl y fo r m t he q ua r r y l ea se ho ld er s, p e r mi t ho ld er o r mi ddl e ma n who sa t i s fi e s t he
co ntr a c to r a s to t he l e ga li t y o f t h e so ur ce o f p ur ch a s e b y h i m o n t he s e m a ter i a ls .
If t h e wo r k i s no t c a r ri e d o u t wi t h i n t h e sp e c i fi ed t i me l i mi t p e n a l t y wi l l be c har ged a ppl ic ab le a s p er
Co nt r ac tor ha s t o ma ke hi s o wn a r ra n ge me n t f o r p ro c ur e me n t o f s t ee l a n d ce me n t.
i) Co ndi ti o n al te nd e r wi l l no t b e a c cep te d .
ii ) Al l t e nd er s a r e to b e s ub mi t ted i n d u p l ica te wi t h o ut wh i c h t he te nde r s ar e l i ab l e to b e r ej ec ted .
ii i ) I n ca se o f t e nd er d o wn l o ad e d fr o m we b s it e, t e n d er fe e & EM D s ho uld be s ub mi t ted i n for m o f
iv ) Co ndi ti o n o f fo r m B 1 S ta n da r d S p ec if ica t i o n o f ma t eri a l & co d e o f p rac ti c e w i ll be
ap p li ca b le . Fo r m B 1 & B 2 ca n b e is a v a i l a b le i n w e bs it e. Co n d it io n of For m B - 1 Fo r De f e ct
Wo r k s b o o k a v a i l a b l e f r o m Gu j a r a t Book Stores (Pvt.) Ltd. Sector-21,Gandhinagar,D E T A I L E D
G E N E R A L T E C HN I C AL S P E C I F I C A TI O N S c a n b e a va i la b le fr o m Ah me dab ad M uni ci pa l
Cor po ra tio n we b s it e “ www. e g o va mc . co m” .
Con t r act o r’ s S ig nat ur e A D D. C. E
ybœtJtœ BGþrlrmvj ftuvotuhuNl
vr©b Ítul - Esluh Ftðþ
1. Ft<t îtht «t&b LOI (juxh ytuV RLxebuNl) RMgw fhJtbtk ytJNu. LOI (juxh ytuV RLxebuNl) bégt
ctœ rœl-15 btk 5 % (vtka xft) juFu auf&e / rzbtLz z[tVTx / vu ytuzoh / luNljtEÍz cukf duhkxe&e zevtuÍex
Che fhthvºt fhJtltu hnuNu. <u ctœ Jfo ytuzoh RMgw fhJtbtkk ytJNu ylu Jfoytuzohle <theF&e mbg
bgtoœt NÁ &guj dKJtbt ytJNu <ub A<tk vK ftb NY fhJtbtk lrn ytJu <tu rlgbtlwmth ftgoJtne
2. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
3. xuLzh Jujezexe 180 r>Jm hnuNu.
4. xuLzh MJefthÔþk, h> fhÔþk, ftulu ytvÔþk ylu fgt CtJ&e ytvÔþk, <u ykdu zu. BGþrl. frb.©e ltu rlKog
5. xuLzh Chuj ftuLx[t¾xh vife ftuEvK ftuLx[t¾xhlu vK yt CtJu ftb ytvJtbtk ytJu <tu ceò btLg ftuLx[t¾xh
Jtk^tu jE NfNu lrn.
6. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftb NY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhÔþk
vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu yuÔþk atjNu lrn.
7. atÕþ ftbu ftuE vK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEllu LþfNtl
&Nu <tu <ule mkÃËKo sJtc>the (òlbtjle) ftuLx[t¾xhle vtu<tle hnuNu. mtEx vh ftb >hBgtl bswh fu
sl<tlt ftuE btKmlt òl btj fu LþfNtl &tg <ule sJtc>the ftuLx[t¾xhle hnuNu. vtujem Vhegt> &tg
<tu <ule sJtc>the vK ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <ule sJtc>the vK vtujem Vhegt>btk
ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu ytuhzwk ctk^e bsqh Ftztbtk W<thJt,
mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[t¾xh s vtujem Vhegt>btk
sJtc>th hnuNu ylu BGþrl. ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn.ytxÕþk mbSlu s
8. yt xuLzh su <u Jdolt btLg gt>elt ftuLx[t¾xhtu Che NfNu. dJbuoLxlt btLg ftuLx[t¾xhu y.BGþ.ftuvtuo. btk
btLg ftuLx[t¾xhle gt>ebtk hSMx[uNl ðþhk< fhtJÔþk vzNu.
9. yt Wvhtk< y.BGþ.ftuvtuo.lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu. Vtubo ce-1le Nh<tu
ck^lf<to hnuNu. ftb htuz ylu rcÕz´d Ftðþk - øþsht< htßglt MvuNeVefuNl «btKu fhJtLþk hnuNu <&t
MxtVle Mþalt vK mtEx Wvh atÕþ ftbu ægtlbtk juJtle hnuNu. ce-1 Vtubo <&t MvuNeVefuNl øþsht< çþf
Mxtuh, mu¾xh-21, dtk^eldh Ft<u&e ftuLx[t¾xhu ò<u bu¤Je juJtltu hnuNu. <u Jtkaelu vAe s xuLzh ChÔþk.
10. ftuLx[t¾xhlu vubuLx BGþrl. ftuvtuo. Ltt rl<erlgb Bþsc fhJtbtk ytJNu.
11. ftuEvK ftg>tfeg jexeduNl yb>tJt> Nnuhle ftuxobtk hnuNu.
12. bxehegj fu ceò xuMx´d hevtuxo ftuLx[t¾xhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt
ykdultu mkÃËKo Fao <&t BGþrl. MxtVlu juctuhuxhe Mþ^e <&t buLGþVu¾ah´d søgt Mþ^e jtJJt jE sJtltu Fao
vK ftuLx[tfhu CtudJJtltu hnuNu.
13. juch yu¾x «btKu hSMx[uNl ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu.
juch yu¾x «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[t¾xh mkÃËKovKu sJtc>th hnuNu.
14. btj su <u Mxtumo Wvh y&Jt mtEx Wvh Mþalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
15. muÕm xuût, ytu¾x[tug, mhatso, yLg xuût fu yLg ftuEvK fhJuht ChJtle sJtc>the ftuLx[t¾xhle hnuNu.
16. atEÕz juch yuBvjtug fhe NftNu lrn.
17. ftuLx[t¾xh îtht yuze.mexe.Rsluh©e / zu. mexe. Rsluh©ele mwalt bwsclt bxehegjltk muBvj hsw
18. ftuLx[t¾xhu atÕþ ftbu mtEx Wvh zeSxj fubuht&e ftb atÕþ > vnujtk, åttÕþ ftbu <&t ftb ÃËKo >lt
Vtuxtud{tV BGþrl. yturVmbtk ytvJtlt hnuNu.
19. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[t¾xh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle
btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
20. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt
hnuNu. ßgtk ftuE atuFJx l &E ntug ðgtk ytE.yum. ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk
21. htßg / fuL÷ mhfth©elt JF<tu JF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtlt nwfb mhfth©eyu fhuj
ntuE <u Bþsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
22. juch JuÕVuh Vkz btxu ntjbtk htßg mhfth©eyu fhujt nwfb Bþscle hfb cejbtk&e ftve juJtbtk ytJNu.
23. mœh ftb rNzgwj ytuV buRLxulLm «fthlwk Au subtk ytJuj ytuljtRl me.me.yt.yum Vhegtœlt SLA (
Service Level Agreement) rvhegzbtk rlftj VhSgt< fhJtltu &tg Au.stu ytJuj ytuljtRl
me.me.yt.yum Vhegtœltu <ult SLA ( Service Level Agreement) rvhegzbtk rlftj fhJtbtk
lne ytJu <tu leau bwscle vulÕxe fhJtbtk ytJNu.
Sr Deparmntent Category Problem SLA Penalty per
no Period one Problem
1. Engineering Footpath Road-Footpath 168
Repairing Hours
Wvhtu¾< Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkae Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mrn <&t me¬tu yuzeNlj mexe.Rsluh(vrùb Ítul)
1. Scope of Work
The work shall comprise the construction of a Reinforced Cement Concrete (RCC) road, including all necessary
preparatory, construction, finishing, testing and maintenance activities, complete in all respects as per approved
drawings, design, technical specifications and directions of the Engineer-in-Charge.
The scope shall include:
1. Site clearance and removal of existing damaged road, if required.
2. Excavation, cutting and filling to required levels.
3. Preparation and compaction of subgrade.
4. Providing and laying granular sub-base (GSB), wherever specified.
5. Providing and laying dry lean concrete (DLC), wherever specified.
6. Providing and fixing reinforcement steel, dowel bars and tie bars as per approved drawings.
7. Providing and laying RCC/Pavement Quality Concrete (PQC) of specified grade and thickness.
8. Construction of expansion, contraction and construction joints.
9. Surface finishing, texturing and curing.
10. Construction of shoulders, road edges and connections with existing roads.
11. Quality control and laboratory testing.
12. Cleaning and handing over the completed road.
13. Comprehensive maintenance during the three-year Defect Liability Period.
2. Site Preparation and Earthwork
The contractor shall inspect the site and verify existing ground levels before commencement of work.
Existing damaged pavement, loose material, vegetation and unsuitable soil shall be removed.
Excavation shall be carried out to the required width, depth and formation level as per approved drawings.
The excavated surface shall be properly dressed, watered and compacted using suitable mechanical
Any soft spots, loose soil or unsuitable material encountered shall be removed and replaced with approved
Proper slope and camber shall be maintained to ensure effective drainage of rainwater.
All underground utilities, drainage lines and existing service connections shall be protected during
3. Subgrade Preparation
The subgrade shall consist of approved soil and shall be prepared to the required line, level, width and
The subgrade shall be compacted to the specified density as per approved specifications.
The surface shall be free from loose material, organic matter and standing water.
Field density tests shall be conducted as directed by the Engineer-in-Charge.
No concrete work shall commence until the subgrade is inspected and approved.
4. Reinforcement Steel
Reinforcement steel shall be of approved make and conform to IS
Reinforcement shall be of the grade and diameter specified in the approved structural drawings.
Steel shall be free from loose rust, oil, grease, mud and other harmful substances.
Reinforcement shall be placed at the correct position with the specified spacing and cover.
Proper cover blocks of approved quality shall be provided.
Reinforcement shall be securely tied using binding wire.
Laps, anchorage and development length shall be as per approved structural drawings and relevant codes.
Reinforcement shall be inspected and approved before concrete placement.
5. RCC Concrete Road Work
5.1 Concrete Grade and Mix Design
Concrete shall be of the grade specified in the approved drawings and BOQ.
Mix design shall be prepared and approved before commencement of work.
Concrete shall be designed to achieve the specified compressive and flexural strength requirements.
Cement shall conform to the applicable BIS standards.
Fine and coarse aggregates shall be clean, hard, durable and properly graded.
Water shall be clean and suitable for concrete production.
Approved chemical admixtures may be used where necessary.
The water-cement ratio shall be maintained as per the approved mix design.
No additional water shall be added at site without approval.
5.2 Concrete Batching and Mixing
Concrete shall preferably be produced through an approved batching plant.
Batching shall be carried out by weight.
Proper control shall be maintained over cement, aggregate, water and admixture quantities.
Mixing shall be carried out uniformly to achieve homogeneous concrete.
Each batch shall be transported and placed within the permissible time.
Segregated or partially set concrete shall not be used.
5.3 Laying of RCC Concrete
The prepared base shall be inspected and approved before concrete placement.
Concrete shall be laid uniformly to the required thickness, width, gradient and camber.
Proper side forms or approved paving equipment shall be used.
Concrete shall be placed without segregation.
Adequate vibration shall be provided to achieve proper compaction.
Honeycombing, voids and segregation shall not be permitted.
The concrete shall be finished to the required line, level and surface profile.
Construction shall be planned to avoid unnecessary cold joints.
5.4 Surface Finishing
The top surface shall be finished uniformly.
Suitable broom or other approved texturing shall be provided to achieve the required skid resistance.
The surface shall not have undulations, depressions or water pockets.
Road camber and longitudinal gradient shall be maintained as per approved drawings.
Edges shall be properly finished without damage or honeycombing.
6. Construction of Joints
All joints shall be constructed in accordance with approved pavement design and drawings.
6.1 Expansion Joints
Expansion joints shall be provided at specified locations.
Approved compressible joint filler shall be provided.
Dowel bars shall be installed where specified.
Dowel bars shall be properly aligned and supported.
Approved joint sealant shall be applied after preparation of the joint.
6.2 Contraction Joints
Contraction joints shall be provided at specified intervals.
Joint cutting shall be carried out at the appropriate time to control random cracking.
The required depth and width shall be maintained.
Joint grooves shall be cleaned and sealed with approved material.
6.3 Construction Joints
Construction joints shall be provided wherever concreting is stopped.
Proper joint preparation shall be carried out.
Dowel bars or tie bars shall be provided wherever specified.
The joint shall be constructed to ensure proper load transfer and continuity as per design.
7. Curing of Concrete
Curing shall commence as soon as the concrete surface has hardened sufficiently without causing surface
Approved curing methods shall be adopted.
Wet curing shall be maintained for the period prescribed in the approved specification.
The concrete surface shall not be allowed to dry prematurely.
Traffic shall not be permitted until the concrete achieves the specified opening strength and the Engineer-
in-Charge approves opening to traffic.
8. Quality Control and Testing
The contractor shall arrange all necessary field and laboratory tests at his own cost, unless otherwise specified in the
The following tests shall be carried out as applicable:
1. Cement quality tests.
2. Aggregate gradation and quality tests.
3. Water quality tests.
4. Concrete mix design approval.
5. Slump/workability tests, where applicable.
6. Concrete cube compressive strength tests.
7. Concrete flexural strength tests.
8. Field density tests of subgrade and GSB.
9. Measurement of pavement thickness.
10. Surface level, camber and profile checks.
11. Inspection of reinforcement and joint arrangements.
All testing shall be conducted at the prescribed frequency under applicable standards and the approved Quality
Assurance Plan.
Any work or material found defective or not conforming to specifications shall be rejected and rectified or replaced
by the contractor at his own cost.
9. Applicable Standards
The work shall comply with the latest applicable editions and amendments of:
MoRTH Specifications for Road and Bridge Works.
IRC:SP:62 – Guidelines for Design and Construction of Cement Concrete Pavements for Low Volume Roads,
wherever applicable.
IRC:SP:83 – Guidelines for Maintenance, Repairs and Rehabilitation of Cement Concrete Pavements.
IS 456 – Plain and Reinforced Concrete.
IS 10262 – Concrete Mix Proportioning.
IS 383 – Coarse and Fine Aggregate for Concrete.
IS 1786 – High Strength Deformed Steel Bars and Wires.
IS 516 – Methods of Tests for Strength of Concrete.
IS 9103 – Concrete Admixtures.
Wherever any conflict arises, the approved contract conditions and drawings, applicable statutory requirements and
relevant technical standards shall govern, as determined by the Engineer-in-Charge.
10. DEFECT LIABILITY PERIOD (DLP) AND MAINTENANCE CLAUSE –
10.1 Defect Liability Period
The contractor shall be responsible for the proper performance, quality, stability and durability of the RCC road work
for a period of THREE (3) YEARS (36 months) from the date of certified completion and handing over of the entire
The three-year period shall be treated as the Defect Liability and Maintenance Period.
10.2 Contractor's Responsibility
During the entire three-year DLP, the contractor shall be responsible for inspecting, maintaining and rectifying all
defects arising due to:
Poor workmanship.
Defective or substandard construction materials.
Improper concrete mixing, placing, compaction or curing.
Inadequate concrete strength.
Improper joint construction or joint sealing.
Insufficient pavement thickness or reinforcement, where specified.
Improper subgrade or base preparation.
Settlement caused by defective execution of the work.
Cracks resulting from defective construction or workmanship.
Honeycombing, scaling, spalling or surface deterioration attributable to defective work.
Improper drainage arrangements forming part of the contractor's scope.
All such defects shall be rectified by the contractor at his own cost without any additional payment from the
10.3 Maintenance and Inspection
The contractor shall undertake regular inspection and maintenance throughout the 36-month period.
The maintenance activities shall include:
1. Regular inspection of the complete RCC road.
2. Identification and repair of cracks developed due to defective construction.
3. Repair or replacement of damaged or defective concrete panels.
4. Repair of damaged road edges and corners.
5. Rectification of surface scaling and spalling.
6. Repair of defective construction and expansion joints.
7. Replacement of defective joint sealant.
8. Rectification of settlement and depressions attributable to defective construction.
9. Cleaning of road surface and removal of construction-related debris.
10. Rectification of drainage defects within the contractor's scope.
11. Maintenance of road levels and riding quality as per approved specifications.
10.4 Crack Repair and Damaged Concrete Panels
Any crack attributable to defective construction shall be repaired using an approved repair methodology.
Hairline cracks, structural cracks and full-depth cracks shall be assessed by the Engineer-in-Charge.
Cracks requiring structural repair shall not be treated merely by applying surface cement slurry.
Where concrete panels are damaged, structurally unsound or beyond economical repair, the contractor shall
remove and reconstruct the affected panels.
Reconstructed panels shall conform to the original approved specifications, including concrete grade,
thickness, reinforcement and joint details.
No additional payment shall be made for such rectification.
10.5 Time Limit for Rectification
Upon receipt of written notice from the Engineer-in-Charge, the contractor shall attend to the defect within the
following time limits:
Nature of defect Rectification time
Dangerous road defect requiring immediate safety action Within 24 hours
Major cracks or damaged concrete panels Within 7 days
Joint sealant and joint defects Within 7 days
Minor surface defects Within 7 days
Other defects Within 15 days
The Engineer-in-Charge may prescribe a shorter period depending on the severity and public safety implications of
10.6 Failure to Rectify Defects
If the contractor fails to rectify any defect within the stipulated time:
The department shall have the right to get the defective work rectified through another agency.
All expenses incurred for such rectification shall be recovered from the contractor.
The department may recover the amount from the security deposit, retention money or performance bank
The department shall also have the right to take appropriate contractual action against the contractor.
Such action shall be without prejudice to any other rights available under the contract.
10.7 Exclusion from Contractor's Liability
The contractor shall not be responsible for damage established to have been caused exclusively by:
Accidents or vehicular impact.
Deliberate vandalism or third-party damage.
Unauthorized excavation or utility cutting by other agencies.
Abnormal loading beyond the approved pavement design.
Natural calamities or force majeure events, subject to the contract conditions.
However, the contractor shall promptly report such damage to the Engineer-in-Charge and take immediate
temporary safety measures.
The cause of damage and responsibility for repair shall be determined by the Engineer-in-Charge based on
inspection and supporting records.
10.8 Maintenance Register
The contractor shall maintain a proper maintenance register during the entire DLP.
The register shall contain:
Date of inspection.
Location of defects.
Nature and extent of damage.
Photographs before repair.
Date of complaint or notice.
Details of rectification carried out.
Photographs after rectification.
Certification by the Engineer-in-Charge.
The register shall be submitted whenever required by the department.
10.9 Performance Security During DLP
The contractor shall furnish and maintain the required security deposit/performance guarantee as stipulated in the
tender and agreement conditions.
The security shall remain valid for the prescribed period, including the three-year DLP and any additional claim
period specified in the contract.
Release of security shall be subject to satisfactory completion of all maintenance obligations and certification by the
competent authority.
10.10 Final Completion Certificate
After completion of the three-year DLP, the department shall inspect the entire road.
If all defects have been satisfactorily rectified and all maintenance obligations fulfilled, the Engineer-in-Charge shall
issue the final DLP completion certificate and recommend release of the applicable security deposit/performance
guarantee, subject to the agreement conditions.
11. GENERAL CONDITIONS
1. The contractor shall execute the work strictly as per approved drawings and specifications.
2. No deviation in concrete grade, pavement thickness, reinforcement or road levels shall be permitted
without prior written approval.
3. All materials shall be approved by the Engineer-in-Charge before use.
4. The contractor shall make arrangements for traffic diversion and safety during construction.
5. Barricading, warning signs, reflectors and adequate night safety arrangements shall be provided.
6. The contractor shall maintain cleanliness at the work site.
7. Any damage caused to existing underground utilities, drainage lines or adjacent properties due to the
contractor's activities shall be repaired at the contractor's cost.
8. The contractor shall provide all labour, machinery, tools, equipment, materials and supervision necessary for
proper execution.
9. All rejected work shall be removed and reconstructed at the contractor's own expense.
10. The contractor shall comply with all applicable labour, safety and statutory requirements.
12. COMPLETION AND HANDING OVER
The completed RCC road shall be handed over only after:
Completion of all construction activities.
Verification of pavement thickness and levels.
Satisfactory test results.
Completion of all jointing and sealing works.
Removal of surplus material and debris.
Approval of the Engineer-in-Charge.
Submission of test reports and as-built drawings, wherever required.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 14.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .