Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC All documents found are correct |
| 2 | L3₹1.1 Cr+₹94,735 (0.89%)Rejected-AOC | ₹1.1 Cr+₹94,735 (0.89%) | L3 | Rejected-AOC All documents found are correct |
| 3 | L3₹1.1 Cr+₹3.3 L (3.07%)Rejected-AOC | ₹1.1 Cr+₹3.3 L (3.07%) | L3 | Rejected-AOC All documents found are correct |
Tender Value
₹1.3 Cr
EMD Value
₹50,000
Closing Date
4 Apr 2023, 6:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER KD CIRCLE CHENGANNUR
GENERAL Kollamparambu Padasekharam KP Flood Mitigation prgramme and improving infastructural facilities of Kollamparambu Padasekharam in Thakazhy Panchayath General Civil Work
2023_Irrig_569381_1
IRR/KP/TR/7747/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Thakazhy Alappuzha
Please refer Tender documents.
12 documents required · 12 mandatory
₹6,508
Yes
₹50,000
Yes
17 May 2023
27 Mar 2023
12 Apr 2023
27 Mar 2023
4 Apr 2023
27 Mar 2023
27 Mar 2023 - 4 Apr 2023
Amount
PROTECTION OF OUTER BUND
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Clay Bund Formation
OD20567/2022-2023:Earthwork in rough excavation in or under water banking excavated clay in layers not exceeding 20 cm in depth, breaking clods and dressing up in embankment for roads ,floodbanks,marginal banks and guide banks with all kinds of soil under excavation instiff heavy kayal clay. Certificate :-Cetified that the observed data is prepared by taking the rates and labour and charges as per current schedule of rate and has been prepared as per the actual observation at the site in all kinds of soil.
sony scaria
Kuruvilla Mathew
Bidder Name
sony scaria
Kuruvilla Mathew
James Thomas
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_840463.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .