Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC | ₹14.8 L | L1 | Accepted-AOC First lowest |
| 2 | L2₹15.1 L+₹31,834.47 (2.15%)Rejected-AOC | ₹15.1 L+₹31,834.47 (2.15%) | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹15.2 L+₹43,934.71 (2.97%)Rejected-AOC | ₹15.2 L+₹43,934.71 (2.97%) | L3 | Rejected-AOC Third lowest |
| 4 | L4₹15.3 L+₹47,623.24 (3.22%)Rejected-AOC | ₹15.3 L+₹47,623.24 (3.22%) | L4 | Rejected-AOC fourth lowest |
| 5 | L5₹15.3 L+₹54,996.30 (3.72%)Rejected-AOC | ₹15.3 L+₹54,996.30 (3.72%) | L5 | Rejected-AOC Fifth lowest |
| Sl No | Description | Qty | Unit | V K M L5 | PK UNNENKUTTY L4 | ABDUL JALEEL L8 | Abdul Salam K P L7 | NAGARAJAN P L6 | Muhammed Raneesh L2 | NAUFAL C.A L1 | RATHISH KUMAR E L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Reconstruction of compoundwall | |||||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 66.04 | cum | 215.9 ₹14,258.04 | 214.9 ₹14,192 | 226.71 ₹14,971.93 | 226.7 ₹14,971.27 | 225 ₹14,859 | 212.64 ₹14,042.75 | 208.17 ₹13,747.55 Lowest | 214.35 ₹14,155.67 |
| 1.00 | OD39709/2024-2025:DRY RUBBLE MASONRY using departmental stone (OD Reference 60.7.1 irrigation) | 65.02 | cum | 1,437.91 ₹93,487.16 | 1,431 ₹93,037.9 | 1,509.97 ₹98,172.21 | 1,300 ₹84,520.8 Lowest | 1,526 ₹99,214.42 | 1,416.28 ₹92,080.86 | 1,386.43 ₹90,140.13 | 1,427.61 ₹92,817.49 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 65.13 | cum | 6,991.85 ₹4,55,393.17 | 6,958.5 ₹4,53,221.02 | 7,342.27 ₹4,78,216.73 | 6,900 ₹4,49,410.8 | 7,300 ₹4,75,463.6 | 6,886.71 ₹4,48,545.2 | 6,741.54 ₹4,39,089.98 Lowest | 6,941.78 ₹4,52,132.01 |
| 1.00 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 25.8 | cum | 6,099.83 ₹1,57,400.01 | 6,070.7 ₹1,56,648.34 | 6,405.55 ₹1,65,288.81 | 6,500 ₹1,67,726 | 6,270 ₹1,61,791.08 | 6,008.11 ₹1,55,033.27 | 5,881.46 ₹1,51,765.19 Lowest | 6,056.15 ₹1,56,272.89 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 35.16 | sqm | 639.3 ₹22,477.79 | 636.2 ₹22,368.79 | 671.33 ₹23,603.96 | 648 ₹22,783.68 | 630 ₹22,150.8 | 629.68 ₹22,139.55 | 616.41 ₹21,672.98 Lowest | 634.72 ₹22,316.76 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 7.2 | metre | 191.18 ₹1,376.5 | 190.3 ₹1,370.16 | 200.75 ₹1,445.4 | 200 ₹1,440 | 200 ₹1,440 | 188.29 ₹1,355.69 | 184.33 ₹1,327.18 Lowest | 189.8 ₹1,366.56 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 3.24 | sqm | 805.52 ₹2,609.88 | 801.7 ₹2,597.51 | 845.89 ₹2,740.68 | 800 ₹2,592 | 870 ₹2,818.8 | 793.4 ₹2,570.62 | 776.68 ₹2,516.44 Lowest | 799.75 ₹2,591.19 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.84 | cum | 11,264.52 ₹43,255.76 | 11,210.7 ₹43,049.09 | 11,829.08 ₹45,423.67 | 11,700 ₹44,928 | 11,000 ₹42,240 | 11,095.14 ₹42,605.34 | 10,861.25 ₹41,707.2 Lowest | 11,183.86 ₹42,946.02 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 3.2 | sqm | 323.61 ₹1,035.55 | 322.1 ₹1,030.72 | 339.82 ₹1,087.42 | 300 ₹960 Lowest | 360 ₹1,152 | 318.73 ₹1,019.94 | 312.02 ₹998.46 | 321.29 ₹1,028.13 |
Tender Value
₹18.3 L
EMD Value
₹45,762
Closing Date
3 Aug 2026, 4:00 pmClosed
Executive Engineer
PWD Buildings Division Palakkad
DEPOSIT Construction of compound wall for District Treasury Cherppulassery work General Civil Work
2026_PWD_862494_1
PWD/BLDG/TR/8880/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
Palakkad
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹45,762
Yes
8 Sept 2026
25 Jul 2026
6 Aug 2026
25 Jul 2026
3 Aug 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reconstruction of compoundwall | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | OD39709/2024-2025:DRY RUBBLE MASONRY using departmental stone (OD Reference 60.7.1 irrigation) | 0.4 | cum | - | - |
| 1.003 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 0.8 | cum | - | - |
| 1.004 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 1 | cum | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.006 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | - | metre | - | - |
| 1.007 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.008 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | cum | - | - |
| 1.009 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1458724.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
BOQ_1458724.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .