| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.4 LAccepted-AOC | L1 | Accepted-AOC technically qualified and quoted lowest amount | |
| 2 | L2₹65.1 L+₹7.7 L (13.4%)Rejected-Finance | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 | |
| 3 | L3₹65.5 L+₹8.2 L (14.2%)Rejected-Finance 21 SARSWATIPURAM KHARGAPUR GOMTI NAGAR LUCKNOW 226010 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | L3 | Rejected-Finance QUOTED HIGHER RATE THAN L1 | |
| 4 | L4₹65.9 L+₹8.6 L (14.9%)Rejected-Finance | L4 | Rejected-Finance QUOTED HIGHER RATE THAN L1 | |
| 5 | L5₹66.2 L+₹8.9 L (15.5%)Rejected-Finance GRAM POST LAGUCHA DISTRICT LAKHIMPUR KHERI UTTAR PRADESH | KHERI | UTTAR PRADESH | 261501 | L5 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| Sl No | Description | Qty | Unit | M/S KAPOOR TRADERS L2 | M/s RATHAUR CONSTRUCTION L3 | M/S K.K. TRADERS L7 | KRISHNA CONSTRUCTION L9 | M/S DEEPAK KUMAR AGARWAL L6 | Jagat Construction L5 | SRI NATH INFRA CONSTRUCTIONS LLP L8 | M/S SIYA RAM YADAV L4 | m/s munnu lal shukla L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in Making Road Diversion By Power transport with lead upto 5 Km including Excavation ,loading, unloading,Royalty ,dressing mechanical completion to achive 98% density. (For Upstream and downstream VRB) | 1,472.5 | Cum | 65 ₹95,712.5 | 90 ₹1,32,525 | 82.99 ₹1,22,202.78 | 87.3 ₹1,28,549.25 | 300 ₹4,41,750 | 80.13 ₹1,17,991.43 | 85.91 ₹1,26,502.48 | 80 ₹1,17,800 | 40 ₹58,900 Lowest |
| 2.00 | Earth work in making bund & strengthinig Of Bank with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles.(For Upstream and downstream VRB) | 1,920 | Cum | 90 ₹1,72,800 | 90 ₹1,72,800 | 111.99 ₹2,15,020.8 | 118.75 ₹2,28,000 | 120 ₹2,30,400 | 108.96 ₹2,09,203.2 | 116.8 ₹2,24,256 | 90 ₹1,72,800 | 40 ₹76,800 Lowest |
| 3.00 | Dry brick on edge pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. on road diversion (For Upstream and downstream VRB) | 275 | SQM | 480 ₹1,32,000 | 490 ₹1,34,750 | 511.99 ₹1,40,797.25 | 541.45 ₹1,48,898.75 | 475 ₹1,30,625 | 495.91 ₹1,36,375.25 | 531.63 ₹1,46,198.25 | 500 ₹1,37,500 | 400 ₹1,10,000 Lowest |
| 4.00 | Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.(For Upstream and downstream VRB) | 200 | Hr. | 150 ₹30,000 | 200 ₹40,000 | 179.99 ₹35,998 | 190.15 ₹38,030 | 100 ₹20,000 | 174.1 ₹34,820 | 186.64 ₹37,328 | 150 ₹30,000 | 20 ₹4,000 Lowest |
| 5.00 | E/w in cutting in foundation of box Culvert / Guide wall on channels including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge. (For Upstream and downstream VRB) | 264.34 | Cum | 90 ₹23,790.6 | 100 ₹26,434 | 123.99 ₹32,775.52 | 131 ₹34,628.54 | 60 ₹15,860.4 | 119.95 ₹31,707.58 | 128.59 ₹33,991.48 | 100 ₹26,434 | 40 ₹10,573.6 Lowest |
| 6.00 | Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete. (For Upstream and downstream VRB) | 31.68 | Cum | 1,010 ₹31,996.8 | 700 ₹22,176 | 1,087.99 ₹34,467.52 | 1,150.7 ₹36,454.18 | 980 ₹31,046.4 | 1,053.37 ₹33,370.76 | 1,129.24 ₹35,774.32 | 800 ₹25,344 | 300 ₹9,504 Lowest |
| 7.00 | Laying Plain Cement Concrete (M -15) in foundation 1:2:4 with stone grie including cost of material, labour, T&p etc, complete. (For Upstream and downstream VRB) | 67.87 | Cum | 5,800 ₹3,93,646 | 6,300 ₹4,27,581 | 5,899.99 ₹4,00,432.32 | 6,235.8 ₹4,23,223.75 | 5,430 ₹3,68,534.1 | 5,708.2 ₹3,87,415.53 | 6,119.35 ₹4,15,320.29 | 5,800 ₹3,93,646 | 4,900 ₹3,32,563 Lowest |
| 8.00 | Laying Plain Cement Concrete (M -10) in foundation 1:3:6 with stone grie including cost of material, labour, T&p etc, complete. (For Upstream and downstream VRB) | 10.87 | Cum | 5,900 ₹64,133 | 6,200 ₹67,394 | 5,649.99 ₹61,415.39 | 5,939.5 ₹64,562.37 | 5,300 ₹57,611 | 5,437.37 ₹59,104.21 | 5,829.02 ₹63,361.45 | 5,900 ₹64,133 | 4,500 ₹48,915 Lowest |
| 9.00 | Laying Reinforced Cement Concrete (M25) in foundation , wall, slab etc. in 1:1:2 with stone grit including cost of material, labour, T&p etc, complete. (For Upstream and downstream VRB) | 318.88 | Cum | 7,900 ₹25,19,152 | 7,600 ₹24,23,488 | 7,849.99 ₹25,03,204.81 | 8,313.3 ₹26,50,945.1 | 6,600 ₹21,04,608 Lowest | 7,610.09 ₹24,26,705.5 | 8,158.23 ₹26,01,496.38 | 8,500 ₹27,10,480 | 7,100 ₹22,64,048 |
| 10.00 | Bending,Binding,Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT. (For Upstream and downstream VRB) | 21.54 | MT | 70,000 ₹15,07,800 | 69,000 ₹14,86,260 Lowest | 72,399.99 ₹15,59,495.79 | 76,596 ₹16,49,877.84 | 72,000 ₹15,50,880 | 70,115.44 ₹15,10,286.58 | 75,165.77 ₹16,19,070.69 | 70,000 ₹15,07,800 | 70,000 ₹15,07,800 |
Tender Value
₹79.9 L
EMD Value
₹1.6 L
Closing Date
11 Aug 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE SIX CIRCLE LUCKNOW
SE SIX CIRCLE LUCKNOW
Amausi rajwaha ke km 1.545 par puliya nav nirman ka karya
2025_UPIDC_1061710_1
01/SE-6/2025-26
Open Tender
Civil Works
Fixed-rate
180 days
lucknow
Please refer tender document
2 documents required · 2 mandatory
₹3,154
₹1.6 L
SE SIX CIRCLE LUCKNOW
10 Sept 2025
1 Aug 2025
11 Aug 2025
1 Aug 2025
11 Aug 2025
1 Aug 2025
4 Aug 2025
Amount
Earth work in Making Road Diversion By Power transport with lead upto 5 Km including Excavation ,loading, unloading,Royalty ,dressing mechanical completion to achive 98% density. (For Upstream and downstream VRB)
Earth work in making bund & strengthinig Of Bank with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles.(For Upstream and downstream VRB)
Dry brick on edge pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. on road diversion (For Upstream and downstream VRB)
Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site.(For Upstream and downstream VRB)
E/w in cutting in foundation of box Culvert / Guide wall on channels including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge. (For Upstream and downstream VRB)
Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete. (For Upstream and downstream VRB)
Laying Plain Cement Concrete (M -15) in foundation 1:2:4 with stone grie including cost of material, labour, T&p etc, complete. (For Upstream and downstream VRB)
Laying Plain Cement Concrete (M -10) in foundation 1:3:6 with stone grie including cost of material, labour, T&p etc, complete. (For Upstream and downstream VRB)
Laying Reinforced Cement Concrete (M25) in foundation , wall, slab etc. in 1:1:2 with stone grit including cost of material, labour, T&p etc, complete. (For Upstream and downstream VRB)
Bending,Binding,Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT. (For Upstream and downstream VRB)
Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. (For Upstream and downstream VRB)
Providing & Fixing 110 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing (For Upstream and downstream VRB)
Class 150 Brick work in 1:3 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete. (For Upstream and downstream VRB)
Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc. as per drawing (For Upstream and downstream VRB)
Providing & Fixing Bitumen Joint filer Board For Expansion Joints. (For Upstream and downstream VRB)
Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete. (For Upstream and downstream VRB)
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.67 ltr/ 10 sqm)( apex Ultima,wethercoat, all Gard) (For Upstream and downstream VRB)
Dry brick on edge pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. on road diversion (For Upstream and downstream VRB)
M/S KAPOOR TRADERS (BID ID -5409677)
M/s RATHAUR CONSTRUCTION (BID ID -5410714)
M/S SIYA RAM YADAV (BID ID -5409650)
Jagat Construction (BID ID -5416314)
M/S DEEPAK KUMAR AGARWAL (BID ID -5417583)
M/S K.K. TRADERS (BID ID -5413729)
SRI NATH INFRA CONSTRUCTIONS LLP (BID ID -5412064)
KRISHNA CONSTRUCTION (BID ID -5414334)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .