Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.7 L+₹29,630 (4.62%)Rejected-AOC NULL | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | - | Rejected-Technical No work experience certificate produced | |
| 4 | Rejected-Technical | - | Rejected-Technical No work experience certificate produced | |
| 5 | Rejected-Technical | - | Rejected-Technical No work experience certificate produced |
Tender Value
₹6.8 L
EMD Value
₹17,032
Closing Date
29 Jun 2019, 6:00 pmClosed
Executive Engineer
PWD NH Division TVM
NH66(47) Investigation estimate for underpass in Vizhinjam Kattakada road at Balaramapuram Jn(580/300) and conducting topographic survey in old stretches of NH
2019_PWD_282939_1
E05/NHT/2019-20
Open Tender
Civil Works - Roads
Item Rate
30 days
Balaramapuram
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,503
Yes
online
₹17,032
Yes
1 Jan 2020
22 Jun 2019
2 Jul 2019
22 Jun 2019
29 Jun 2019
22 Jun 2019
Amount
1. Total Station Survey
56.12.b : Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.
2. Collection of Sub Grade Soil
od1047/2018_2019 : Collection of soil samples from subgrade for soil classification tests, Standard Proctor test and CBR test - Collection of sub-grade soil samples at one location as suggested by the engineer - in - charge - carefully by excavating pit of area 1mX0.6m from subgrade of formation area (30cm below original shoulder level) as directed by the engineer in charge for laboratory test and refilling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site.
3.Testing of Soil
od1048/2018_2019 : Conducting Soil Classification tests, Standard Proctor test and CBR test as per the Indian Standard code specifications - Conducting the test as per IS code guidelines and preparing result of one soil sample Code
4. Traffic Study
5.Inventory of Road and CD structures
od1050/2018_2019 : Data for Inventory survey for upto 15 metre wide road-including Survey work for collecting the details of road inventories and recording in the prescribed format attached based on chainage marking including marking chainage at 50m interval and taking details such as existing carriage way width, shoulder width, type of shoulder, width and location of approach road, details of existing drains,culverts and bridges as given in the prescribed format attached, pavement conditions (details of pot holes, ravelling, fog seal,slurry seal,edge damage etc.) road safety measures(details of road sign,crash barriers,guard stones,delineator post,hazard markers, etc.) and all other existing retaining structures in road,including documentation charges etc. as per the direction of the officers at site. Code
6. Pavement Composition
od1051/2018_2019 : Cutting open pit at the tar edge to get the details of the layers (thickness and type) of pavement composition - at one location as suggested by the engineer - in - charge - carefully - by excavating pit of area 1mX0.6m through overlying bituminous and granular layer ( including BC, DBM/BM, WMM & GSB)at tar edge and refilling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site and reporting the pavement composition with photographs and measurements specifying the type of layer
8. Soil Investigation
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soilBoring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.3.c.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
56.3.d.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.<br>In land.Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)<br>Machine boring for 5 bore holes.Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
2.3.1.A : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Manual Means<br>Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means
od3952/2018_2019 : Engaging labor for clearing the surveying area and for necessary arrangements at site as per the direction of Dept officers
AA AND S CONSTRUCTIONS
RTF INFRA PRIVATE LIMITED
MURUKAN.S
G S Infrastructure
Bidder Name
MURUKAN.S
G S Infrastructure
RTF INFRA PRIVATE LIMITED
AA AND S CONSTRUCTIONS
Synergy Architects and Engineers
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_384988.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .